This Solicitation opportunity from California was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Bridge replacement and roadway widening.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to bridge replacement and roadway widening along State Route 299 in Shasta County, California, specifically from 0.4 mile west of Whiskey Creek Road to 0.1 mile east of Lake Vista Overlook. It is a fixed-price solicitation issued by the California Department of Transportation under solicitation number 02-2K0004, with a response deadline of July 23, 2026. The work involves comprehensive construction activities including earthwork, grading, subgrade preparation, paving, trench excavation, and installation of structural components such as 10-inch welded steel pipe casing, minor concrete curb and sidewalk, stamped concrete surfaces, and asphalt pavements. The project requires the use of advanced construction technologies including GNSS and automated machine guidance systems for precision earthwork and paving operations, with strict compliance to Caltrans Standard Specifications, AWS D1.1 and D1.5 for welding, and environmental regulations such as EPA 3050B, EPA 6010B, and EPA 1311 for soil and water sampling. Special provisions mandate the presence of a full-time Safety Quality Control Manager with OSHA 510 or Cal/OSHA 30-hour certification plus CSP or CHST credentials, who must be on-site at all times and submit a Site-Specific Safety Program prior to work commencement. Daily and weekly safety inspections, along with hazard-specific checklists, are required, and all safety reports must be submitted promptly. Contractors must coordinate lane closures and traffic control with Caltrans and adjacent projects, comply with Buy America provisions for iron and steel products, and provide Environmental Product Declarations for asphalt and concrete. All work must commence within 55 days of AG approval, and submittals for key personnel, safety plans, and technical documentation must be received at least 15 days before mobilization. Invoices are processed through Caltrans’ internal prompt payment monitoring system, and samples for environmental testing are analyzed by certified labs in Cerritos, CA, and Las Vegas, NV. The contract includes no option periods, no security clearance requirements, and no organizational conflict of interest clauses, with pricing details for line items such as asphalt, concrete, and lump sums not disclosed in the available documentation.
General Info
Agency
NAICS
Place of Performance
Shasta, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
