This Solicitation opportunity from Department Of Agriculture was posted on July 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bridgeport Float Valve Replacement

Closed
1240LT24Q0064Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project focuses on constructing improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key technical requirements include civil and site work such as grading, demolition, saw cutting, and trucking, as well as the installation of concrete structures, concrete pipes, fittings, and welding. Additional specialized services required for the project include electrical work, traffic control, construction surveys, and SWPPP implementation. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation process, specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support the project. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Sparks, NV, 89431, USA

Set-Aside

SBA

Documents

6

Bridgeport Float Valve Replacement - General Specifications

PDF, High priority: read this firstspecifications
High

Schedule of Items - Bridgeport Float Valve Replacement

PDF, High priority: read this firstbid-schedule
High

Solicitation 1240LT24Q0064 Amendment 0001 - Bridgeport Float Valve Replacement

PDF, High priority: read this firstamendment
High

Solicitation 1240LT24Q0064 - Bridgeport Float Valve Replacement

PDF, High priority: read this firstrfp
High

Wage Determination CA20240020 - Mono, Inyo, and Kern Counties

PDF, High priority: read this firstwage-determination
High

USDA Forest Service Past Performance/Experience Questionnaire

DOC, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA
Contacts
Tony Taylor - Contract Specialist

Full Description

Show more
Amendment 0001: This amendment serves to add the following information to Section C.3 SITE INFORMATION AND LIMITATIONS, located on page ten of the solicitation. This new paragraph will follow paragraph 5 and will be labeled as 6.: C.3 A. 6. The access road is a high clearance road accessible by ATV or UTV. The road is often saturated from the overflow from the water tank. All ruts caused or exacerbated by vehicular access shall be repaired and drainage shall be directed off the road. Hand shoveling ruts and creating waterbars would be acceptable. All other information, terms and conditions remain the same. The offer due date and time will remain the same. --------------------------------------------------------------------------------------------------------------------- SCOPE OF CONTRACT This project includes replacement of two existing float valves in the water storage tank for the Bridgeport Forest Service compound. This also includes calibration and the electrical work needed to operate the well successfully on a summer system and winter system. Disinfecting the tank will also be included in this project. The existing water tank is a 10,000 gallon stainless steel tank with 2 manholes. There are 2 float valves in a single valve box between the manholes. One valve controls a higher water level during the summer when more people live at the compound. And the other controls a lower water level in winter so the lower use does not result in stagnant water in the tank. The existing float valves have become disconnected and/ or twisted. A new radio communication system was installed in 2023 relaying water level signals to the well controls mounted on a house at the compound. Currently, the float valves do not operate correctly, and the well must be manually turned on and off to fill the water tank. It has been verified that the new radio controls do send a signal to the well but the signal from the floats to the radio controls is not there. This project is to install two float controls (summer/ winter) one in the manhole without the ladder and one in the existing valve box penetration. This layout could be changed with a proposal that would eliminate the chance the two floats would become tangled. The new float valves need to be wired so that they communicate with the new radio controls and successfully control the operation of the well. The old float valves will be removed and the entry into the water tank shall remain water and airtight. The design of this installation would be proposed by the contractor and approved by the CO. The water tank shall be cleaned, scrubbed, and disinfected after work is completed.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Other Heavy and Civil Engineering Construction

POSTED

about 23 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238990
New
Federal
Big Springs Horse Corral Replacement
Solicitation # 1240LT26Q0179
Solicitation 1240LT26Q0179 is a total small business set-aside for the Big Springs Horse Corral Replacement project located in the Westside Ranger District of the Caribou-Targhee National Forest in Caribou County, Idaho. The project requires the supply and installation of a 20 by 60 foot four-rail divided steel oil pipe corral with concrete post embedment. The contractor is responsible for all mobilization, clearing and grubbing, and the implementation of temporary traffic control measures, including closing local traffic and posting public notices for the duration of the work. There are two optional award items: the construction of one additional 20 by 60 foot corral and the installation of a hitching rail. The contract is a firm fixed price agreement with an estimated performance period from June 1, 2027, through July 31, 2027, allowing for 61 calendar days for completion. Award will be made to the lowest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance, evaluated via an experience questionnaire focusing on general construction and concrete work. Payment bonds are required for contracts exceeding 35,000 dollars. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave and minimum wage standards. Bids must be submitted to the USDA Forest Service by October 29, 2026.
All Other Specialty Trade Contractors

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 562910
New
Federal
Bunkhouse Asbestos Mitigation
Solicitation # 1240LT27Q0010
Solicitation 1240LT27Q0010 is a total small business set-aside for the removal and replacement of approximately 2,900 square feet of asbestos-containing building materials at three facility locations within the Rio Grande National Forest in Colorado. The scope of work includes the abatement of asbestos from ceilings, walls, windows, and flooring, followed by the installation of new materials such as drywall and wood flooring, and finishing the interior walls and ceilings with paint. Performance is scheduled to occur between October 30 and December 30, 2026. The project is estimated to have a value between 100,000 and 250,000 dollars. Award will be based on the best value to the government, with cost and price serving as the most important evaluation factor. Other critical requirements include the submission of a technical narrative and a record of past performance within the last three years. Contractors must provide 100 percent payment and performance bonds, as well as a bid bond equal to 20 percent of the total offer price. Additionally, the contractor is required to hire an independent third party for air clearance testing before renovation begins and must adhere to all applicable asbestos laws, OSHA regulations, and Davis-Bacon Act wage requirements. Quotations must be submitted via the specified Excel pricing format by the deadline of October 28, 2026.
Remediation Services

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS