This Solicitation opportunity from Department Of Defense was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BOWLING CENTER AND F&B UPGRADES
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the comprehensive renovation and modernization of an eight-lane bowling center, Building 485, located in El Centro, California, under the Navy Marine Corps Installations Command. The scope encompasses full architectural, civil, structural, mechanical, electrical, landscape, and fire protection design services, along with complete construction, demolition, and restoration activities to transform the facility into a fully operational entertainment venue featuring modern pinsetter units with string bowling technology, an electronic gaming area, and a food and beverage operation. The contractor is responsible for all materials, furnishings, equipment, and fixtures, including the handling, staging, delivery, and unloading of all items, and must conduct thorough site investigations including subsurface utility locates and pot holing. All designs must comply with federal, state, and local codes, with specific adherence to UFC 3-600-01 and NFPA 101 standards for fire protection, and must be submitted in accordance with detailed requirements outlined in Section H. The project budget is fixed at $2,300,000, and proposals exceeding this amount will not be accepted. This is a Non-Appropriated Fund Instrumentality (NAFI) action, which means the Federal Acquisition Regulation (FAR), DFARS, and other standard federal procurement rules do not apply; instead, the contract is governed by specific clauses cited within the solicitation. Key contractual requirements include the mandatory submission of Payment and Performance Bonds, compliance with construction wage rates as specified in Section J-12, and the retention of 10% of all payment applications until final acceptance. The contractor must maintain a robust quality control system, submit monthly progress payment requests using AIA Form G-702 and G-703, and provide as-built drawings and operations manuals prior to release of retainage. Evaluation for award is based on a best-value trade-off approach, with equal weighting given to technical factors—including proposed design solution, equipment compatibility, and contractor qualifications—and price. Proposals must be submitted in two separate volumes, technical and price, with strict formatting, labeling, and language requirements, and must be received by the deadline of July 7, 2026. All personnel must meet minimum experience thresholds, with key roles requiring at least five years of similar project experience and certain quality control roles requiring ten years. The contractor must also comply with environmental regulations, HSPD-12 identity verification, hazardous waste handling protocols in accordance with 40 CFR 2
General Info
Agency
NAICS
Place of Performance
El Centro, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility.
The Work includes, but not limited to:
1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer’s Representative (COR).
2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements.
3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.
More opportunities from Department Of Defense → Commander Navy Installations Command
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
