Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Hampshire was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lebanon 24222 NH Route 120 (Hanover Street) Bridge Rehabilitation

Closed
2026-RFx-058State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Public Works- Roads

POSTED

about 16 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
Beresford Ave Extension Phase 2B: S Kepler Rd/ Dr MLK Beltway to SR 44
Solicitation # 27-B-17JD, C2103
The County of Volusia, Engineering and Construction department, is soliciting bids for the Beresford Avenue Extension Phase 2B project, identified as solicitation number 27-B-17JD, C2103. This infrastructure project involves the new construction of Beresford Avenue, extending the roadway from approximately 1,100 feet east of Kepler Road to the intersection of SR 44 and Summit Avenue, as well as the realignment of 1,600 feet of Summit Avenue. The scope of work includes the creation of two 11-foot travel lanes in each direction with 6-foot paved shoulders, roadside ditches, drainage structures, and a 12-foot concrete trail on the south side. All pavement markings must be thermoplastic and adhere to FDOT standard plans. The estimated construction cost for this project is 4,911,975.00 dollars. The contract will be awarded to the single lowest responsive and responsible respondent based on criteria including business location, financial resources, technical experience, and past performance. Bids are due by December 1, 2026, and must be accompanied by a bid bond of at least five percent of the bid amount. The project is subject to liquidated damages of 2,529.00 dollars per day for failure to meet delivery dates. Payment terms are set at thirty days from the receipt of undisputed invoices, with funding limited to the budget approved by the Volusia County Council. The contractor is responsible for all quality control sampling and must comply with ADA and civil rights regulations.
Engineering & Construction

POSTED

about 17 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving, culvert replacement, drainage improvements, and signage. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in a stone trench, and 2,800 feet of modified concrete curb and gutter. The project is entirely funded by the City of Zeeland with an engineer's estimate of 1,111,000 dollars, and all work must be completed by April 30, 2027. Encrypted bids must be submitted via the Bid Express site by 11 a.m. local time on Thursday, November 12, 2026. Only bidders prequalified by the City of Zeeland will have their bids opened. Proposals must be based on unit prices and must be accompanied by a proposal guarantee of five percent of the bid amount. Award evaluation is primarily based on the total bid price and the competency of the bidder. Successful contractors are required to provide performance and lien bonds each totaling 100 percent of the contract value, as well as certifications for Workmen's Compensation Insurance and manufacturer certifications for sewer pipes. Project direction is managed by Scott A. Smith, P.E. of ZEEZON LLC, with inspection services provided by Moore & Bruggink, Inc.
Moore & Bruggink, Inc

POSTED

about 18 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The City of Lebanon is soliciting proposals for the rehabilitation of the NH Route 120 (Hanover Street) bridge over NHRR, identified as NHDOT Project No. 24222. The scope of work involves replacing the existing 15-inch deep prestressed deck beam superstructure with 12-inch deep prestressed deck beams of varying lengths, while maintaining the existing tunnel substructure. Additional requirements include refacing both abutments, performing concrete repairs to the substructure, retaining walls, and sidewalks, and replacing existing approach slabs with 20-foot precast slabs. Roadway approach work is limited to approximately 50 feet on each side. The engineer's estimate for the project is between 2.3 million and 2.5 million dollars. Bidders must be NHDOT prequalified in bridge or bridge rehabilitation and submit their proposals by October 22, 2026. The contract will be awarded to the responsible bidder with the lowest responsive bid, with the City reserving the right to include bid alternatives based on a specific budget. The project timeline includes a bridge closure from June 15 to September 28, 2027, with substantial completion due by September 28, 2027, and final acceptance by October 12, 2027. Award and authorization are contingent upon funding, approvals, and the outcome of a public hearing scheduled for December 2026. Compliance requirements include adherence to Build America, Buy America (BABA) standards for all permanently incorporated iron, steel, and construction materials, as well as Davis-Bacon wage determinations and ADA compliance for pedestrian detours. The successful bidder must provide a bid bond of 5 percent of the bid price, and subsequently, performance and payment bonds for 100 percent of the bid price. All work must be performed in accordance with the final construction plans and technical specifications provided by the City of Lebanon.

General Info

City of Lebanon bridge rehabilitation project, estimated 2.3-2.5 million, due October 22, 2026.

Documents

5
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this first21 pages · rfp
High
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Hampshire → Public Works - Engineering
Contacts1 person available
OfficeLebanon, NH, 03766, USA
Office AddressLebanon, NH, 03766, USA
Contacts
Brian VincentCity Engineer

Interested Companies (30)

CCS Constructors
Cold River BridgesWalpole, NH
ConstructConnectCincinnati, OH

See All 30 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The project consists of replacing the existing superstructure with 12" deep deck beams of varying lengths. The existing substructure that forms the tunnel is to remain in place. The project also consists of concrete repairs to the substructure and the sidewalk. Roadway approach work will be limited to approximately 50' on each approach. Additional work will also include the replacement of existing approach slabs. PLEASE NOTE: The City of Lebanon reserves the right to reject any and all Bids and to waive any irregularity in Bidding. The successful Bidder will be required to furnish all necessary Bonds and Insurance Certificates. The City will award this project at its sole discretion and may or may not include any or all bid alternatives. All work included in this Bid is contingent upon bid amounts, available funding, and any required approvals. A Public Hearing related to this project is scheduled for December 2026; therefore, final award and authorization to proceed may be subject to the outcome of the Public Hearing and subsequent City approval.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS