Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Bollard Removal and Salvage

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

South Gate, CA, 90280, USA

Set-Aside

NONE

Documents

This scope was carved out of 682-ST.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Uncontrolled Crosswalks Improvements On Tweedy Boulevard At Various Locations Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 7 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Uncontrolled Crosswalks Improvements On Tweedy Boulevard At Various Locations Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of South Gate
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removes and salvages existing bollards for prime contractors on City of South Gate street improvement projects. Extracts bollards from the ground and transports them for salvage using heavy lifting and extraction equipment per 2015 Caltrans Standard Specifications. Delivers four bollards removed and salvaged.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

More opportunities from California → City of South Gate

Same awarding agency

NAICS: 237310
New
SLED
Uncontrolled Crosswalks Improvements On Tweedy Boulevard At Various Locations Project
Solicitation # 682-ST
The City of South Gate is soliciting bids for project 682-ST, which focuses on uncontrolled crosswalk improvements at various locations along Tweedy Boulevard. The scope of work includes the reconstruction of ADA curb ramps, installation of eight rectangular rapid flashing beacons, signing and striping for four intersections, relocation of three street lights, removal of one tree, and the construction of 180 linear feet of new four-inch sidewalks. The contractor is responsible for providing all necessary materials, equipment, tools, and labor, and must ensure the prime contractor performs at least 51% of the total project work. All activities must comply with the 2024 Green Book, 2021 Standard Plans for Public Works Construction, 2015 Caltrans Standard Specifications and Plans, and the latest California Manual on Uniform Traffic Control Devices. The contract will be awarded to the lowest responsible bidder based on general competency, professional integrity, and a proven track record of successfully completing at least three similar projects. Required documentation for the bid includes a baseline schedule, traffic control plans, and a list of subcontractors. The successful bidder must provide a 100% payment bond, a faithful performance bond, and a worker's compensation insurance certificate. Additionally, the contractor must adhere to California prevailing wage rates and provide a certification of non-discrimination and affirmative action. There is no specific set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS