Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Braden Court PRS #1 Replacement and Transmission Valve Upgrade Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Braden Court PRS #1 Replacement and Transmission Valve Upgrade Project is a maintenance initiative by the El Dorado Irrigation District designed to improve the reliability and safety of its water transmission system in El Dorado County, California. The scope of work is divided into three primary locations: Braden Court, Carson Road, and Gold Hill Road. At Braden Court, the project involves replacing an aging pressure reducing station and its underground vault with new components housed in a prefabricated concrete vault, including the installation of 40 feet of new 6-inch piping. At Carson Road, the work focuses on the 24-inch El Dorado Mainline No. 1, requiring the installation of a butterfly valve and an air release valve assembly. At Gold Hill Road, the project entails replacing a 36-foot intertie between the El Dorado Mainline No. 1 and No. 2 by installing new 12-inch piping, two gate valves, and an air release valve assembly. Scheduled to commence in the spring of 2026, the project is expected to span approximately two months with work performed during standard business hours from Monday through Friday. Construction activities will utilize various equipment, including excavators, dump trucks, and loaders, and will require excavation and shoring at multiple sites. The District has ensured environmental compliance through a Notice of Exemption, as the project involves replacing existing facilities without expanding their use. All construction debris must be disposed of according to regulatory requirements, and disturbed areas will be stabilized using best management practices for erosion control. The project is managed by the El Dorado Irrigation District, with primary oversight provided by their Environmental Review Analyst.

General Info

El Dorado Irrigation District will upgrade valves and piping across three California sites.

Agency

California → El Dorado Irrigation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

U.S. HWY 50, Carson Road, and Gold Hill Road, Placerville, CA, 95709

Set-Aside

NONE

Documents

(1)

NOE - Braden Court PRS #1 Replacement and Transmission Valve Upgrade Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Doug VenableEnvironmental Review Analyst

Full Description

Show more
The El Dorado Irrigation District (District) proposes to conduct maintenance on its water transmission system, including the replacement of a pressure reducing station (PRS) and two transmission mainline valve assemblies at three locations in El Dorado County, CA. Braden Court The District utilizes PRSs throughout the drinking water service area to maintain safe and manageable water pressure. The Braden Court PRS, constructed in 1982, has developed a breach in the valve housing and has reached the end of its service life. The project involves excavating and removing the existing PRS and underground vault, and replacing them with new PRS components housed in a prefabricated concrete vault. The area will be excavated to accommodate a new vault measuring approximately 7 feet long, 4 feet wide, and 6 feet deep. New pressure-reducing valves and appurtenances will be installed, along with approximately 40 feet of new 6-inch piping to connect to the existing distribution system. Carson Road The El Dorado Mainline No. 1 is a 24-inch transmission pipeline that supplies drinking water to the west slope of El Dorado County. To improve system reliability, this pipeline requires an isolation valve and an air release valve to allow for proper shutdown and maintenance. The project includes installing a butterfly valve, an air release valve assembly, and associated appurtenances. The pipeline will be excavated and shored as needed for the new valve installation. Following backfill and compaction, the air release valve vent will be installed aboveground, housed in a metal enclosure painted a neutral color, and the site will be graded to match preexisting contours. Gold Hill Road One of the valves isolating the intertie between the El Dorado Mainline No. 1 and No. 2 has failed and has reached the end of its service life. The project involves replacing the approximately 36-foot intertie including two isolation valves and an air release valve assembly. Work will include installing new 12-inch piping, two gate valves, an air release valve assembly, and associated appurtenances. The pipeline will be excavated and shored as needed for the valve installation. Following backfill and compaction, the air release valve vent will be installed aboveground, housed in a metal enclosure painted a neutral color, and the site will be graded to match preexisting contours. The project is scheduled to begin in the spring of 2026 and is expected to last approximately two months, with work occurring during normal business hours of 7 a.m. to 6 p.m., Monday through Friday. Construction equipment is anticipated to include a small excavator/backhoe, dump truck, loader, compactor, crew trucks, and miscellaneous hand and power tools. All construction debris generated by the project will be removed and disposed of in compliance with all applicable regulatory requirements. Disturbed areas will be stabilized using appropriate best management practices for erosion control.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS