Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Oregon was posted on July 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bridge Abutment Repair

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste removal, and coordinating with testing laboratories and geotechnical engineering services. Construction will be subject to rigorous material characterization tests, including California Bearing Ratio and Plate Load tests, with operations phased to allow for continuous subgrade adjustments. Work is generally scheduled for normal business hours, Monday through Friday, though some after-hours or weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 8 hours ago

DEADLINE

in 3 months
NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Dalton Utilities

POSTED

3 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Oregon Department of Fish and Wildlife is seeking a subcontractor for a bridge abutment repair project. The scope of work focuses on structural improvements, specifically requiring expertise in concrete work, formwork, reinforcement, and general site preparation to ensure the stability of the bridge abutments. This opportunity was posted on July 2, 2025, and requires responses to be submitted by the deadline of August 5, 2025. The project is categorized under NAICS code 237130, which pertains to highway, street, and bridge construction.

Documents

This scope was carved out of S-63500-00014271.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bridge abutment repairs- Bridge Creek WLA

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon Department of Fish and Wildlife
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Repair of structural bridge abutments including concrete work, formwork, reinforcement, and site preparation.

More opportunities from Oregon Department of Fish and Wildlife

Same awarding agency

NAICS: 113310
SLED
Large Wood Harvest Staging - Anthony Creek Uplift
Solicitation # S-63500-00018165
The Oregon Department of Fish and Wildlife is soliciting bids for the Large Wood Harvest Staging project at Anthony Creek Uplift. The objective is to prepare materials for the restoration of approximately 1.5 miles of floodplain to improve habitats for sensitive fish, wildlife, and winter ungulates. The selected contractor will be responsible for harvesting, sorting, transporting, and staging woody materials from forest stands within or adjacent to the Elkhorn Wildlife Area. Specifically, the scope includes harvesting 70 trees for racking material (4 to 12 inches DBH and 15 to 20 feet in length) and transporting 1,850 cubic yards of conifer slash. All materials must be staged across six designated areas within the project site. All field work must be completed by June 30, 2027, with operational restrictions including limited skidding and a winter closure from December 1 to April 10. The project is funded by the United States Fish and Wildlife Service and is subject to federal terms and conditions. Bids are due by November 16, 2026, and will be awarded to the responsible bidder providing the lowest responsive bid, with a 10 percent price preference applied to Oregon residents and Oregon Small Business Enterprises. Contractors must provide one-week notice before starting fieldwork and adhere to strict habitat protection standards. Payment is based on completed and accepted deliverables, with a one-year warranty period for defective work.
Logging

POSTED

18 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS