Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Bonita Valley Reservoir Residual Control System

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bonita Valley Reservoir Residual Control System project involves installing an automated system at Sweetwater Authority’s largest treated-water storage facility, which consists of two 9-million-gallon basins, to maintain a stable chloramine residual by precisely controlling the chlorine-to-ammonia ratio. This system is designed to prevent nitrification, a water quality issue that can arise during warm temperatures, low water demand, and high chlorine consumption, thereby safeguarding the integrity of the local water supply and reducing the need for costly temporary switches to imported water. The Residual Control System will be fully integrated with the Authority’s existing SCADA network to enable continuous remote monitoring, real-time alerts, and operational control, ensuring consistent water quality across the entire system. The installation will utilize existing infrastructure and utility connections within the current disturbed site boundary, with no new ground disturbance or expansion of facility capacity required. The project has been determined to be exempt from full environmental review under California CEQA § 15061(b)(3), the Common Sense exemption, based on its minimal environmental impact. Documentation was filed with the San Diego County Clerk’s Office and the State Clearinghouse, including a Certificate of Determination and Notice of Exemption, both dated in December 2025. While the project is administered by Sweetwater Authority’s Engineering and Operations Department with oversight from Land and Environmental Manager Israel Marquez, the procurement documentation lacks formal contract details such as a solicitation or contract number, pricing, contract type, payment office, accounting codes, or formal inspection criteria. No federal acquisition regulation clauses, packaging or marking standards, invoicing systems like WAWF, or contract administration roles such as COR or COTR were identified. The absence of a defined Section B indicates that the contract value is not publicly disclosed, and the overall procurement appears to follow a streamlined, locally managed process with no indication of competitive bidding or evaluation factors beyond environmental compliance.

General Info

Installs automated chloramine system to maintain water quality without new ground disturbance or environmental review.

Agency

California → Sweetwater Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Randy Ln, Bonita Rd, Moonview Dr, and Windrose Way, CA, 91902

Set-Aside

NONE

Documents

(2)

Exhibit 1 - Bonita Valley Reservoir and Control Building

PDFother

Bonita Valley Reservoir Residual Control System - Notice of Exemption Filing

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sweetwater Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sweetwater Authority
Office AddressN/A
Contacts
Israel MarquezLand and Environmental Manager

Full Description

Show more
This project will install a Residual Control System (RCS) at Bonita Valley Reservoir (BVR), the Authority’s largest treated-water tank (two independent 9-MG basins), integrated with SCADA for 24/7 remote monitoring. The purpose of the project is to maintain a stable chloramine residual (right chlorine-to-ammonia ratio) to prevent nitrification that can occur with warm temps, low demand, and high chlorine demand. This protects system water quality and reliability and can avoid costly short-term switches to imported water—potentially paying for itself by averting a single water-quality event (i.e. nitrification). The project benefits customers system-wide by providing more consistent and stable chloramine residuals. The system is highly automated and will be integrated into the Authority’s Supervisory Control and Data Acquisition (SCADA) system allowing remote monitoring and alarming capabilities. It also benefits ratepayers by reducing costs through decreased reliance on imported water should the local water source (Sweetwater Reservoir) become challenging to treat.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details