Pier A Zero Emissions Infrastructure Project – Harbor Development Permit No. 26-004

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pier A Zero Emissions Infrastructure Project at the Port of Long Beach involves a comprehensive overhaul to transition cargo-handling operations to fully electric, zero-emission systems. The project will install 166 electric vehicle charging stations across four dedicated lots—Top Handler, UTR Southern, North CHE, and On-Terminal—along with six light-duty forklift chargers, supporting electric utility tractor rigs, top handlers, forklifts, eRTG cranes, and other on-terminal vehicles. The electrical infrastructure will be significantly upgraded with primary and secondary unit substations, new medium- and low-voltage distribution systems, duct banks, load interrupter switches, and approximately 20,000 linear feet of trenching for utility lines. Over 60,000 square yards of new pavement will be constructed, and 28 months of construction are expected to complete the full scope. Each charging lot is custom-designed for specific equipment types and operational needs. The Top Handler Lot will serve 34 top handlers with dedicated Level 3 chargers, surrounded by pedestrian walkways, wheel stops, bollards, K-Rail barriers, and a security fence with five pedestrian turnstiles and an ADA-compliant gate. The UTR Southern Lot will accommodate 106 UTRs and three heavy-duty forklifts using dual-cable chargers powered by six secondary substations, featuring two-way traffic lanes, a large emergency gate, and chain-link fencing. The North CHE Lot will support a mix of charging and non-charging UTR stalls and forklifts with paired dual-cable systems and a secondary substation, while the On-Terminal Lot will provide 62 spaces for administrative, maintenance, and security vehicles with a mix of 3-to-1 and 2-to-1 vehicle-to-charger ratios and opportunistic charging at key buildings. New eRTG lanes will support 14 grid-tied cranes, protected by integrated fencing and cable guard systems. Concurrently, the existing longshore labor parking lot will be relocated westward, expanding from 250 to 255 stalls while meeting CalGreen standards, improving stormwater management with new inlets and BMPs, and incorporating runoff collection from the adjacent North CHE Lot.

General Info

Install 166 electric chargers, upgrade electrical systems, build new pavement, and transition Port of Long Beach operations to zero-emission vehicles.

Agency

California → Long Beach, Port of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

(1)

HDP 26-004 Notice of Exemption for Pier A Zero Emissions Infrastructure Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Mark EricksonDirector of Program Management

Full Description

Show more
The Pier A Zero Emissions Infrastructure Project involves electrical improvements and the construction of cargo-handling lots with electric vehicle charging stations at the SSA Marine Terminal at Pier A in the Port of Long Beach, with a total of 166 electric vehicle charging stations and foundations consisting of 56 Level 2 single- and dual- dispenser electric vehicle chargers, 104 Level 3 dual-dispenser electric vehicle chargers, and 6 light-duty forklift chargers to support the deployment of human-operated, zero-emission electric cargo-handling utility tractor rigs, top handlers, forklifts, electric rubber-tired gantry (eRTG) cranes, and on-terminal vehicles used in cargo operations, administrative functions, security and maintenance activities. To accommodate the new cargo-handling equipment lots, an existing longshore labor parking lot at the marine terminal will also be relocated adjacent to the its current location. The project involves the establishment of lots for the electric charging cargo-handling equipment and on-terminal vehicles: (1) Top Handler Lot, (2) Utility Tractor Rig (UTR) Southern Lot, (3) North Cargo-Handling Equipment (CHE) Lot; and (4) On-Terminal Lot. In addition, lanes for the operation of eRTGs will be created on the marine terminal. Electrical improvements at the project site include installation of primary and secondary unit substations, a new electrical distribution system with medium and low voltage equipment dedicated to the new zero-emission cargo-handling equipment and on-terminal vehicles, new duct banks, new load interrupter switches, utility access holes, and pull boxes. At the project site, approximately 20,000 linear feet of soil will be trenched and backfilled to accommodate electrical, water, and storm drain utility improvements and a total of approximately 60,000 square yards of pavement will be added to the project site. Construction of the project is expected to take approximately 28 months. The Top Handler Lot will accommodate 34 top handlers, with a one-charger per top handler configuration. A 600-linear-feet, 8-feet tall security chain-link fence will be installed to separate the terminal from the labor parking lot. Five pedestrian security turnstiles will provide controlled worker access between the two areas; three turnstiles will be installed near the south end of the Top Handler Lot, between the Top Handler and UTR lots; two additional turnstiles will be installed at the north end of the lot. An Americans with Disability (ADA)-compliant pedestrian swing gate will also be installed. A 3-feet wide walkway will be installed around each top handler, extending from the base of the operator’s access stairs to the main pedestrian pathway; striping will delineate the walkways. One fire hydrant will be installed in the Top Handler Lot in accordance with City of Long Beach Fire Code. The UTR Southern Lot will support up to 106 UTRs and three heavy-duty forklifts. The electric charging stations in the UTR Southern Lot will be configured with dual cables to serve, two adjacent UTR stalls and heavy-duty forklifts. The stationary charging system for the UTR Southern Lot will be powered from six sets of secondary unit substations. A continuous 3-feet wide walkway will be striped around each UTR and heavy-duty forklift. New ingress and egress points will be installed at the north and south ends of the parking lot, all drive aisles will be configured to support two-way traffic into the UTR Southern Lot. Each UTR parking space will include wheel stops and bollards, and reinforced concrete traffic barriers (K-Rail) to define drive aisles throughout the lot to protect the charging equipment and adjacent pedestrian walkways, electrical equipment. A 625-linear-feet long, 8-feet high security chain link fence will be installed at the UTR Southern Lot; a 16-feet wide manual chain link slide gate will be installed near the center of the lot for emergency fire department access between the Labor Parking Lot and the marine terminal. The North CHE Lot will support electric charging in 14 UTR stalls and 10 non-charging UTR stalls, 2 heavy-duty forklift charging stalls, and 3 top handler charging stalls. The charging station in in North CHE Lot will be configures with dual cables and paired with a cable management system to serve two adjacent stalls. The stationary charging system will be powered from a secondary unit substation. A continuous 3-feet wide walkway will be striped around each UTR and heavy-duty forklift to maintain clear pedestrian circulation. Drive aisles will be configured to support two-way traffic and equipment movement. The On-Terminal Lot will accommodate a total of 62 parking spaces for vehicles used in marine terminal operations, including administration, maintenance, crane maintenance, roadability, security, and rail. Electric Vehicle Supply Equipment (EVSE) will support the light-duty and medium-duty on-terminal vehicles. Where feasible, existing electrical service capacity from nearby building will be used to supply the new charging equipment in the On-Terminal Lot. One opportunity charger will in located at the terminal’s maintenance building and one at the administration building. A 3-to-1 vehicle to dispenser ratio is expected for the marine operations, administration, maintenance, and roadability areas; a 2-to-1 ratio is estimated for the security, rail, crane maintenance, and gearman office areas. Bollards and K-Rail will be placed as needed to safeguard equipment, protect pedestrian walkways and define vehicle circulation paths. The new eRTG lanes are anticipated to support up to 14 grid tied eRTGs, with the supporting transformer and switchgears located near the adjacent Top Handler Lot. K-Rail with integrated chain-link fencing will be installed along the eRTG lanes to restrict vehicle and pedestrian movements and protect the cabling that provides power to the eRTGs. A cable protection system will be installed to safeguard medium-voltage cables while allowing equipment to traverse the lanes without damaging conductors. Bollards will be installed to protect electrical distribution equipment. The existing longshore labor parking lot will be relocated westward from and adjacent to its current location at the marine terminal. The new longshore labor parking lot will accommodate 255 parking spaces compared to the 250 parking spaces in the former parking lot. Parking stalls will comply with the City of Long Beach Municipal Code and will also meet applicable California Green Building Code (Title 24, Part 11) (CalGreen) parking lot requirements, including provisions for electric vehicle infrastructure, grading, and sustainable site development. In addition, minor modifications to the existing grades and storm drain systems would be performed, with the installation of new drainage inlets at the sump stations to collect stormwater runoff, routed to stormwater best management practices (BMPs) for treatments and subsequent discharge to the existing storm drain. A gravel area in the north portion of the labor parking lot will also collect surface runoff shore the adjacent North CHE Lot.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
AL ROLLINS PARK IMPROVEMENTS RFP
Solicitation # PE-75552-NONST-2026-000000067
The City of Dalton is soliciting proposals for the construction of improvements to Al Rollins Park located at 521 Threadmill Road, including grading of existing baseball fields for artificial turf installation, concrete curbing, storm drainage systems, renovations to the press box and restroom building, soil and erosion control measures, new fencing, and construction of a new PE batting building. The contractor must provide all materials and labor necessary to complete the project in accordance with the Contract Documents and coordinate closely with the City on the scheduling and phasing of work. While the contractor is responsible for site preparation and infrastructure, the artificial turf system—including the turf, infill, stone base, nailers, and field drainage—will be supplied and installed under a separate contract by another party. All interested bidders are required to attend a mandatory Pre-Proposal Meeting on August 25, 2026, at 10:00 A.M. at the project site, with late arrivals not permitted. Proposals must be submitted in sealed envelopes to the City Finance Department at 300 W. Waugh Street by 10:00 A.M. on September 8, 2026. The City reserves the right to request additional information or conduct interviews with proposers and may shortlist firms prior to award. Short-listed contractors will be notified by the close of business on September 9, 2026, and interviews or presentations will take place on September 14 and 15, 2026. Evaluation will consider qualifications, experience, compliance with requirements, and proposed approach to the work. The solicitation number is PE-75552-NONST-2026-000000067, and all information and documentation related to the bid can be accessed via the provided online link. The point of contact for inquiries is Kenneth Harless, reachable at 706-529-5895 or KHARLESS@KRHARCHITECTS.COM.
City of Dalton

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
MRL Carrollton Phase III Storage
Solicitation # W912P8-26-B-A080
The U.S. Army Corps of Engineers New Orleans District is preparing to issue an Invitation for Bids under solicitation number W912P8-26-B-A080 for the construction of a new pre-engineered metal storage building at the Carrollton Phase III facility in New Orleans, Louisiana. This procurement is designated as a Total Small Business Set-Aside under NAICS code 237990 with an estimated value between one and five million dollars. The work encompasses demolition, site clearance, excavation, backfill, utility relocations, construction of a reinforced concrete foundation and pavement, installation of the metal building, chain-link fencing with a gate, and all related incidental tasks necessary to complete a fully functional facility. The contract will be awarded on a Firm-Fixed-Price basis using commercial procedures, and all bids must be submitted in response to the formal solicitation expected to be posted on the System for Award Management website. Interested contractors must maintain an active SAM registration to be eligible for award, as paper copies of the solicitation will not be distributed and all documents, including amendments, will be available exclusively online through SAM. The solicitation is anticipated to be posted on or about the published date, with proposals due by September 21, 2026. Offerors are required to monitor the SAM website regularly for updates and changes. The primary point of contact for questions is Francesca DeBoer of the New Orleans District, with Christopher Nuccio listed as a secondary contact. No technical or contractual inquiries will be accepted or answered prior to the official issuance of the solicitation, and all information contained in this synopsis is subject to change.
W07V Endist New Orleans

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VA
Solicitation # N4008526B0008
This solicitation, designated N4008526B0008, seeks qualified contractors for a Design-Bid-Build dredging project at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia, encompassing the Fuel Pier, Anzio Beach Sandbar, and Utah Beach Sandbar. The work includes dredging sediment using a standard clamshell bucket, transporting material via scow or barge, and depositing it in a near-shore area, as well as constructing Berm Areas #8, #9, and #10 through hydraulic unloading, dewatering, grading, debris and vegetation removal, offsite disposal, and vegetation planting for stabilization. The project is estimated to range between $10 million and $25 million in value and requires contractors to demonstrate experience completing dredging projects with a production rate of at least 2,500 cubic yards per day and handling approximately 200,000 cubic yards of sediment using conventional equipment. Offerors must submit detailed project data for three to five completed, similar projects within the last five years, with all experience limited to their own direct performance; subcontractor experience is not accepted except under specific exceptions. The procurement follows FAR Part 14 sealed bidding procedures and is unrestricted for full and open competition, though if subsequently set aside for small businesses, the contract will include the limitation on subcontracting clause requiring the small business to perform at least 15 percent of the contract cost using its own employees. All respondents must be registered in SAM, provide their UEI and CAGE code, confirm small business status if applicable, and submit bonding capacity information including surety name and maximum per-project and aggregate bonding limits. Proposals must be submitted electronically as a single PDF under 4MB to Angela Clifton at the designated Navy email address by the deadline of September 1, 2026 at 6:00 p.m. Eastern Time, with only registered contractors receiving notifications of amendments.
Navfacsyscom Mid-Atlantic

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237990
New
SLED
Fay Creek Culvert Debris RemovalIn early 2023, a severe storm caused the failure of a 15-foot-diameter culvert beneath Salmon Creek Road, leading to the collapse of the roadway and the deposition of debris—including the damaged culvert, concrete, asphalt, and woody material—into Fay Creek. This obstruction disrupted surface-water flow and blocked critical fish passage. Sonoma County responded by installing a temporary one-lane Bailey bridge to maintain road access, but the debris remains in the creek, impairing aquatic connectivity. To address this, Sonoma County plans to remove approximately 50 feet of the failed culvert and all associated debris from a 50- by 100-foot section of the creek, potentially including an unstable concrete abutment from a prior bridge structure. The removal effort will occur during the dry season using hand tools and heavy equipment staged on Salmon Creek Road, with a temporary access route constructed adjacent to the Bailey bridge to allow an excavator to reach the work zone without entering the wetted channel. No trees will be removed, and minimal vegetation will be cleared only as absolutely necessary for safe operations. The California Department of Fish and Wildlife will coordinate dewatering and fish relocation to protect aquatic life. After debris removal, the site will be graded to match surrounding topography and stabilized with native seed, biodegradable erosion-control fabric, and fiber rolls. All removed materials will be hauled off-site for recycling or proper disposal, and strict erosion and spill prevention controls will be enforced throughout the work to ensure environmental protection and full restoration of natural stream function and aquatic passage.
Sonoma County

POSTED

about 14 hours ago

DEADLINE

N/A
View Details