Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on July 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Brent Boulevard Sidewalk Improvements

Closed
IFB-2026-071State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
City of Walnut Grove

POSTED

about 21 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Kyle is soliciting bids for sidewalk improvements along the south side of Brent Boulevard from the IH-35 Northbound frontage road to the intersection with Philomena Drive, under solicitation number IFB-2026-071. The project scope includes installing concrete curb ramps, new sidewalk, curb and gutter, striping, signing, and removal and replacement of existing concrete. All work must comply with applicable standards, codes, and TxDOT specifications, with inspections and acceptance occurring at the project site. The contract requires the contractor to submit detailed documentation including shop drawings, samples, safety certifications, financial statements, and resumes of key personnel, along with diverse business certifications and proof of insurance. Proposals must be submitted electronically via the OpenGov Procurement Portal by 5:00 PM on July 30, 2026, and are expected to be evaluated on a lowest-priced technically acceptable basis. The contract is structured as a hybrid stipulated price arrangement with a detailed unit price schedule, though no final contract value is specified due to blank pricing fields in the bid items. The place of performance is strictly the project site, and the contractor is responsible for all materials, labor, equipment, and compliance with federal requirements including Buy America provisions and record retention per 2 CFR §200.333 and §200.336. Payment procedures, invoicing systems, and accounting codes are not detailed, and while no formal FAR clauses are incorporated, the contract mandates adherence to state and local regulatory frameworks. Key personnel must be approved prior to commencement, and the contractor must maintain active certifications for small, minority, woman-, veteran-, and HUBZone-owned businesses if claimed. A bid bond is required, and the contract must be fully executed by September 8, 2026, with a Notice to Proceed anticipated in September 2026. No military standards, bar-coding, packaging, or preservation requirements are specified beyond material compliance and labeling of samples with supplier, catalog, and technical data.

General Info

Sidewalk improvements on Brent Boulevard with concrete curb ramps, signage, and compliance with TxDOT and Buy America standards.

Agency

Texas → Transportation & Public WorksView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(2)

BRENT_BLVD_BID_PLANS.pdf

PDF

Brent Boulevard Sidewalk Improvements IFB-2026-071

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Transportation & Public Works
Contacts1 person available
OfficeKyle, TX, 78640, USA
Organization / Agency
Texas → Transportation & Public Works
View Agency Profile
Office AddressKyle, TX, 78640, USA
Contacts
Kelsey SteeleSenior Budget Analyst

Interested Companies (15)

Show more
United Traffic Control Solutions
MAPLE VALLEY, Washington
Amtek
Tomball, TX
Solar Surveying
Houston, TX

See All 15 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project consists of improvements to an existing sidewalk along the south side of Brent Boulevard from IH-35 Northbound frontage road to the intersection of Brent Boulevard with Philomena Drive. The improvements required for this project include concrete curb ramps, sidewalk, curb and gutter, striping, signing, and concrete removal and replacement.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS