Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Bonita School Drinking Water Improvements Project

Forecast
4200833-001CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Santa Maria-Bonita School District

Place of Performance

Bonita School Road/State Route 166/Black Road, CA, 93458

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Maria-Bonita School District
Contacts2 people available
OfficeN/A

Full Description

Show more
The State Water Board is funding the Project referred to internally as Bonita Elementary School Consolidation with City of Santa Maria. The components of the Project to be funded by the State Water Resources Control Board include the consolidation of Bonita Elementary School (School) with the City of Santa Maria (City) via approximately 8,100 linear feet of a two-inch diameter service line from the planned terminus of the City’s water system near the City’s wastewater treatment plant to the School. The existing on-site well and 10,000-gallon storage tank at the School will be repurposed for non-potable use to meet peak demand, fire flow requirements, and irrigation demand. A hydropneumatic tank with a maximum capacity of 1,000 gallons, an air compressor, above-grade piping, and isolation valves may be added to meet peak flow demands. Minor piping modifications will be made to disconnect the School’s existing onsite well system from its potable water system, after which the School will connect to the City’s municipal water supply. Other improvements include installation of blowoffs along the pipeline, replacement of interior lead service lines in an existing building, and other appurtenances on the School’s property.

Similar Contracts

Same NAICS industry code

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS