Eastside Transit Corridor Phase 2 Project EA

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eastside Transit Corridor Phase 2 Project proposes an electric-powered light rail extension extending the Metro E Line approximately 4.7 miles east from its current terminus at Atlantic Boulevard to a new at-grade terminal station at Greenwood in Montebello. The project includes reconfiguring 0.4 mile of existing track and constructing 4.3 miles of new guideway, with a mix of alignment types: 3.1 miles underground, 0.9 miles elevated, and 0.7 miles at-grade. The plan involves relocating the existing Atlantic/Pomona station underground and adding three new stations along the route. A Maintenance Storage Facility will be established either in Montebello at Site 1 or 2, or in Commerce at Site 3, with final location to be determined. The project is being managed by the Los Angeles County Metropolitan Transportation Authority with primary coordination handled by Project Manager Jill Liu and Jaime Guzman of AECOM. The environmental assessment was posted for public review in May 2026, indicating the project is in an advanced planning stage with construction anticipated to follow approval.

General Info

Electric light rail extension 4.7 miles east from Atlantic to Greenwood with three new stations and underground, elevated, and at-grade alignment.

Agency

California → Los Angeles County Metropolitan Transportation Authority

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(52)

Appendix M Real Estate and Acquisitions Impacts Report May 2026

PDFenvironmental-impacts-report

10_ESP2_EA_3 Geology, Soils, Seismic and Paleontological Resources Section

PDFenvironmental-assessment-section

14_ESP2_EA_3 Land Use and Development Section

PDFenvironmental-assessment

Eastside Transit Corridor Phase 2 Environmental Assessment

PDFenvironmental-assessment

38_ESP2_EA_AppP_EngineeringDrawingsPart 1_May2026

PDF

FTA Eastside Transit Corridor Phase 2 Environmental Assessment Executive Summary May 2026

PDFenvironmental-assessment

Appendix J Hazardous Materials Impacts Report - Eastside Transit Corridor Phase 2 May 2026

PDFenvironmental-report

09_ESP2_EA_3 Economic Impacts Section

PDFenvironmental-assessment-section

15 ESP2_EA_3 Acquisition and Relocation Section

PDFenvironmental-assessment-section

Notice of Availability for Eastside Transit Corridor Phase 2 Environmental Assessment

PDFnotice-of-availability

19_ESP2_EA_3 Utilities Impact Assessment Section

PDFenvironmental-assessment-section

41_ESP2_EA Appendix S Regulatory Setting Summary May 2026

PDFsow

Eastside Transit Corridor Phase 2 Project Environmental Summary May 2026

PDFenvironmental-summary

37_ESP2_EA_AppO_Transportation_May2026

PDF

38_ESP2_EA_AppP_EngineeringDrawingsPart 2_May2026

PDF

26_ESP2_EA_AppD_Environmental Commitments Record May 2026

PDFenvironmental-commitments-record

FTA Metro East Corridor Phase 2 Environmental Assessment Executive Summary May 2026 Spanish

PDFenvironmental-assessment-summary

36_ESP2_EA_AppN_4(f)_May2026 Section 4(f) Evaluation for Eastside Transit Corridor Phase 2

PDFsection-4f-evaluation

Notice of Availability for East Corridor Phase 2 Environmental Assessment (Spanish)

PDFspecial-notice

Appendix L Noise and Vibration Impacts Report May 2026

PDFenvironmental-assessment-appendix

Appendix R List of Preparers - Eastside Transit Corridor Phase 2

PDFother

08_ESP2_EA_3 Historic, Archaeological and Tribal Resources Section

PDFenvironmental-assessment-section

23_ESP2_EA_AppA_References_May2026

PDFreferences

28_ESP2_EA_AppF_AirQuality_May2026 Air Quality Impacts Report

PDFenvironmental-impact-report

20_ESP2_EA_3 Construction Effects Analysis

PDFenvironmental-assessment

05_ESP2_EA_3 Air Quality Section

PDFenvironmental-assessment

Eastside Transit Corridor Phase 2 Environmental Assessment May 2026

PDFenvironmental-assessment

Appendix H Community Impacts Assessment - Eastside Transit Corridor Phase 2 May 2026

PDFcommunity-impacts-assessment

29_ESP2_EA_AppG_BioResourcesDatabase_May2026

PDFbiological-resources-database

18_ESP2_EA_3 Transportation Section

PDFenvironmental-assessment

13_ESP2_EA_3 Water Resources Environmental Assessment Section

PDFenvironmental-assessment

Eastside Transit Corridor Phase 2 Project - Preliminary Engineering Drawings Part 3 May 2026

PDFengineering-drawings

31_ESP2_EA_AppI_Economic_Impacts_May2026

PDFeconomic-impacts-report

Eastside Transit Corridor Phase 2 Public Outreach Report May 2026

PDFpublic-outreach-report

27_ESP2_EA_AppE_AltsConsidered&PD_May2026 - Eastside Transit Corridor Phase 2 Alternatives and Project Description

PDFenvironmental-assessment-appendix

11_ESP2_EA_3 Visual Resources Environmental Assessment

PDFenvironmental-assessment

16_ESP2_EA_3 Noise and Vibration Environmental Assessment Section

PDFenvironmental-assessment

12_ESP2_EA_3 Hazardous Materials Section

PDFenvironmental-assessment

17_ESP2_EA_3 Safety and Security Assessment

PDFenvironmental-assessment

07_ESP2_EA_3 Community Impacts Section

PDFenvironmental-assessment

22_ESP2_EA_5 Public Involvement and Agency Consultation Summary

PDFenvironmental-assessment-section

Environmental Assessment Chapter 3: Affected Environment and Environmental Consequences

PDFenvironmental-assessment

24_ESP2_EA_AppB_Acronyms and Abbreviations May 2026

PDFother

21_ESP2_EA_4 Section 4(f) Environmental Assessment

PDFenvironmental-assessment

33_ESP2_EA_AppK_Cultural_May2026 Historic, Archaeological and Tribal Resources Technical Report

PDFtechnical-report

42_ESP2_EA_AppT_LandscapeUnitViewpts_May2026

PDFappendix-landscape-viewpoints

Eastside Transit Corridor Phase 2 Environmental Assessment

PDFenvironmental-assessment

Eastside Transit Corridor Phase 2 Tribal Coordination Appendix C May 2026

PDFtribal-coordination

43_ESP2_EA_AppU_BoringLocations_May2026

PDFother

Eastside Transit Corridor Phase 2 Environmental Assessment May 2026

PDFenvironmental-assessment

Eastside Transit Corridor Phase 2 Project Notice of Completion

PDFnotice-of-completion

06_ESP2_EA_3 Biological Resources Environmental Assessment Section

PDFenvironmental-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Metropolitan Transportation Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → Los Angeles County Metropolitan Transportation Authority
Office AddressN/A
Contacts
Jaime GuzmanProject Manager

Interested Companies (1)

Show more
Aecom
Southfield, Michigan

Full Description

Show more
The Build Alternative is an electric-powered light rail transit service extension in eastern Los Angeles County. It would include approximately 4.7 miles of reconfigured and new light rail transit guideway, extending the Metro E Line east from its current terminus at Atlantic Boulevard to an at-grade terminal station at the proposed Greenwood station in the City of Montebello. The 4.7 mile alignment would include the reconfiguration of 0.4 mile of existing track to transition to a new 4.3 mile extension. This alternative would have approximately 3.1 miles of underground alignment, 0.9 miles of aerial alignment, and 0.7 miles of at-grade alignment; a relocated underground Atlantic/Pomona station; and three new stations. The Maintenance Storage Facility (MSF) would either be located in the City of Montebello (MSF Site 1 or 2) or in the City of Commerce (MSF Site 3).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS