Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bridge No. 755800, L.B. McLeod Road bridge over Shingle Creek Steel Beam Rehabilitation and Recoating - Phase 2 and Phase 3

Closed
Y25-703State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, identified as IFB No. 8003R1, for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and utility construction. The scope of work includes site preparation and earthwork such as land surveying, site clearing, and subsurface investigation; utility and pipeline installation involving tunneling, boring, jacking, and cathodic protection; surface improvements including asphalt paving and landscaping; and various support services like traffic control and storm water pollution prevention. The solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, WBE, and OBE certifications. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Additionally, subcontractors and material contractors are required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The bid deadline is November 18, 2025, and invitations to bid are managed through the Building Connected system. Primary coordination is handled by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
International
0661 Boars Head Footbridge Superstructure Renewal Works Contract 2026
Solicitation # DN827563
Wigan Council is seeking a tier 1 Network Rail contractor for the superstructure renewal of the Boars Head Footbridge, a three-span steel structure located over the West Coast Mainline railway in Wigan. The project scope involves the removal of the existing steel footbridge and supports, refurbishment of foundations and banking seats, and the installation of a new steel footbridge and supporting trestles. Additional works include installing an ACO type drain at the west end, regrading approaches, and replacing disturbed kerbs. The estimated contract value is 975,000 GBP excluding VAT, with a projected performance period from April 5, 2027, to June 13, 2027. Award criteria are weighted 60 percent on price and 40 percent on quality and social value, with quality assessments focusing on experience, resource availability, and works management. Bidders must be accredited Network Rail Tier 1 contractors with RISQS registration and must provide full risk and method statements before commencement. The project will be governed by CDM 2015 regulations. Mandatory insurance requirements include 10 million GBP for both Employer's and Public Liability, 2 million GBP for Professional Indemnity, and Contract Works insurance for the full value of the project. Submissions must be completed by November 27, 2026, and include certifications against the Common Assessment Standard and declarations regarding the Modern Slavery Act 2015 and Artificial Intelligence.
Wigan Council

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

1 day ago

DEADLINE

N/A

AI Contract Overview

Show more

Orange County, Florida, is seeking sealed bids for the rehabilitation and recoating of Steel Beam Bridge No. 755800, located on L.B. McLeod Road over Shingle Creek, in phases 2 and 3. The project has an estimated cost of approximately $1,001,950 and requires bidders to submit responses exclusively through the OpenGov e-Procurement Platform by 4:00 pm EST on August 27, 2024. All responses must be submitted electronically; hand-delivered, mailed, faxed, or emailed offers will not be accepted. Bidders are responsible for ensuring timely submission, with technical support available via OpenGov’s Service Desk. Questions regarding the solicitation must be submitted through the OpenGov question and answer module by August 12, 2024, and no oral interpretations will be binding. Any modifications or clarifications will be issued as written addenda, which will be available for download and considered part of the contract documents. The primary point of contact for the solicitation is Gerson Vazquez Gonzalez, reachable by email or phone. The project is managed by the Orange County Procurement Division, and additional details can be accessed through the provided online portal link.

Documents

4
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Orange County Administrative Service, Procurement Division
Contacts1 person available
OfficeN/A

Full Description

Show more
NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed bids for Bridge No. 755800, L.B. McLeod Road bridge over Shingle Creek Steel Beam Rehabilitation and Recoating - Phase 2 and Phase 3 (Y25-703)Sealed offers for furnishing the above will be accepted up to 4:00 pm EST on Tuesday, August 27, 2024.The Estimated Cost for this project is $1,001,950.00NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers.Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected.Important Instructions for Electronic SubmittalThe County is ONLY accepting electronic bid submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login Once you have completed account registration, browse back to this page, click on Submit Response, and follow the instructions to submit the electronic bid.It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties.OpenGov Technical SupportFor Technical Support, respondent's can reach the OpenGov Service Desk:Chat (preferred): Click the button in the lower right hand corner of the portal Email: contact@example.gov: +1 (555) 000-0000 Hours: Mon-Fri 7am - 10pm ESTTimely Questions Regarding this SolicitationThe question and answer module of OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, August 12, 2024 at 4:00 pm EST. Respondents are instructed not to contact the initiating division directly.Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division.Answers for timely questions will be addressed in the OpenGov question and answer module or as an addenda to this solicitation depending on volume, participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein.This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from.Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email contact@example.gov. Critical clarifications may be made via addenda, however, untimely questions may not be considered.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS