Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Rhode Island was posted on March 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bridge Group 15F - Barrington Bridge

Closed
TCB26006407State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 9 hours ago

DEADLINE

in 8 days

General Info

Place of Performance

RI, USA

Set-Aside

NONE

Documents

9

2025-CB-033 Addendum 1 - Barrington Bridge No. 012301

PDF, High priority: read this firstamendment
High

2025-CB-033 Rehabilitation of Bridge Group 15F

PDF, High priority: read this firstspecifications
High

2025-CB-033 Rehabilitation of Bridge Group 15F Barrington Bridge

PDF, High priority: read this firstspecifications
High

2025-CB-033 RIDOT Required Federal Forms

PDF, High priority: read this firstsupporting-documents
High

Contract 2025-CB-033 - Barrington Bridge Plan Set

PDF, High priority: read this firstspecifications
High

General Decision RI20260001 - Rhode Island Wage Rates

PDF, High priority: read this firstwage-determination
High

RIDOT Standard Specifications for Road & Bridge Construction (August 2025)

PDF, High priority: read this firstspecifications
High

TCB26006407 / 2025-CB-033 Addendum No. 1

PDF, High priority: read this firstamendment
High

TCB26006407 - Bridge Group 15F - Barrington Bridge Change Details Report

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of Rhode Island
Contacts1 person available
OfficeRI, USA
Organization / AgencyState of Rhode Island
Office AddressRI, USA
Contacts
M. Scott StephensPrimary Contact

Full Description

Show more
Bridge No. 012301 was found to have void deficiencies at the footings of Piers 1-4, similar deficiencies were observed in Piers 5 & 6 and were addressed through a Maintenance Certification (2019-09-078). The proposed rehabilitation work for the bridge includes the replacement of the deck expansion joints, minor concrete patching repairs of the substructure and concrete arch panels, restoring the contact area at selected bearings, underwater repairs to the tremie seals of the bridge piers, and the installation of scour countermeasures. The most extensive aspect of this project will be repairing the existing tremies and installing the scour countermeasures.

More opportunities from State of Rhode Island

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS