Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Bridgeport Warehouse Snow Damage Repair and Mitigation

Awarded
1240LT26C0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract, awarded under solicitation number 1240LT26Q0020 and amended via A0001 effective February 11, 2026, is a Firm Fixed Price agreement competitively solicited as a Total Small Business Set-Aside under FAR 19.5, restricted to small businesses as defined by the NAICS code 236220. The work involves the replacement of an existing propane-fired boiler and associated upgrades at the Buffalo Creek Work Center located at 18046 CO RD 126, Pine, CO 80470, with all activities required to be completed by April 30, 2026. The scope encompasses the supply and installation of a high-efficiency Dunkirk Quantum 90 Q90-200 equivalent boiler, replacement of the backflow preventer, waterline upgrades, electrical panel replacement, mold remediation, and reconstruction of the boiler room interior. An optional line item exists for thermostat replacement. The project is classified as a construction activity within the $25,000 to $100,000 range, with performance expected between April 1 and May 20, 2026, and delivery terms set at F.O.B. Destination, requiring Government inspection and acceptance on-site. Compliance with the International Mechanical, Building, and Plumbing Codes, the National Electric Code, OSHA construction standards, and manufacturer specifications is mandatory. All work must adhere to applicable federal wage determinations under Davis-Bacon and Executive Order 14026, with certified payroll reporting required. Contractors must possess a current Unique Entity ID in SAM.gov and comply with Buy American requirements for construction materials, paid sick leave provisions under Executive Order 13706, and equal opportunity obligations for veterans and workers with disabilities. Performance bonds and payment protections are required post-award, with electronic funds transfer through SAM.gov governing all payments. The evaluation process prioritizes past performance and technical approach over price, following a best-value trade-off methodology rather than lowest price technically acceptable. The contractor must submit a detailed construction schedule within ten days of notice to proceed, obtain pre-approval for all materials including the boiler, comply with wildfire restrictions during operations, and maintain access for government representatives throughout the performance period. All waste must be removed, and site restoration completed. The award is managed by the USDA Forest Service’s CSA Intermountain 8 office in Ogden, UT

General Info

Small business contract to replace boiler and upgrade systems at Buffalo Creek Work Center, due April 30, 2026.

Contract Value

$541,000

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CA, USA

Set-Aside

SBA

Award Issued Date

Documents

9

Amendment A0001 to Solicitation 1240LT26Q0020

PDF, High priority: read this first2 pages · amendment
High

Attachment 7 Q and A for Mitigation Work

PDF, High priority: read this first1 page · q-and-a
High

BCWC Dwelling Mechanical and Electrical System Information

PDF, High priority: read this first3 pages · specifications
High

Dunkirk Q90-200 Series II Gas Fired Condensing Hot Water Boiler Product Specifications and Installation Manual

PDF, High priority: read this first50 pages · specifications
High

FY26 Buffalo Creek Work Center Boiler Replacement and Electrical Upgrades SOW

PDF, High priority: read this first18 pages · sow
High

FY26 Buffalo Creek Work Center Boiler Replacement Schedule of Items

PDF, High priority: read this first1 page · schedule-of-items
High

Solicitation 1240LT26Q0020 for Propane Gas-Fired Boiler Replacement

DOCX, High priority: read this first15 pages · rfq
High

Wage Determination C020260004 for Residential Construction in Colorado

PDF, High priority: read this first7 pages · wage-determination
High

Buffalo Creek Work Center Boiler Replacement Pre-bid Sign-In Sheet

PDF, Low prioritypre-bid-sign-in
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA
Contacts
Tony Taylor - Contract Specialist

Full Description

Show more

Award is a Firm Fixed Price contract competitively solicited.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Request for Proposal for a single firm fixed price contract to perform comprehensive interior renovations of Building 262, and potentially Buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes modernizing interior finishes by replacing corridor and classroom flooring with composite modular materials and LVP, renovating restrooms with new vanities and lavatories, and updating electrical systems with dimming controls and new ceiling fans. Additionally, the project requires the installation of raised flooring, replacement of variable air volume HVAC systems, and the correction of plumbing deficiencies. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, where price, past performance, and corporate relevant experience are weighted with equal importance. Offerors must provide performance and payment bonds totaling 100 percent of the contract price and adhere to Davis-Bacon prevailing wage determinations for the Georgia region. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must be organized into specific tabs including the SF 1442, a detailed bid schedule in Excel, and financial information. Technical requirements mandate compliance with ADA accessibility guidelines and strict adherence to material storage and labeling standards for wood and electrical components.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project includes electrical distribution and lighting upgrades, building automation controls, hazardous materials abatement, and site improvements such as paving, drainage, and utility repairs. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Award will be based on the lowest price. Bidders must adhere to strict quality control standards using a three-phase control system and comply with the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Administrative requirements include monthly invoicing via Wide Area Work Flow and the submission of detailed performance reports and certifications. All work must comply with ADA accessibility guidelines and specific technical standards for piping, lighting, and cybersecurity for facility control systems.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 25, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is designated as Riverside or Los Angeles. A critical component of this contract is strict adherence to six Disadvantaged Business Enterprise Good Faith Efforts (GFE) required to secure project financing. These efforts include outreach and recruitment, specific publicity requirements involving a 30-day online posting and a one-day print newspaper advertisement, subcontracting considerations for large firms, encouraging DBE grouping, and the utilization of the Small Business Administration and Minority Business Development Agency. Bidders must submit proof of compliance for GFE #2 and GFE #5 within their bid package; failure to do so, or failure to complete these efforts before the bid opening date, will result in the proposal being deemed non-responsive. Documentation for outreach efforts may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted dormitory rooms, offices, and medical areas across three floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, and rubber wall base installation, as well as necessary plumbing and electrical work to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, a 90-day bid guarantee, and compliance with the Davis-Bacon Act, OSHA, EPA, and NFPA-101 life safety codes. Contractors must also provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured and adhere to specific federal minimum wage and paid sick leave mandates.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. The project duration is 1828 calendar days and encompasses extensive sitework, including clearing, rock excavation, grading, and wetland mitigation. Infrastructure improvements involve the installation of access roads, paved loading areas, landscaping, and a full electrical utility network featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories and is managed by J & J Contractors, Inc. Interested parties must contact the primary point of contact to receive bid invitations and access necessary documentation before the response deadline.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Oil and Gas Pipeline and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
Federal
Administrative Parking Lot Repairs
Solicitation # 1240LT27Q0019
Solicitation 1240LT27Q0019 is a firm fixed price request for quotation issued by the USDA Forest Service for the repair and resurfacing of three administrative parking lots located at the Boulder Ranger District Office, Clear Creek Ranger District Office, and the Fort Collins Administrative Site within the Arapaho and Roosevelt National Forest and Pawnee National Grassland. The scope of work includes cleaning surfaces, asphalt crack and joint sealing, infrared pavement patching, seal coating, and re-striping. All work must adhere to the Forest Service Supplementary Specifications and Federal Highways Standard Specifications FP-24. The project magnitude is estimated between $25,000 and $100,000, with a performance window from June 15, 2027, to August 15, 2027, requiring completion within one week at each site. This procurement is a 100% Total Small Business Set-Aside under NAICS code 237310. Award will be based on best value, evaluating both price and a technical approach that includes a 1 to 3 page execution narrative and a construction schedule. Quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 23, 2026, at 14:00 EST. Required submission documents include the SF-1442, a technical approach narrative, and pricing provided specifically in the provided Excel Schedule of Items. Key compliance requirements include the Buy American-Construction Materials clause and electronic payment via the System for Award Management.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS