This Solicitation opportunity from Vermont was posted on July 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Bridge Repairs - Town Bridge #67
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Town of Northfield, Vermont, is seeking bids from qualified contractors to perform repairs on Town Highway Bridge #67 located on Highway 93. The project involves replacing the existing bridge beams with three W 27 x 160 beams, installing a temporary pedestrian walk bridge, reusing the existing 6 x 6 deck timber, and constructing an 8 x 8 curb from 2 x 8 planks along with a safety guide rail. Contractors are required to submit a detailed proposal that includes a letter of interest, a project schedule with a completion deadline of November 30, 2024, and a comprehensive cost estimate covering all materials and work. The deadline for proposal submissions is August 12, 2024, at 1 PM, and questions about the project can be directed to the Town Manager, Jeff Schulz. All contractors and subcontractors must carry insurance coverage of at least $1 million per occurrence, including general liability, products/completed operations, fire/legal/liability, and automotive liability, along with a performance bond. The project budget is estimated to be between $200,000 and $500,000. The town reserves the right to reject any or all bids. Interested parties can submit proposals either by mail or email and should refer to the provided contact details for further information. The project aims to ensure the structural integrity and safety of the bridge while maintaining pedestrian access during repairs.
General Info
Agency
NAICS
Place of Performance
VT, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
