Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Ohio was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boiler Replacement in Laboratory Building

Closed
10007912State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Toledo's Department of Public Utilities, Water Reclamation Division, is soliciting bids for the replacement of up to two existing industrial boilers located in the Laboratory Building at the Bay View Water Reclamation Plant. These boilers are integral for heating sludge within the anaerobic digesters. The procurement requires qualified contractors to submit comprehensive proposals including mandatory paperwork such as acknowledgment and acceptance of contract conditions, Toledo Municipal Income Tax compliance, Minority Business Enterprise (MBE) participation commitments, EEO compliance forms, subcontractor agreements, and certifications including debarment, suspension, child support compliance, and insurance. A 5% bid bond is required with the submission, and upon contract award, contractors must provide a performance bond and enter into a Project Labor Agreement (PLA) with the Northwest Ohio Building and Construction Trades Council for contracts exceeding $100,000. Certified payroll documentation must be submitted regularly starting two weeks after the commencement of work, and a pre-construction compliance meeting is mandatory. The contract emphasizes not only technical and performance standards but also strict adherence to labor and regulatory compliance frameworks. Bidders must demonstrate strong past performance, workforce welfare provisions—including health insurance, retirement plans, OSHA/EPA-compliant safety programs, and drug-free workplace policies—and robust MBE participation, with a 15% participation goal for construction projects. The PLA requires all contractors and subcontractors to be signatories under prevailing wage and local collective bargaining agreements, prohibiting strikes or work stoppages during the project. Compliance will be closely monitored, with penalties for violations. Evaluation factors extend beyond price to include bidder qualifications, project familiarity, employee safety and welfare, tax compliance, equal business opportunity adherence, and overall construction compliance such as deadlines, budget control, and change order management. The solicitation and all bid documents are submitted electronically via the City’s PlanetBids portal, with a submission deadline of February 17, 2026. Work is solely performed at the project site in Toledo with inspection and acceptance determined by the City. No detailed pricing, contract type, or specific delivery schedule is provided at this stage, reflecting the procurement’s current solicitation phase.

General Info

Replace two industrial boilers at Toledo Water Plant; require bonds, MBE, PLA, tax and labor compliance.

Agency

Ohio → DPU/Water Reclamation Department of City of ToledoView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Division of Water Reclamation, located at 3900 N. Summit Street, Building #1, Toledo, OH 43611, OH, USA

Set-Aside

NONE

Documents

(16)

PLA COT 2022.pdf

HTML

LOA_-_PLA_Public_Construction_Projects_Final_2021_COT.docx

HTML

Construction Project Paperwork 6.25.2025(Fillable).pdf

HTML

PLA_FAQ24B.pdf

HTML

Lucas Cnty PW Rates - Current as of 1-22-26.pdf

HTML

Exhibit A-Toledo Municipal Code 187.12.pdf

HTML

Bid_Spec_addition24.pdf

HTML

Tax Exemption Certificate - Construction 02.21.2025.pdf

HTML

BID SUBMITTAL CHECKLIST CONSTRUCTION 02.28.2025.pdf

HTML

Exhibit B- Construction Bid Matrix.pdf

HTML

Construction contracts greater 100K.pdf

HTML

RFQ Scope and Specifications 1-7912-Construction.docx

HTML

Child_Support_compliance.doc

HTML

Technical Specifications for Cleaver Brooks M5-700-6000-140HW.pdf

HTML

Construction Contract1-7912.pdf

HTML

Dimensional Diagram for Cleaver Brooks M5-700-6000-140HW.pdf

HTML

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DPU/Water Reclamation Department of City of Toledo
Contacts1 person available
OfficeOH, USA
Organization / Agency
Ohio → DPU/Water Reclamation Department of City of Toledo
View Agency Profile
Office AddressOH, USA
Contacts
Questions must be submitted thru the Q & A tab of this bidContact

Full Description

Show more
Scope: The City of Toledo DPU/Water Reclamation is seeking proposals from qualified vendors to replace up to two (2) existing industrial boilers located in the Laboratory Building at the City of Toledo / Bay View Water Reclamation Plant. The two boilers in the Laboratory Building provide heat for the sludge in the anaerobic digesters.
Notes: Forms with Bid Submission
As noted above, City forms must be filled out and attached to the bid. Project Paperwork includes the following: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate; Best Bid Criteria.
Other required forms include those noted in the Response Type Section and also noted in the Other Details Section: Signed Contract by Vendor CEO/President; Child Support Affidavit; Insurance Certificate listing the city of Toledo as an additional insurer; and Current Worker’s Compensation Certificate.
The following items will be required upon awarding the contract: Performance Bond and PLA, if applicable.
The successful bidder shall submit certified payrolls to the City for all labor performed on the project 2 weeks after start date then weekly thereafter.
Please Note; Pre-Construction meeting w/ Compliance is required prior to work starting.
Bid Bond: 5.00%