Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on May 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boulder to Erie Regional Trail (BERT) Preliminary and Final Design

Closed
RFQ-170-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 15 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Boulder County in Colorado has issued a solicitation for the development of comprehensive design plans for the Boulder to Erie Regional Trail (BERT). The project encompasses both preliminary and final design phases, requiring the selected consultant to produce detailed structural plans, conduct surveys, and secure necessary title reports. Additionally, the scope involves performing records research, documenting crossing agreements, and executing subsurface utility engineering to identify underground utilities. The project also includes analyzing drainage patterns and mapping wetlands to ensure environmental and infrastructural considerations are thoroughly addressed. The contract is valued between $500,000 and $2,000,000 and is open for responses until June 20, 2025. The initiative is managed by Boulder County’s procurement office, with interested parties encouraged to submit inquiries via email. The project aims to facilitate the development of a safe and sustainable regional trail, integrating environmental assessments and utility management to support regional connectivity and recreational infrastructure in Colorado. More details and the opportunity to respond can be accessed through the provided online portal.

General Info

Place of Performance

CO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Boulder County
Contacts1 person available
OfficeCO, USA
Organization / AgencyColorado → Boulder County
Office AddressCO, USA
Contacts
Boulder County Procurement

Full Description

Show more
Please do not include pricing. It will result in the disqualification of the proposal. Once a vendor is selected based on qualifications, the county will enter into negotiations on pricing.
Boulder County (the County) is seeking to hire a consultant to prepare preliminary and final design plans, structure plans, survey, title reports and other relevant records research, documentation of crossing agreements, subsurface utility engineering, drainage analysis, wetland mapping / delineation, environmental permitting and other items as appropriate to develop engineering phase documents for the Boulder to Erie Regional Trail (BERT) (the Trail). The Trail will follow an out-of-service railroad corridor in eastern Boulder County which extends from 61st Street in Boulder to E County Line Rd in Erie, an approximate distance of 8.5 miles. The Trail will be within the out-of-service rail corridor for the entirety of the alignment except where crossing Boulder County roadways and Colorado 287. The purpose of the Trail is to provide a multi-use trail connection between Boulder and Erie.
The Notice to Proceed for the preliminary design and final design scope and fee will be issued in separate task orders. A task order for final design is dependent on budgetary approval from the Board of County Commissioners and is anticipated to be a possibility in 2027 or 2028.
This project could potentially be constructed using alternative forms of project delivery such as Design-Build or Construction Management/General Contractor (CMGC) or another method. However, for the purposes of the RFP, assume a Design-Bid-Build process.
The Boulder to Erie Regional Trail (BERT) Plan which includes a Conceptual Alignment Plan on pages 134-165 of the document, will be the starting point and foundation for the Preliminary and Final design.
If you have any questions about the Boulder County procurement process, please email contact@example.gov.

[Americans with Disabilities Act and Equal Opportunity Notice](https://bouldercounty.gov/government/ada-eeo-notices/)

More opportunities from Colorado → Boulder County

Same awarding agency

NAICS: 541611
New
SLED
Grants Consultant for Public Health
Solicitation # PHI-005-26
Boulder County Public Health is seeking a qualified consultant for solicitation PHI-005-26 to support its public health funding strategy. The selected consultant will be responsible for identifying grant opportunities, developing high-quality and competitive grant applications, and creating reusable grant-development tools. The scope of work includes reviewing and enhancing existing applications, managing development timelines, and providing strategic input to maximize funding outcomes. The initial engagement is anticipated to last six months, with a maximum budget of 50,000 dollars and an option for extension based on performance and funding. The consultant is required to work on-site one day per week, with the remainder of the work performed remotely. The selection process will be conducted by a committee using a scoring matrix of 190 possible points, evaluating vendor qualifications, proposed methodology, and total cost. The contract is subject to federal grant compliance, including the U.S. Department of Treasury's Title VI regulations and the Davis-Bacon Act. Key requirements include adherence to Colorado accessibility standards for all work products and the provision of bid, performance, and payment bonds. Invoicing must be submitted by the 15th of each month with detailed itemization of labor and materials. Final payment is contingent upon the satisfactory completion of all work as determined by Boulder County Public Health.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Boulder Canyon Trail Repair Project
Solicitation # BID-326-26
Boulder County Parks and Open Space Department is soliciting proposals under solicitation BID-326-26 for the repair and reconstruction of a damaged segment of the Boulder Canyon Trail and its associated creekside slope protection wall. Located downstream of the intersection of HW 119 and Fourmile Canyon Drive, the project addresses significant scour that created a subsurface void beneath the trail surface and compromised the slope containment structure. The scope of work includes constructing a grouted boulder slope protection wall, restoring the trail approach to its pre-scour condition, reclaiming disturbed areas with native seed mixes, and ensuring the protection of two City of Boulder high pressure water lines. To maintain public access during construction, the contractor is required to operate a courtesy shuttle for pedestrians and cyclists. The project is expected to begin between December 2026 and January 2027. Award decisions will be based on the best value to the County and the determination of whether the firm is a responsible contractor via a Qualification Statement. Requirements include the submission of bid, performance, and payment bonds each equal to 100 percent of the proposed cost, as well as compliance with Davis-Bacon prevailing wage documentation and ADA standards. Technical specifications align with AASHTO, CDOT, and USDOT/FHWA guidelines. Final acceptance is contingent upon a joint inspection by the contractor and engineer and the completion of a deficiency punch list. Invoices must be submitted by the 15th of each month for work performed in the prior month.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS