Building G Roof Eave Barrier Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation of three bus stops near the N and EB buildings at a facility in San Bernardino, California, featuring anti-ligature benches designed for safety and durability. It encompasses demolition work, site grading, and the construction of concrete foundations to support the new infrastructure. Existing ramps will be repaired, and pedestrian safety striping will be applied to enhance accessibility and compliance with safety standards. Shade structures will be erected to provide comfort and protection from the elements, alongside new concrete pads to ensure stable and level surfaces. The scope also includes connecting the path of travel from the bus stops to the building entrances to ensure seamless and safe pedestrian access. All work is intended to improve transportation accessibility and user safety at the site. The contract is forecasted by the California State Hospitals, Department of, with Gonzalo M. Caceres listed as the primary point of contact for construction management.
General Info
Agency
NAICS
Place of Performance
Highland Avenue and Patton Avenue, San Bernardino, CA, 92346Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
