Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bonded Fiber Matrix Material Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 324199
DIBBS
Pumpable Fuel Blend Disposal (Rich >7K, <5% Chlorides, Non-Iso)The contract pertains to the disposal or reprocessing of high-BTU pumpable fuel blends characterized by a heating value exceeding 7,000 BTU per pound, chloride content below five percent, and a non-isoparaffinic hydrocarbon composition. These fuel blends are subject to specialized handling due to their energy density and chemical properties, requiring technically precise methods for safe and compliant management. The work is governed under NAICS code 324199, which classifies it under other petroleum and coal products manufacturing, indicating that the processes involved may include refining, blending, or conversion into usable or environmentally acceptable end products rather than simple disposal. This is a subcontract issued by the Defense Logistics Agency under the Department of Defense, solicited on August 5, 2026, and linked to contract SP450023D0003 with delivery order SP450026F7003. The place of performance and point of contact details are unspecified, suggesting that the location and coordination may be determined by the prime contractor or vary depending on operational needs. The absence of a set-aside designation indicates the contract is open to all qualified entities without preference for small, veteran-owned, or other designated categories. Compliance with environmental, safety, and technical specifications for chloride limits and molecular structure is critical to meet regulatory and operational standards.
Defense Logistics Agency

POSTED

3 months ago

DEADLINE

N/A

AI Contract Overview

Show more

This subcontract opportunity, issued by the California Department of Transportation, involves the supply of bonded fiber matrix material. The material is required for hydroseeding operations covering 889,920 square feet to ensure effective erosion and slope control along the Route 14 corridor. The solicitation was posted on March 26, 2025, with a response deadline of April 10, 2025. This procurement falls under NAICS code 324199 and is managed through the Cal eProcure system.

General Info

Caltrans seeks bonded fiber matrix material for Route 14 hydroseeding by April 10, 2025.

Documents

This scope was carved out of 07A6081.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB Minor B 07A6081 / Hydroseed planting for erosion control, wildfire prevention and weed abatement for Route 14

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Liner and Geosynthetic Material SupplyOpen now, due in 50 days
  • Blood Culture Reagent SupplierOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply bonded fiber matrix material required for hydroseeding over 889,920 square feet for erosion and slope control along the Route 14 corridor.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project issued by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29, from Coyote Creek Bridge to Diener Drive/Road 543, and Route 53 at Route 29. Key activities include cold planing of AC pavement, installation of Rubberized Hot Mix Asphalt Gap Graded overlay, and Hot Mix Asphalt Type A surfacing. The project also involves bridge work at Coyote Creek Bridge, drainage improvements, utility plans, and the installation of sinusoidal rumble strips and traffic stripe tape. The estimated cost for the project is 14.4 million dollars. Bids must be submitted via the Bid Express website by January 6, 2027, and must include bidder security of at least 10 percent of the bid. Proposed project durations must fall between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and includes strict requirements for Buy America/Build America compliance and environmental product declarations for concrete and asphalt. Contractors must adhere to rigorous environmental standards, including specific pressure washing protocols for equipment to prevent the spread of invasive species and compliance with the RWQCB basin plan. Performance must begin within 55 days of contract approval by the Attorney General, with a notice of start required 72 hours prior to activity. The project mandates the use of prevailing wages and requires a certified safety representative with specific Cal/OSHA or OSHA training and professional certifications. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification. Temporary concrete barriers must be fabricated at authorized facilities and meet MASH Test Level 3 safety standards.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS