Water Treatment Plant Access Road/Asphalt Maintenance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Coast Water Authority is seeking to perform asphalt maintenance on the access road of the Polonio Pass Water Treatment Plant located at 5250 Antelope Road, Shandon, California. The project is necessary to address pavement surface wearing, oxidation, and cracking caused by environmental exposure and traffic loading, which allows water penetration and accelerates road degradation. The scope of work specifically involves crack sealing and slurry sealing to extend the service life of the pavement and postpone the need for full reconstruction. The project is classified under NAICS code 237990 and has been granted exempt status under the California Environmental Quality Act, specifically citing CEQA Guidelines Sections 15061(b)(3), 15301, and 15302. Peter Thompson, the Executive Director of the Central Coast Water Authority, serves as the primary point of contact for this effort. No specific contract value, performance period, or detailed pricing schedules have been provided in the available documentation.

General Info

Central Coast Water Authority seeks asphalt maintenance for Polonio Pass plant access road.

Agency

California → Central Coast Water Authority

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

5250 Antelope Road, Shandon, CA 93461., CA, 93461

Set-Aside

NONE

Documents

(1)

Water Treatment Plant Access Road/Asphalt Maintenance CEQA Exemption Notice

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Coast Water Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Central Coast Water Authority
Office AddressN/A
Contacts
Peter ThompsonExecutive Director

Full Description

Show more
The Central Coast Water Authority (CCWA) is a joint powers agency formed to construct, own, and operate certain facilities needed to treat, convey, and deliver State Water Project (SWP) water to its project participants retail water providers and end users located within the County. The Polonio Pass Water Treatment Plant (WTP) is one of CCWA's facilities and stores treatment chemicals in chemical tanks. The pavement of the WTP access road is constantly exposed to the elements and traffic loading. This results in a wearing of the pavement surface and the oxidation of the pavement materials. Cracks will form, which will allow water to penetrate beneath the pavement and this creates an accelerated degradation process. Through crack sealing and slurry sealing, the service life of the pavement will be greatly extended, which postpones full reconstruction. CCWA intends to repair the WTP access road.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS