Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Boiler Control Systems & Integration

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the supply and installation of control systems for prime contractors working on MHRA laboratory projects. The selected provider will be responsible for installing PLC/SCADA systems, programming automated steam delivery, and integrating boiler controls with existing facility management systems to ensure a fully operational and integrated boiler control system. Interested parties must hold ISO 9001 certification to be eligible. The project falls under NAICS code 541330, with the response deadline set for November 20, 2026.

General Info

Supply and install MHRA laboratory control systems. ISO 9001 required. Deadline November 20, 2026.

Agency

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of C458575.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replacement of Steam Boilers

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMhra
ContactsNo contacts available
OfficeN/A
Organization / AgencyMhra
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs control systems for prime contractors on MHRA laboratory projects. Installs PLC/SCADA systems, integrates boiler controls with facility management systems, and programs automated steam delivery. Requires ISO 9001. Delivers a fully operational and integrated boiler control system.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest
Solicitation # 2026-LOI-004
The City of Rogers, Arkansas, is seeking letters of interest from qualified consulting firms for professional planning, engineering, and related services to conduct the US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies. This project is funded by the U.S. Department of Transportation Safe Streets and Roads for All grant program and is administered by the Federal Highway Administration. The scope of work includes a safety, mobility, and access management assessment of the 6.7-mile US-71B corridor from W. Walnut Street to S. 8th Street to develop concept designs that reduce fatal and serious injury crashes. Additionally, the selected firm will evaluate the feasibility of grade-separated trail undercrossings at US-71B/W. Price Lane and US-71B/S. 28th Street, providing conceptual engineering designs, safety analyses, and cost estimates to be integrated into the final corridor report. Procurement is governed by 2 CFR Part 200 and 23 CFR Part 172, with all work subject to FHWA review and approval. Interested firms must submit a cover letter, an SF 330 Architect-Engineer Qualifications form, an equal employment opportunity policy, a DFA Illegal Immigrant Contractor Disclosure Form, and anticipated DBE subconsultant participation by 4:00 p.m. Central Time on November 3, 2026. Submittals will be scored on a 40-point scale based on professional staff, general reputation and civil rights responsiveness, experience with similar multimodal and safety projects, and past performance. The selection committee will use these criteria to shortlist firms, who will then receive a detailed scope of work to provide final proposals.
Community Development

POSTED

about 9 hours ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
SLED
Construction Management For Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)
Solicitation # 20261010005
The City of Pasadena Public Works Department is soliciting proposals for construction management services for the Holly Street Bridge Seismic Retrofit and Rehabilitation Project. Located in Los Angeles County, the project involves the rehabilitation of Bridge No. 53C-1041, spanning from Linda Vista Avenue to Arroyo Drive over Arroyo Boulevard and Arroyo Seco. The scope of work includes critical structural repairs such as spall and crack repairs on exterior and transverse girders, the installation of shear keys and restrainers for seismic retrofitting, and general improvements including the replacement of access boxes, lighting pull boxes, and water valve covers. Qualified contractors must hold Class A, B, and C-10 licenses and adhere to AASHTO LRFD Bridge Design Specifications, Caltrans Amendments, and City of Pasadena Standard Plans. Key requirements include the submission of all materials for City approval prior to construction, strict adherence to the City's Tree Protection Ordinance, and coordination with Underground Service Alert and the Public Works Senior Traffic Signal and Street Light Supervisor. The project involves significant quantities of structural concrete, bar reinforcing steel, and polyester concrete overlay, with all field dimensions requiring verification by the contractor before fabrication. The solicitation was posted on October 12, 2026, with a response deadline of October 29, 2026.
City of Pasadena, California, Public Works Department, Engineering

POSTED

about 10 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Mhra

Same awarding agency

New
International
Replacement of Steam Boilers
Solicitation # C458575
The MHRA is seeking tenders for the South Mimms Electric Steam Boiler Project at its laboratories in Potters Bar, Hertfordshire. The project involves the detailed design, supply, installation, testing, commissioning, and handover of a replacement steam-boiler system, specifically replacing three 3,900 kg/h gas-fired boilers with two 3,000 kg/h electric steam boilers. The scope encompasses all associated mechanical, electrical, controls, building, civil, and enabling works. Because the site is a live operational medical-research facility, the contractor must prioritize safe operations, electrical resilience, and the continuity of steam services. The estimated contract value is 5,833,333 GBP excluding VAT, with a performance period estimated from January 11, 2027, to April 10, 2028. The contract will be awarded under the NEC3 ECC Main Option A framework to the supplier providing the most advantageous tender based on price and quality. Key requirements for bidders include a minimum annual turnover exceeding 14 million GBP and the provision of Professional Indemnity Insurance with a limit of 10 million GBP per claim, maintained for 12 years post-completion. Tenders must be submitted in English via the Atamis Health Commercial System by November 20, 2026. Prospective suppliers are required to sign a Non-Disclosure Agreement to access full tender documents and will be evaluated on their ability to manage live-site risks, deliver measurable social value, and provide a technically credible design and executable programme.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS