Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pier A Zero Emissions Infrastructure Project – Harbor Development Permit No. 26-004

Forecast
HDP 26-004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pier A Zero Emissions Infrastructure Project, under Harbor Development Permit No. 26-004, involves comprehensive electrical upgrades and the construction of specialized cargo-handling lots at the SSA Marine Terminal in the Port of Long Beach, California. The project focuses on supporting zero-emission electric equipment, including utility tractor rigs, top handlers, forklifts, and rubber-tired gantry cranes. The scope includes the installation of 166 electric vehicle charging stations, consisting of 56 Level 2, 104 Level 3, and 6 light-duty forklift chargers. To support this, the project will implement primary and secondary unit substations, a new electrical distribution system, and approximately 20,000 linear feet of utility trenching for electrical, water, and storm drain improvements. The infrastructure is divided into four primary areas: the Top Handler Lot, the Utility Tractor Rig Southern Lot, the North Cargo-Handling Equipment Lot, and the On-Terminal Lot, along with dedicated lanes for electric rubber-tired gantry cranes. Additional site work includes the addition of 60,000 square yards of pavement, the installation of security fencing, ADA-compliant gates, and the relocation of a longshore labor parking lot to a new 255-space facility that meets California Green Building Code requirements. The project also incorporates stormwater management through new drainage inlets and best management practices. Construction is expected to take approximately 28 months and will be performed at 700 Pier A Plaza, Long Beach.

General Info

Electrical upgrades and zero-emission charging infrastructure for the SSA Marine Terminal, Long Beach.

Agency

California → Long Beach, Port of

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Mark EricksonDirector of Program Management

Full Description

Show more
The Pier A Zero Emissions Infrastructure Project involves electrical improvements and the construction of cargo-handling lots with electric vehicle charging stations at the SSA Marine Terminal at Pier A in the Port of Long Beach, with a total of 166 electric vehicle charging stations and foundations consisting of 56 Level 2 single- and dual- dispenser electric vehicle chargers, 104 Level 3 dual-dispenser electric vehicle chargers, and 6 light-duty forklift chargers to support the deployment of human-operated, zero-emission electric cargo-handling utility tractor rigs, top handlers, forklifts, electric rubber-tired gantry (eRTG) cranes, and on-terminal vehicles used in cargo operations, administrative functions, security and maintenance activities. To accommodate the new cargo-handling equipment lots, an existing longshore labor parking lot at the marine terminal will also be relocated adjacent to the its current location. The project involves the establishment of lots for the electric charging cargo-handling equipment and on-terminal vehicles: (1) Top Handler Lot, (2) Utility Tractor Rig (UTR) Southern Lot, (3) North Cargo-Handling Equipment (CHE) Lot; and (4) On-Terminal Lot. In addition, lanes for the operation of eRTGs will be created on the marine terminal. Electrical improvements at the project site include installation of primary and secondary unit substations, a new electrical distribution system with medium and low voltage equipment dedicated to the new zero-emission cargo-handling equipment and on-terminal vehicles, new duct banks, new load interrupter switches, utility access holes, and pull boxes. At the project site, approximately 20,000 linear feet of soil will be trenched and backfilled to accommodate electrical, water, and storm drain utility improvements and a total of approximately 60,000 square yards of pavement will be added to the project site. Construction of the project is expected to take approximately 28 months. The Top Handler Lot will accommodate 34 top handlers, with a one-charger per top handler configuration. A 600-linear-feet, 8-feet tall security chain-link fence will be installed to separate the terminal from the labor parking lot. Five pedestrian security turnstiles will provide controlled worker access between the two areas; three turnstiles will be installed near the south end of the Top Handler Lot, between the Top Handler and UTR lots; two additional turnstiles will be installed at the north end of the lot. An Americans with Disability (ADA)-compliant pedestrian swing gate will also be installed. A 3-feet wide walkway will be installed around each top handler, extending from the base of the operator’s access stairs to the main pedestrian pathway; striping will delineate the walkways. One fire hydrant will be installed in the Top Handler Lot in accordance with City of Long Beach Fire Code. The UTR Southern Lot will support up to 106 UTRs and three heavy-duty forklifts. The electric charging stations in the UTR Southern Lot will be configured with dual cables to serve, two adjacent UTR stalls and heavy-duty forklifts. The stationary charging system for the UTR Southern Lot will be powered from six sets of secondary unit substations. A continuous 3-feet wide walkway will be striped around each UTR and heavy-duty forklift. New ingress and egress points will be installed at the north and south ends of the parking lot, all drive aisles will be configured to support two-way traffic into the UTR Southern Lot. Each UTR parking space will include wheel stops and bollards, and reinforced concrete traffic barriers (K-Rail) to define drive aisles throughout the lot to protect the charging equipment and adjacent pedestrian walkways, electrical equipment. A 625-linear-feet long, 8-feet high security chain link fence will be installed at the UTR Southern Lot; a 16-feet wide manual chain link slide gate will be installed near the center of the lot for emergency fire department access between the Labor Parking Lot and the marine terminal. The North CHE Lot will support electric charging in 14 UTR stalls and 10 non-charging UTR stalls, 2 heavy-duty forklift charging stalls, and 3 top handler charging stalls. The charging station in in North CHE Lot will be configures with dual cables and paired with a cable management system to serve two adjacent stalls. The stationary charging system will be powered from a secondary unit substation. A continuous 3-feet wide walkway will be striped around each UTR and heavy-duty forklift to maintain clear pedestrian circulation. Drive aisles will be configured to support two-way traffic and equipment movement. The On-Terminal Lot will accommodate a total of 62 parking spaces for vehicles used in marine terminal operations, including administration, maintenance, crane maintenance, roadability, security, and rail. Electric Vehicle Supply Equipment (EVSE) will support the light-duty and medium-duty on-terminal vehicles. Where feasible, existing electrical service capacity from nearby building will be used to supply the new charging equipment in the On-Terminal Lot. One opportunity charger will in located at the terminal’s maintenance building and one at the administration building. A 3-to-1 vehicle to dispenser ratio is expected for the marine operations, administration, maintenance, and roadability areas; a 2-to-1 ratio is estimated for the security, rail, crane maintenance, and gearman office areas. Bollards and K-Rail will be placed as needed to safeguard equipment, protect pedestrian walkways and define vehicle circulation paths. The new eRTG lanes are anticipated to support up to 14 grid tied eRTGs, with the supporting transformer and switchgears located near the adjacent Top Handler Lot. K-Rail with integrated chain-link fencing will be installed along the eRTG lanes to restrict vehicle and pedestrian movements and protect the cabling that provides power to the eRTGs. A cable protection system will be installed to safeguard medium-voltage cables while allowing equipment to traverse the lanes without damaging conductors. Bollards will be installed to protect electrical distribution equipment. The existing longshore labor parking lot will be relocated westward from and adjacent to its current location at the marine terminal. The new longshore labor parking lot will accommodate 255 parking spaces compared to the 250 parking spaces in the former parking lot. Parking stalls will comply with the City of Long Beach Municipal Code and will also meet applicable California Green Building Code (Title 24, Part 11) (CalGreen) parking lot requirements, including provisions for electric vehicle infrastructure, grading, and sustainable site development. In addition, minor modifications to the existing grades and storm drain systems would be performed, with the installation of new drainage inlets at the sump stations to collect stormwater runoff, routed to stormwater best management practices (BMPs) for treatments and subsequent discharge to the existing storm drain. A gravel area in the north portion of the labor parking lot will also collect surface runoff shore the adjacent North CHE Lot.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details
NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The Carroll Creek Stream Restoration project (CIP# 350007), issued by the City of Frederick, Maryland under solicitation IFB-27-11, is a comprehensive construction effort located near Old Gas House Pike. The scope of work includes in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements involve the use of a Stream Restoration Plan, supplemental specifications, and the installation of reinforced soil lifts, riparian seed mixes, and various culverts. The project has an estimated value of approximately 6.88 million dollars and is expected to be completed within 180 days of the Notice to Proceed. Bidders must comply with strict submission requirements via the OpenGov Portal, including a detailed electronic project schedule and a list of three equivalent projects completed within the last four years. The contract emphasizes socioeconomic goals with participation targets of 31 percent for MBE, 11 percent for WBE, and 2 percent for SDVOSB. Financial security is mandated through a 5 percent bid bond, followed by 100 percent performance and materialmen bonds upon award, and a two-year maintenance bond upon final acceptance. Contract administration includes a two-year guarantee on all work and materials, with liquidated damages set at 500 dollars per calendar day for delays beyond the substantial completion date. The City of Frederick reserves the right to withhold payment if the required progress schedule is not submitted. Evaluation for award is based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capability, integrity, and performance record.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS