Broadway Burlingame Grade Separation Project - No Station Alternative

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Peninsula Corridor Joint Powers Board

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Broadway and California Avenue, Burlingame, CA

Set-Aside

NONE

Documents

(1)

BBGS Noe 2025-0821 Broadway Burlingame Grade Separation Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Peninsula Corridor Joint Powers Board
Contacts1 person available
OfficeN/A
Organization / Agency
California → Peninsula Corridor Joint Powers Board
Office AddressN/A
Contacts
Bonny O'ConnorManager, Capital Projects and Environmental Planning

Full Description

Show more
The Broadway Grade Separation Project is proposed by the Peninsula Corridor Joint Powers Board (Caltrain) in cooperation with the City of Burlingame, San Mateo County. The project is located approximately 1.5 miles of the Caltrain corridor in Burlingame, between Oxford Road and Oak Grove Avenue. The Broadway at-grade crossing is designated as the highest priority for elimination statewide based on the California Public Utilities Commission (CPUC) safety-based prioritization methodology. The purpose of and need for the proposed project is to: (1) improve public safety by eliminating the existing at-grade railroad crossing at Broadway; and (2) modernize the Broadway station, including eliminating the hold-out rule and improving pedestrian/bicycle access to and within the station area. The project involves elevating the railroad and depressing roadways to provide the minimum clearance necessary for Broadway traffic under the railroad. This will involve reconstructing the railroad tracks on an elevated retaining wall structure and depressing Broadway, California Drive, and Carolan Avenue in the vicinity of the grade separation. The Broadway station will be reconstructed with an elevated central boarding platform, stairs, and Americans with Disability Act-compliant ramp access improvements. The JPB Caltrain service currently crosses Broadway at-grade in the City of Burlingame. The existing train service at the Broadway station only occurs on weekends, with 16 stops running in each direction for a total of 32 daily stops each day, Saturday and Sunday. JPB is evaluating the environmental review needs in accordance with the California Environmental Quality Act (CEQA) for a grade separation project at the Broadway intersection and Broadway station location. One alternative of the project would evaluate the railroad grade separation that eliminates an existing grade crossing and includes the closure and removal of the existing Broadway station from service (BBGS No Station Alternative). The BBSG No Station Alternative would remove the physical elements of the Broadway Station such as the platforms, accessory sheltered benches, and an at grade parking lot as well as the change of land use.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS