Christa McAuliffe Early Education Center (EEC) Outdoor Classroom

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Christa McAuliffe Early Education Center Outdoor Classroom project will transform approximately 13,800 square feet of the existing playground into a nature-based outdoor learning environment designed to support whole-child development and enhance early education outcomes. Work includes reconfiguring the playground into distinct activity areas, replacing playground matting, installing site furnishings, planting new trees with mulch, resodding grass areas, upgrading irrigation systems, and applying a 5,700-square-foot solar-reflective coating over existing asphalt to reduce heat absorption. All work adheres to LAUSD District Specifications, standards from the Program Environmental Impact Report, and compliance with ADA, DSA, and DTSC regulations, ensuring accessibility, safety, and environmental protection. The project does not increase student capacity or use intensity and aligns with CEQA Guidelines Sections 15301 and 15304, qualifying for a categorical exemption. Approved budget of $1,641,064 was authorized by the LAUSD Board of Education on November 18, 2025, with performance occurring at 8914 Hunt Avenue in South Gate, California. The outdoor classroom will benefit students and staff at the center while also being available to the broader community per the Civic Center Act. Site inspections and acceptance will be conducted by LAUSD to confirm conformance with all regulatory and district standards, including SC-AQ, SC-CUL, SC-BIO, and SC-USSS conditions. Recycling of construction waste and protection of tree and archaeological resources are required during implementation. No formal contract clauses, pricing line items, evaluation factors, or procurement instructions are documented beyond the project scope and environmental exemption.

General Info

Transform 13,800 sq ft playground into nature-based learning space with $1.6M budget, ADA/DSA compliant, no capacity increase.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Bryan Ramos FernandezCEQA Project Manager

Full Description

Show more
The proposed project (Project) will construct an outdoor classroom covering approximately 13,800 square feet by dividing the existing playground area into distinct activity areas. The scope of work includes replacing playground matting and installing various site furnishings; installing new trees, planting area with mulch, resodding grass area, and irrigation upgrades; and providing approximately 5,700 square feet of new solar reflective coating over existing asphalt (Exhibit A). The Board of Education approved the Project‘s budget of $1,641,064 on November 18, 2025. Minor work will include improvements to ensure compliance with local, state, and federal requirements including those of the American with Disabilities Act (ADA), Division of State Architect (DSA), and Department of Toxic Substances Control (DTSC). The Project will establish nurturing, nature-based outdoor spaces that support whole-child development and learning, as well as address early education facilities needs that are necessary to improve student health, safety, and educational quality. The Project will be implemented per all applicable local and State regulations, as well as all District Standards and Specifications, such as those provided in LA Unifled’s Program Environmental Impact Report for the School Upgrade Program (Program EIR and Subsequent PEIR). The Project will not cause an increase in student capacity or enrollment and would not result in an increase in the intensity of use. The beneficiaries of the Project include students and staff at each of the respective schools and the community at large who may request access to the facilities and grounds of each Campus pursuant to the Civic Center Act (CA Ed. Code Sections 38130 — 38139).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details
NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The Carroll Creek Stream Restoration project (CIP# 350007), issued by the City of Frederick, Maryland under solicitation IFB-27-11, is a comprehensive construction effort located near Old Gas House Pike. The scope of work includes in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements involve the use of a Stream Restoration Plan, supplemental specifications, and the installation of reinforced soil lifts, riparian seed mixes, and various culverts. The project has an estimated value of approximately 6.88 million dollars and is expected to be completed within 180 days of the Notice to Proceed. Bidders must comply with strict submission requirements via the OpenGov Portal, including a detailed electronic project schedule and a list of three equivalent projects completed within the last four years. The contract emphasizes socioeconomic goals with participation targets of 31 percent for MBE, 11 percent for WBE, and 2 percent for SDVOSB. Financial security is mandated through a 5 percent bid bond, followed by 100 percent performance and materialmen bonds upon award, and a two-year maintenance bond upon final acceptance. Contract administration includes a two-year guarantee on all work and materials, with liquidated damages set at 500 dollars per calendar day for delays beyond the substantial completion date. The City of Frederick reserves the right to withhold payment if the required progress schedule is not submitted. Evaluation for award is based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capability, integrity, and performance record.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

More opportunities from California → Los Angeles Unified School District

Same awarding agency

NAICS: 423450
New
SLED
Automated External Defibrillators
Solicitation # 2381068792
The Los Angeles Unified School District is soliciting bids for a comprehensive Automated External Defibrillator (AED) program, including the provision of equipment, real-time monitoring, maintenance, compliance management, and post-event services. The resulting unit rate requirements contract will cover an initial 36-month period. Key technical specifications require a minimum four-year battery and electrode life. The District evaluates bidders primarily on the lowest unit cost on an FOB Destination basis, though bidders may be ruled non-responsible based on poor past performance. The District also reserves the right to inspect bidder facilities and may require a testing period for any newly proposed brands. Deliveries must be made to various District locations within 30 calendar days of a purchase order, with specific delivery windows between 8:00 a.m. and 3:30 p.m. All shipments must be properly packaged to prevent damage and include detailed packing slips. Payment is processed via Electronic Funds Transfer (EFT), and invoices must be submitted in PDF format. The contract emphasizes social responsibility, with a 25 percent participation goal for Small Business Enterprises and a 5 percent goal for Veteran and Disabled Veteran Business Enterprises. Bidders must provide proof of insurance, material safety data sheets, and disclosure of manufacturing plant locations to comply with the District's Sweat-Free Procurement Policy.
Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
SLED
Best Value - 2710066 - Los Angeles High School - Wellness Clinic
Solicitation # 2710066
The Los Angeles Unified School District is soliciting bids for the construction of a new 6,000 square foot Wellness Center at Los Angeles High School, located at 4650 West Olympic Blvd. The project scope includes the creation of a facility for medical, dental, and mental health services, the removal of seven existing relocatable buildings, site improvements such as parking and landscaping, and the restoration of a natural grass play field. The project is divided into four construction phases with a total duration of 730 calendar days, including mobilization and closeout periods. The prime contractor must hold a Class B General Building Contractor license and adhere to the District's Project Stabilization Agreement and prevailing wage requirements. The contract is awarded using a Best Value methodology, where the lowest cost per quality point determines the winner. The procurement process consists of two steps: an initial evaluation of Statements of Qualifications based on a 1,000-point scale—weighting management competency, relevant experience, and past performance most heavily—followed by a price bid submission for shortlisted firms. The District's contract bond estimate is 18,934,000.00, and contractor-caused compensable delays are penalized at 1,500.00 per calendar day. All submissions must be uploaded in PDF format via the Ariba Business Network, adhering to a 50-page limit and a strict Cone of Silence regarding communications with district officials.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS