BOWLING CENTER AND F&B UPGRADES
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract encompasses the complete design and renovation of an eight-lane Bowling Center located in Building 485, including the replacement of the existing pinsetter units with new string pinsetter systems, the addition of an electronic gaming area, and upgrades to the food operation. The scope covers all demolition, installation, renovation, temporary construction, and restoration activities necessary to deliver a fully functional and modernized facility. The work involves thorough site investigations including surveys and utility locates, and requires coordination with installation personnel through the Contracting Officer’s Representative to ensure all conditions are properly addressed before and during construction. The contractor is responsible for providing comprehensive architectural, civil, structural, mechanical, electrical, landscape, and fire protection designs following all relevant codes and regulations. Additionally, the contractor must supply all materials, furnishings, equipment, fixtures, and related accessories, managing all logistical aspects such as material handling, transportation, delivery, and loading throughout the project phases. The solicitation, identified as NAVMWR-26-R-0038, is issued by the Commander Navy Installations Command, with the place of performance in El Centro, California. The proposal submission deadline is June 9, 2026, and the contracting officer for this project is Nika Maldonado, based in Millington, Tennessee.
General Info
Agency
NAICS
Place of Performance
El Centro, CA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility.
The Work includes, but not limited to:
1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer’s Representative (COR).
2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements.
3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.
