Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Bridge Deck & Structural Concrete Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Bridge Deck and Structural Concrete Installation involves performing concrete placement for prime contractors on bridge rehabilitation projects for the City of Lebanon and the New Hampshire Department of Transportation. The scope of work includes the installation of reinforcing steel and both partial-depth and full-depth precast deck panels in accordance with Section 544, utilizing specialized equipment such as concrete falsework, pumps, and vibrating tools. The contractor is responsible for providing all necessary concrete mix designs and certificates of compliance to ensure the successful delivery of installed structural concrete elements. The project is managed by the New Hampshire Public Works Engineering agency under NAICS code 238110. Interested parties must submit their responses by the deadline of October 22, 2026, following the posting date of September 25, 2026.

General Info

Subcontract for bridge concrete installation in Lebanon, NH, due by October 22, 2026.

Documents

This scope was carved out of 2026-RFx-058.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Lebanon 24222 NH Route 120 (Hanover Street) Bridge Rehabilitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Hampshire → Public Works - Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs concrete placement for prime contractors on City of Lebanon/NHDOT bridge rehabilitation projects. Installs partial-depth and full-depth precast deck panels and reinforcing steel per Section 544. Utilizes concrete falsework, pumps, and vibrating equipment. Provides concrete mix designs and certificates of compliance. Delivers installed bridge deck and structural concrete elements.

Similar Contracts

Same NAICS industry code

More opportunities from New Hampshire → Public Works - Engineering

Same awarding agency

NAICS: 237310
New
SLED
Lebanon 24222 NH Route 120 (Hanover Street) Bridge Rehabilitation
Solicitation # 2026-RFx-058
The City of Lebanon has issued solicitation 2026-RFx-058 for the rehabilitation of the NH Route 120 (Hanover Street) bridge over NHRR. The project involves replacing the existing 15-inch deep prestressed deck beam superstructure with 12-inch deep beams of varying lengths while maintaining the existing tunnel substructure. Additional scope includes refacing both abutments, performing concrete repairs to sidewalks and retaining walls, and replacing existing approach slabs with 20-foot precast slabs. Roadway approach work is limited to approximately 50 feet on each side. The engineer's estimate for the work is between 2.3 million and 2.5 million dollars, with the contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must be listed on the NHDOT Prequalified Contractor's List for bridge and/or bridge rehabilitation. Proposals are due by October 22, 2026, and must include a bid bond for 5 percent of the bid price. The successful contractor will be required to provide performance and payment bonds for 100 percent of the bid price. The project timeline includes a bridge closure from June 15 to September 28, 2027, with substantial completion due by September 28, 2027, and final acceptance by October 12, 2027. The contract is subject to Davis-Bacon wage determinations, Build America Buy America compliance, and the outcome of a public hearing scheduled for December 2026.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS