Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Bridge Preventative Maintenance Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Riverside Transportation Department is implementing a Bridge Preventative Maintenance Program (Work Order# ZC40066C, Task Code# Z1530) to perform maintenance improvements at 19 bridge locations throughout Riverside County. These locations span various cities, including Riverside, Corona, San Jacinto, Palm Desert, Beaumont, Perris, and Murrieta, as well as unincorporated communities such as Thermal, Oasis, and Desert Center. The scope of work is driven by Caltrans Bridge Inspection Reports and includes activities such as backfilling erosion, applying concrete overlays or methacrylate seals, supplementing timber elements, replacing railings and expansion joint seals, epoxy-injecting cracks, and repairing bridge approaches or concrete spalls. No additional right of way or temporary construction easements are required for this project. The maintenance activities are organized into three distinct categories based on their environmental impact and level of ground disturbance. Category A involves four bridges requiring ground disturbance, such as excavation or concrete piling in channel beds. Category B includes six bridges where work is performed without ground disturbance in the channel, utilizing small, portable equipment placed outside sensitive areas. Category C covers nine bridges where all work is conducted entirely on the bridge deck or paved road approaches with no ground disturbance. Environmentally, the project is exempt from the California Environmental Quality Act under Section 15301(c) because it involves maintenance of existing facilities without expanding use or adding traffic lanes. The project must also comply with the Coachella Valley and Western Riverside County Multiple Species Habitat Conservation Plans.

General Info

Riverside County will perform preventative maintenance on 19 bridges across various local sites.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Bridge Preventative Maintenance Program Notice of Exemption and Authorization

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jan BulinskiEnvironmental Project Manager

Full Description

Show more
The County of Riverside Transportation Department is proposing to implement maintenance improvements at 19 bridge locations within the County. The proposed project includes 19 bridge locations that are within or adjacent to the cities of Riverside, Corona, San Jacinto, Palm Desert, Beaumont, Perris, and Murrieta and within portions of unincorporated Riverside County including the communities of Thermal, Oasis, and Desert Center. The proposed bridge preventative maintenance work is based on the structural ratings and work recommendation identified in the Caltrans Bridge Inspection Reports (BIRs), and findings and reconciliation of qualified work from various field reviews. The proposed bridge preventative maintenance work, in general, consists of one or a combination of the following activities at each bridge: • Backfill erosion on abutment embankment slopes and wingwalls. • Apply a polyester concrete overlay and/or methacrylate seal on the bridge deck to treat concrete cracks. • Supplement deteriorated timber elements including girders and columns. • Replace deteriorated timber railings. • Replace expansion joint seals. • Epoxy-inject cracks on abutment walls, pier walls, and concrete slopes. • Repair cracked bridge approaches. • Repair concrete spalls on bridge elements. The bridge preventative maintenance work is divided into three categories as follows: • Category A: Preventative maintenance work that involves some level of ground disturbance. The work in this category includes backfill, excavation, and cast-in-drilled-hole (CIDH) concrete piling by using construction equipment in the channel bed or below the bridge. Four bridges are in this category. • Category B: Preventative maintenance work that requires no equipment or ground disturbance in the channel or below the bridge. The work will include walking under the bridge and the use of small, portable pumps or equipment that will be placed entirely outside of any areas that are identified as sensitive, such as drainages. No driving or other types of ground-disturbing activities would occur. Six bridges are in this category. • Category C: Preventative maintenance work that will be done entirely on the bridge deck or paved road approaches. No ground disturbance would occur. Nine bridges are in this category. No additional right of way or temporary construction easements will be required to implement the proposed maintenance improvements.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS