This project involves the design and construction of ADA and PennDOT compliant curb ramps along with accompanying sidewalks, curbing, and sign relocation or installation at designated locations within Bristol Borough, Pennsylvania, funded through the Community Development Block Grant program. All work must adhere to PennDOT Publication 408 and local Borough Standards, ensuring uniformity and regulatory compliance. The solicitation includes one base bid and four alternate bids, allowing for flexible scope execution based on funding availability or prioritization. The place of performance is clearly defined as Bucks County, with administrative oversight centered at 250 Pond Street, Bristol, PA 19007. Contractors are required to submit comprehensive preconstruction documentation including lists of subcontractors and materials, progress schedules, and meeting minutes, and must coordinate closely with the Owner’s Engineer and Resident Project Representative throughout all phases.
Performance and Payment Bonds, each equal to 100% of the contract value, are mandatory and must be executed by an approved surety company. The contractor assumes full responsibility for site coordination, including scheduling, field survey control, quality assurance, and cleanup prior to substantial completion and owner occupancy. Although no formal evaluation factors, pricing line items, or contract value are disclosed, the structure implies award will be based on compliance and lowest bid, with contract administration handled through formal change orders and closeout procedures. Inspections and acceptance occur on-site under the authority of the Owner, with no electronic invoicing systems or military packaging standards referenced—only PennDOT and Borough requirements govern construction quality and delivery. No specific period of performance, FOB terms, or key personnel commitments are stipulated, but consistent presence of the Contractor’s Superintendent and adherence to coordination protocols are implied. All submissions must comply with the broader administrative framework of the Bristol Borough procurement process, though detailed financial, technical, or regulatory clauses beyond coordination and bonding are not fully outlined in the available documentation.
General Info
Design and build ADA/PennDOT-compliant curb ramps and sidewalks in Bristol, PA, with 100% bonds and strict coordination requirements.
HighAI Summary for 2025 CDBG Curb Ramp Program Preliminary Bid Tab 08-05-2025: This document is the preliminary bid tabulation for the 2025 CDBG Curb Ramp Program for Bristol Borough, project number 25-00014, dated August 5, 2025. It lists multiple bidders with their unit prices and total bid amounts for various curb ramp design/build locations. The tabulation includes base bids and alternate bids with quantities and pricing details. The document identifies the apparent low bidder and summarizes the total estimated project award amounts based on the bids received.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for 2026-00117 Bristol Borough 2026 CDBG Design/Build Curb Ramp Project Bidder's Acknowledgement Form: This document is the Bidder's Acknowledgement Form for the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project, contract number 2026-00117. It includes the bidder's agreement to enter into a contract with the owner, acknowledgements of terms and conditions, representations about site conditions and compliance with laws, certification against fraudulent and collusive practices, basis of bid including unit prices and estimated quantities, time of completion commitments, and a list of attachments required with the bid. The form also specifies communication protocols and defines terms used in the bid. The document is essential for submitting a compliant bid and confirms the bidder's understanding and acceptance of the bidding documents and project requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 BB CDBG Curb Ramp Program Concept Plans: This document provides concept plans and technical specifications for the 2026 Community Development Block Grant (CDBG) Curb Ramp Program. It outlines the design standards and implementation requirements for curb ramp installations to ensure accessibility compliance.
PDF
PDF, High priority: read this firstproject-manual
HighAI Summary for 2026 BB CDBG Curb Ramp Program Concept Plans Project Manual: Project manual for Contract No. 2026-00117, Bristol Borough 2026 CDBG Design/Build Curb Ramp Project. Prepared for Bristol Borough, PA, dated June 2026. Document prepared by Gilmore & Associates, Inc., covering engineering, land surveying, planning, and GIS consulting services related to the curb ramp program concept plans.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for 2026 Road Program - Bidder Acknowledgement Form (2025-00089): A Bidder's Acknowledgement Form for the 2026 Road Program (Contract 2025-00089). The document outlines the bidder's agreement to the contract terms, certifications of non-collusion, site visit acknowledgments, and a list of required attachments including bid security and surety agreements.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 2026 Road Program - Bidder's Acknowledgement Form (2025-00089): A Bidder's Acknowledgement Form for the 2026 Road Program (Contract 2025-00089). The document outlines the bidder's agreement to the terms and conditions, representations regarding site visits and document review, certifications against collusive practices, and a list of required bid attachments including bid security and non-collusion affidavits.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 25-00089 – 2026 Bristol Borough Road Paving Project - List of Drawings: A drawing index for the 2026 Bristol Borough Road Paving Project (Project 25-00089), listing a single sheet: Location Map.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 26-00117 Bristol Borough CDBG Design/Build Curb Ramp Project - List of Drawings: A list of drawing sheets for the Bristol Borough CDBG Design/Build Curb Ramp Project (26-00117), including a location map and CDBG curb ramp concept plans (sheets 2-13).
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Addendum #1 - Appendix A - Davis Bacon Wage Rates for PA Heavy and Highway Construction: This document is Addendum #1 dated 2025, providing Davis-Bacon wage rates for heavy and highway construction projects in Pennsylvania counties including Bucks, Chester, Delaware, Montgomery, and Philadelphia. It supersedes General Decision Number PA20240004 and includes wage rates and fringe benefits for various construction trades such as Boilermaker, Carpenter, Electrician, and others. The document outlines applicability of Executive Orders 14026 and 13658 regarding minimum wage rates effective in 2025. It also details geographic coverage and specific county boundaries relevant to the wage determinations. Multiple modification dates are listed, with the latest on 07/25/2025. The document serves as a critical reference for contractors to ensure compliance with federal wage requirements on covered contracts.
PDF
PDF, High priority: read this firstcontractor-responsibility-certification
HighAI Summary for Addendum #1 Contractor Responsibility Certification Bristol Borough 2025 CDBG Project: This document is Addendum #1, titled Contractor Responsibility Certification, for the Bristol Borough 2025 CDBG Design/Build Curb Ramp Project, contract #2025-00014. It requires the contractor to certify no debarments, defaults, license revocations, or convictions related to contracting in recent years. It also confirms the contractor's technical qualifications and resources, including participation in a Class A Apprenticeship Program. The certification includes provisions for disclosure of related business entities and subcontractor information. The Borough may require additional information or electronic submission. The document must be signed by an authorized representative of the firm.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 for Bristol Borough 2025 CDBG Design/Build Curb Ramp Project: This document is Bid Addendum #1 dated July 25, 2025, for the Bristol Borough 2025 CDBG Design/Build Curb Ramp Project Contract 2025-00014. It includes the upload of Contractor Responsibility Certification to be included in the Responsible Contractor's Ordinance portion of the bid submission and updated Davis Bacon Wage Rates dated July 25, 2025, for use in bid preparation. Bidders must acknowledge receipt of this addendum by signing and including the form in their bid package submitted via the PennBid website.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 for Bristol Senior Center Roof Replacement Contract 2026-00385: This document is Addendum #1 for the Bristol Senior Center Roof Replacement project under Contract 2026-00385. It includes a detailed table of contents covering procurement and contracting requirements, specifications, site and infrastructure details, and thermal and moisture protection divisions. Key sections include instructions to bidders, bid forms, bonds, agreements, general and supplementary conditions, prevailing wage rates, and various construction specifications. The addendum serves to update or clarify the original solicitation documents for this roofing project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 - Sec 01 22 00 - Measurement and Payment - Exhibit A: Addendum #1 for the Bristol Borough 2026 Road Paving Program (Contract 25-00089), dated May 27, 2026. This document provides Exhibit A, which contains the road list and approximate quantities, including specific measurements (Area SY, Average Width, and Actual Length) for various roads such as Diguiseppe Drive and Pine Alley.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 - Sec 01 22 00 - Measurement and Payment - Exhibit B: Addendum #1 for the 2026 Road Paving Program (Contract 25-00089) for Bristol Borough, dated May 27, 2026. The document provides a road list and approximate quantity list for base bid items, including thermoplastic markings and stop legends.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Addendum #1 - Section 01 22 00 Measurement and Payment: This document is an addendum containing technical specifications for Section 01 22 00, 'Measurement and Payment'. It defines the measurement and payment criteria for unit price items including roadway milling, base repair, Superpave leveling course, manhole rim adjustments, and Superpave wearing course, referencing PennDOT Publication 408 standards.
PDF
PDF, High priority: read this firstagreement-of-surety
HighAI Summary for Addendum 2 - Agreement of Surety Company for Contract 2026-00385: This document, titled Agreement of Surety Company, is part of Addendum 2 for Contract 2026-00385 concerning the Bristol Borough Senior Center Roof Replacement. It outlines the surety company's legal commitment to provide performance and payment bonds amounting to 100% of the contract value, ensuring faithful performance and fulfillment of the contract. The agreement is valid if the contract is awarded within 60 days of bid opening. It includes provisions for the surety's obligations and consequences if the surety fails to execute the required bonds after award notification. The document requires signatures and authority certification for execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 - Bidder Acknowledgement Form for Bristol Borough Senior Center Roof Replacement: This document is Addendum 2, titled Bidder Acknowledgement Form, related to the Bristol Borough Senior Center Roof Replacement project (drawing number 26-00385). It includes a list of drawing sheets, specifically sheet 1 titled Roof Outline. The addendum serves as an official amendment to the original solicitation or contract documents, providing updated or additional information for bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 - Contract Considerations Bid Form: This document is Addendum 2 related to Section 01 29 00 - Contract Considerations. It includes the Bid Form identified as Document 00 41 00. The addendum likely modifies or supplements the original solicitation documents, providing updated instructions or requirements for bidders. The document is critical for bidders to understand changes in contract considerations and to submit compliant bids.
PDF
PDF, High priority: read this firstsupplementary-conditions
HighAI Summary for Addendum 2 - Doc 00 73 00 - Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCDC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement times, outlines the schedule of values, and specifies requirements for contract documents, subsurface conditions, and hazardous environmental conditions. It also includes provisions for the Pennsylvania Prevailing Wage Act and Public Works Employment Verification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 - Instructions to Bidders: This document is Addendum 2 containing Instructions to Bidders for a construction project. It includes detailed articles on defined terms, copies of bidding documents, qualifications of bidders, examination of bidding documents and site conditions, and other bidding procedures. The document provides guidance on bid preparation, submission, evaluation, and contract award processes. It also addresses site access, hazardous conditions, and coordination with other work at the site. The addendum serves to clarify and supplement the original bidding documents to ensure bidders understand requirements and conditions for submitting bids.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 - Section 01 22 00 Measurement & Payment: This document is Addendum 2, Section 01 22 00, detailing the measurement and payment criteria for Contract 26-00385. It specifies lump sum payment terms for roof replacement (TPO), an add/deduct alternate for an EPDM roofing system, and identifies incidental items such as mobilization, disposal, and audio-videotaping that are included in the contract price.
PDF
PDF, High priority: read this firstbidder-qualification-statement
HighAI Summary for Addendum 2 X-01 Roof Outline Bidder Qualification Statement: This document is Addendum 2 for the X-01 Roof Outline project and contains a Bidder Qualification Statement. It includes sections for organizational structure, subcontractor work portions, work history on similar projects, default history, construction experience of key personnel, references including bonding and banking information, a financial statement requirement, and a certification affidavit. The document is intended to assess the qualifications and reliability of bidders for the contract.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Addendum 2 X-02 Wall Detail: Technical drawing detail for wall construction, specifically outlining EPDM cover strips, metal drip edges, adhered EPDM, and metal coping for a shingle wall detail.
PDF
PDF, High priority: read this firstagreement-of-surety-company
HighAI Summary for Agreement of Surety Company for Contract 2026-00117 Bristol Borough CDBG Project: This document is the Agreement of Surety Company related to Contract 2026-00117 for the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project. It binds the Surety Company to execute and deliver Performance and Payment Bonds each in an amount of 100% of the contract amount in favor of the Owner. The agreement is valid if the contract is awarded within 60 days after bid opening. It also outlines the Surety Company's obligations if it refuses to execute the required bonds after award notification, including payment of any cost difference to the Owner. The document requires signature and seal of the Surety Company and notes authority requirements for signatories.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix A - Davis Bacon Federal Wage Determination: This document is Appendix A, which contains the Davis Bacon Federal Wage Determination for the procurement.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix A - Davis Bacon Wage Rates (PA20260004): General Decision Number PA20260004 (dated 01/30/2026) specifying Davis-Bacon prevailing wage rates and fringes for Heavy and Highway construction projects in Bucks, Chester, Delaware, Montgomery, and Philadelphia Counties, Pennsylvania.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix A - Prevailing Minimum Wage Determination: This document is Appendix A, which provides the prevailing minimum wage determination for the procurement.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix A - Prevailing Minimum Wage Determination: This document is Appendix A, which specifies the prevailing minimum wage determinations for the procurement.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix B - Public Works Employment Verification Form: A Public Works Employment Verification Form used to certify compliance with labor and wage requirements for public works projects.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix B: Public Works Employment Verification Form: A Public Works Employment Verification Form (Appendix B) used to ensure compliance with labor and wage requirements for public works projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix C Part 1 - Contract Language Requirements: This document outlines mandatory contract language and regulatory requirements for federal procurements, specifically referencing HUD and EPA standards. It covers critical clauses including breach of contract remedies, termination for cause/convenience, Clean Air and Water Acts, ADA, ABA, and various civil rights and employment laws (DBE, MBE/WBE, FLSA, and IRCA). It specifies monetary thresholds for the application of certain clauses, such as the $150,000 threshold for breach of contract and environmental compliance.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond Document for Bristol Borough Project: This Bid Bond document for the Bristol Borough project outlines the legal obligations of the Bidder and Surety to the Owner. It specifies the penal sum payable upon Bidder default, conditions nullifying the bond, and procedures for notice and payment. The document includes execution requirements, default definitions, and legal jurisdiction. It ensures compliance with applicable statutes and requires a Power of Attorney for the Surety's representative. The bond protects the Owner by guaranteeing payment if the Bidder fails to execute the contract and bonds as required.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond Document for Bristol Borough Project: This Bid Bond document for the Bristol Borough project outlines the legal obligations of the Bidder and Surety to the Owner. It specifies the penal sum payable upon default, conditions nullifying the bond, and procedures for notice and payment. The document includes execution requirements, default definitions, and legal jurisdiction. It ensures compliance with applicable statutes and requires a Power of Attorney for the Surety's representative. The bond protects the Owner by guaranteeing payment if the Bidder fails to fulfill contract execution requirements within specified timelines.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Bidder Qualification Statement - 2026 Road Paving Program (Contract 2025-00089): A mandatory bidder qualification form for Contract No: 2025-00089 (2026 Road Paving Program). The document requires bidders to provide organizational background, work history for similar projects over the last five years, financial statements, references, and a notarized affidavit of certification.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Bidder Qualification Statement - Bristol Borough 2026 CDBG Design/Build Curb Ramp Project: A mandatory bidder qualification form for Contract No: 2026-00117 (Bristol Borough 2026 CDBG Design/Build Curb Ramp Project). The document requires bidders to provide organizational background, work history of completed and in-progress projects, references, financial statements, and a notarized affidavit to verify the bidder's qualifications.
PDF
PDF, High priority: read this firstbidder-qualification
HighAI Summary for Bidder Qualification Statement - Contract 2025-00089 (2026 Road Paving Program): A mandatory Bidder Qualification Statement for Contract No: 2025-00089 (2026 Road Paving Program). The document requires bidders to provide organizational background, work history for similar projects over the last five years, financial statements, references, and a notarized affidavit to certify the accuracy of the submission.
PDF
PDF, High priority: read this firstbidder-qualification-statement
HighAI Summary for Bidder Qualification Statement for Contract 2026-00117 Bristol Borough CDBG Project: This Bidder Qualification Statement is part of the bid submission for Contract No. 2026-00117, Bristol Borough 2026 CDBG Design/Build Curb Ramp Project. It requires bidders to provide organizational background, work history, references, and financial statements. The document includes sections for bidder identification, experience, subcontractor work, past project details, default history, and certification with an affidavit. Submission of this fully completed and executed statement is mandatory and may be grounds for bid rejection if omitted.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Bristol Borough 2026 CDBG Design/Build Curb Ramp Project: This document is the procurement and contracting requirements for the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project, contract number 2026-00117. It includes a comprehensive table of contents covering procurement requirements such as bid forms, instructions to bidders, bid bonds, and bidder qualifications. Contracting requirements include agreements, performance bonds, payment bonds, maintenance bonds, insurance certificates, and general conditions. The specifications group details general requirements, site and infrastructure, concrete work, specialties, earthwork, and exterior improvements including ADA detectable warning surfaces. Appendices include Davis Bacon wage rates and federal labor provisions. This document serves as a primary solicitation for the curb ramp construction project, outlining all necessary procurement and contracting details.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Bristol Borough 2026 CDBG Design/Build Curb Ramp Project Agreement: This is a formal agreement between Bristol Borough and a Contractor for Contract 2026-00117, involving the design and construction of ADA-compliant curb ramps and sidewalks. The document specifies a substantial completion timeline of 90 days, liquidated damages of $500 per day for delays, and payment terms including a 10% to 5% retainage structure. It also notes compliance with CDBG 2 CFR Part 200 and Davis-Bacon wage reporting via SkillSmart.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Bristol Borough 2026 CDBG Design/Build Curb Ramp Project - Bidder Acknowledgement Form: Bidder Acknowledgement Form for the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project (Contract 2026-00117). The document outlines the bidder's agreement to the contract terms, representations regarding site visits and document review, certifications against collusive practices, and requirements for bid submission and attachments.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bristol Borough 2026 CDBG Design/Build Curb Ramp Project - Project Manual: Project manual title sheet for Contract No. 2026-00117, regarding the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project. Prepared by Gilmore & Associates, Inc. in June 2026.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bristol Borough 2026 CDBG Design/Build Curb Ramp Project - Table of Contents: Table of Contents for Contract 2026-00117, the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project. The document outlines the procurement and contracting requirements, including bid forms, bonds, general conditions, and detailed technical specifications for concrete, earthwork, and exterior improvements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bristol Borough 2026 CDBG Intersection List - ADA Curb Ramps: A technical list of intersections for the Bristol Borough 2026 Accessibility Improvements project. The document specifies 8 primary intersections and 4 alternate locations for ADA curb ramp installations, totaling up to 34 ramps.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Bristol Borough 2026 Road Paving Project - Advertisement for Bids: An invitation for sealed bids for Contract #25-00089, the Bristol Borough 2026 Road Paving Project. The project includes milling, base repair, leveling, and wearing courses. Bids are due by 11:00 A.M. on September 29, 2026. Submission is via PennBid, and requires a 10% bid bond. The project is subject to the Pennsylvania Prevailing Wage Act.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bristol Borough 2026 Road Program - Bid Addendum #1: Bid Addendum #1 dated September 16, 2026, for Contract 2025-00089 (Bristol Borough 2026 Road Program). The document updates Section 01 22 00 regarding Measurement & Payment to include a remobilization allowance for Spring 2027 and identifies Alternates #1 and #2 in Exhibits A and B and the Bid Table. Bidders must sign and upload this addendum with their bid package via PennBid.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Bristol Borough 2026 Road Program - Prevailing Wage Rates: Prevailing wage rate determination issued by the Pennsylvania Department of Labor & Industry for the Bristol Borough 2026 Road Program (Project 26-08073). The document specifies hourly rates and fringe benefits for various trade classifications across Building and Heavy/Highway categories, with a determination date of 9/3/2026.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Bristol Borough 2026 Road Program - Prevailing Wages: Prevailing wage project rates issued by the Pennsylvania Department of Labor & Industry for the Bristol Borough 2026 Road Program (Serial Number 26-08073). The document specifies hourly rates and fringe benefits for various labor classifications across Building and Heavy/Highway project types, with a determination date of 9/3/2026.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Bristol Borough Roadwork Agreement: This is a formal agreement between Bristol Borough (Owner) and a Contractor for roadwork involving milling, base repair, leveling, and wearing courses. The document specifies a substantial completion timeline of 45 calendar days, final completion within 60 days, and defines liquidated damages of $1,000 per day for general delays and $500 per day for work zone noncompliance. It outlines payment procedures, including a 90-95% progress payment structure and retainage requirements.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Bristol Borough Roadwork Agreement: This is a formal agreement between Bristol Borough (Owner) and a Contractor for roadwork involving milling, base repair, leveling, and wearing courses. The document specifies a 45-day substantial completion timeline, a 60-day final completion timeline, and establishes liquidated damages of $1,000 per day for general delays and $500 per day for work zone non-compliance. It outlines unit price payment structures, retainage terms (10% to 5% based on progress), and payment processing requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bristol Borough Senior Center Roof Replacement - Addendum #1: Bid Addendum #1 dated April 27, 2026, for the Bristol Borough Senior Center Roof Replacement (Contract 2026-00385). It updates the Bid Table per Section 01 22 00 and announces a non-mandatory Pre-Bid Conference on May 1st at 11am. Bidders must sign and submit this addendum with their bid package via PennBid.
Ref. #: Bristol Borough, Bucks County This project involves one base bid and two alternate bids for the design and construction of ADA/PennDOT compliant curb ramps, with all necessary sidewalks, curbing, and sign relocation/installation at specified locations within Bristol Borough. The design and all material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Borough Standards.
More opportunities from Pennsylvania → Bucks County