Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Rhode Island was posted on March 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bridge Group 76 - I-Way Preservation

Closed
TCB25004781State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes from qualified asphalt paving contractors for the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This request is specifically for bidding purposes to help the prime contractor prepare their project bid. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt-related tasks necessary for project completion. Interested parties must submit their proposals by November 27, 2026. Submissions should include company contact information, itemized pricing for the asphalt work, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all contractors are encouraged to apply, there is a strong emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included.
D.R. Phillips, LLC

POSTED

about 7 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Rhode Island Contract No. 2025-CB-020, Federal-Aid Project No. BHO-BG76(001), involves the maintenance and preservation of eight I-Way bridges located in the City of Providence. The scope of work includes bridge deck expansion joint gland replacement, concrete crack and masonry repairs, interior and exterior girder repainting, approach slab settlement mitigation via injection grouting, rip-rap repair, and miscellaneous fence repairs. The project also requires comprehensive maintenance and protection of traffic, with technical design and engineering specifications detailed across multiple plan volumes for I-95 and I-195 structures. The contract establishes a substantial completion date of June 15, 2027, and a final acceptance date of November 12, 2027, with liquidated damages set at 2,350 dollars per calendar day for delays. Bidders must adhere to strict federal and state compliance standards, including Buy America (BABA) requirements, Davis-Bacon wage rates, and Disadvantaged Business Enterprise (DBE) participation goals. Contractors are required to self-perform at least 30 percent of the total contract price. Mandatory submissions include federal anti-collusion and debarment certifications, as well as DBE utilization plans, which must be submitted via the Ocean State Procures portal or email within three business days of the bid opening to avoid being deemed nonresponsive.

General Info

Maintenance and preservation of eight Providence I-Way bridges, completing by June 15, 2027.

Place of Performance

RI, USA

Set-Aside

NONE

Documents

12
PDF, High priority: read this firstsupporting-documents
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsupporting-documents
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
X-ZIP-COMPRESSED

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of Rhode Island
Contacts1 person available
OfficeRI, USA

Full Description

Show more
Rhode Island Contract No. 2025-CB-020, Federal-Aid Project No. BHO-BG76(001), PTS ID No. 2604U includes the maintenance and preservation of eight (8) bridges, known as the I-Way Bridges in the City of Providence in Providence County, Rhode Island. The proposed maintenance and preservation work under this contract shall consist of but not be limited to: bridge deck expansion joint gland replacement, isolated concrete crack repairs and concrete masonry repairs, isolated bridge girder re-painting interior and exterior, approach slab settlement mitigation by injection grouting, isolated rip-rap repair, and miscellaneous repairs such as replacement of missing snow fence post caps, chain link fence repairs such as re-attaching existing chain link mesh to existing fence posts and mending unwoven chain link mesh sections, as listed in the contract documents, as well as the maintenance and protection of traffic.

More opportunities from State of Rhode Island

Same awarding agency

NAICS: 236220
New
SLED
URI Washburn Hall Renovations Upper College Road Multi-Use Development Enabling
Solicitation # RFQ27007140
The University of Rhode Island is seeking a qualified general contractor for the Washburn Hall Renovations Upper College Road Multi-Use Development Enabling project located at 75 Briar Lane in Kingston, Rhode Island. The scope of work involves comprehensive structural stabilization and reinforcement from the basement through the third floor, including new foundations, concrete footings, and supplemental framing. Additionally, the project requires architectural renovations of second and third floor office and conference rooms, interior finishes, and modifications to HVAC, electrical, telecommunications, and fire protection systems, such as the installation of a new energy recovery ventilator and updated panelboards. The contract period is scheduled to run from approximately January 2027 through July 31, 2028, with liquidated damages of 10,000 dollars per day for delays affecting the academic schedule. Bidders must include total lump-sum allowances of 370,000 dollars in their base bid, covering foundation wall waterproofing, basement interior refinishing, and security and data installation. The project is governed by URI-revised AIA A101-2017 and A201-2007 contracts and requires adherence to Rhode Island prevailing wage rates, ADA standards, and specific bonding and insurance requirements. BL Companies serves as the design agent for the project.
Commercial and Institutional Building Construction

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS