Vichy Playground Replacement, Parking Lot and ADA Bathroom Modernization Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Napa Valley Unified School District is forecasting a project to replace the existing playground structure at the Vichy location with a new one, alongside modifications to the adjacent parking lot and the ADA-compliant bathroom facility. The work involves the complete removal of the current playground equipment and the installation of a new, modernized playground system designed to meet current safety and accessibility standards. In addition, the project includes alterations to the existing parking log to improve functionality and traffic flow, as well as upgrades to the bathroom to ensure full compliance with the Americans with Disabilities Act. These improvements aim to enhance the safety, usability, and accessibility of the facility for students, staff, and the broader community. The procurement is being managed by the Napa Valley Unified School District, with Angela Ramich serving as the VPCS Project Coordinator and Rob Mangewala as the Assistant Superintendent of Business and Operational Services, responsible for overseeing the contract process. The project was posted on May 28, 2026, and the performance location is in Napa, California. Although the solicitation number, NAICS code, and set-aside details are not yet provided, the district is seeking qualified contractors to complete all aspects of the project, including demolition, construction, and compliance-driven modifications. All inquiries should be directed to the contact information provided, with emphasis on coordination between design, construction, and regulatory standards.
General Info
Agency
NAICS
Place of Performance
Napa, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
