Broadway Channel Urgent Repairs

Forecast
forecast_18697d64-9e66-4317-98a9-fb12a4bd4e65State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego County Water Resource Management team initiated urgent repairs at the Broadway Channel to address destabilized side slopes and prevent ongoing erosion. Summit Erosion Control was tasked with implementing temporary erosion control measures using gravel-filled burlap bags and jute erosion control blankets. The gravel bags were strategically stacked to fill voids along the channel banks and then fully covered with jute matting to provide immediate stabilization and sediment control. These materials were specifically chosen for their temporary and removable properties, ensuring the solution could be easily taken out once long-term repairs or natural recuperation are feasible. The intervention was framed as an emergency response to mitigate further degradation of the channel’s structural integrity. All work was conducted under a forecasted task order with no formal solicitation number, posted on May 29, 2026, and targeted exclusively at the Broadway Channel location in San Diego, California. The primary point of contact for the project is Sara Agahi, Water Resource Manager, who can be reached via phone or email for inquiries related to the undertaking. Although no NAICS code or set-aside information was provided, the effort reflects a focused, short-term operational response to environmental instability, prioritizing rapid deployment and minimal permanent impact to the site. The project remains under the oversight of San Diego County’s water resource division with no indication of additional contracting phases or funding beyond the immediate stabilization efforts.

General Info

Urgent erosion control at Broadway Channel using gravel bags and jute blankets for temporary stabilization.

Agency

California → San Diego County

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego County
Office AddressN/A
Contacts
Sara AgahiWater Resource Manager

Full Description

Show more
The urgent work performed at Broadway Channel was to stabilize the side slopes and protect them against further erosion issues. Flood control initiated a task order with Summit Erosion Control to install erosion control Best Management Practices (BMP) at the eroding site. Gravel filled burlap bags and erosion control jute blankets were placed. The gravel bags were placed in a stacking fashion to fill in the voids along the bank/side slopes of the channel and then covered / wrapped with an erosion control jute matting/blanket. The gravel bags and jute blankets are not permanent fill and were selected because of their removable and temporary nature.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 8 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS