Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

LA River Path

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Metropolitan Transportation Authority
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Mitali GuptaProject Manager
Matthew FranckSenior Planner

Interested Companies (1)

Jacobs Engineering GroupSilver Spring, MD

Full Description

Show more
The LA River Path Project is a walking and bicycling path along an approximately 8-mile stretch of the LA?River between Elysian Valley in Los?Angeles and the City of Maywood, through downtown Los Angeles and the City of Vernon. The Project would start at Riverside Drive in Los Angeles, connecting with the LA River Greenway Trail, at the northern end, to Atlantic Boulevard in Maywood, connecting with the existing LA River Trail, which continues to Long Beach. The primary objective of the project is to develop a safe, active transportation corridor along the LA River. This facility, which is physically separated from vehicular traffic, aims to enhance recreational opportunities, support regional and local mobility, and improve quality of life by offering a safe, comfortable, and accessible path for pedestrians and bicyclists of all ages and abilities.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure works. Key scopes of work include underground construction such as tunneling, boring, jacking, and micro tunneling; site preparation including land surveying, site clearing, shoring, and subgrade roadbed work; and environmental and support services including storm water pollution prevention (SWPPP), traffic control, and quality control. Required materials and services also include precast concrete, ready mix supply, cathodic protection, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for ADA Improvements at Cannonsburgh Village under solicitation number ITB-10-2027. The project scope involves establishing an accessible path from adjacent buildings to the visitors center toilets, which includes ramp modifications, hardscape improvements from the street to new accessible parking spaces, and minor interior toilet facility upgrades such as the installation of ADA grab bars and adjustments to fixtures and countertops. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Bids must be submitted via the OpenGov portal by November 19, 2026, at 8:00 PM CST. Key contractual requirements include a 5% bid security, with performance and payment bonds required for 100% of the contract sum from a Tennessee-licensed bonding company. The contractor must submit an initial construction schedule within 21 days of the award and a quality-control plan within 10 days of the Notice to Proceed. Liquidated damages for failure to achieve substantial completion are set at 500 dollars per calendar day. Bidders must provide a lump sum base bid, a 5% contingency allowance, and unit pricing for the demolition and repouring of exposed aggregate concrete sidewalk. Required submission documents include a bid bond, a contractor responsibility questionnaire, and various certifications regarding Tennessee licensing, drug-free workplaces, and international divestment acts.
Parks and Recreation

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237310
New
SLED
LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes
Solicitation # ITB2025-172CE
The City of Palm Beach Gardens, FL, is soliciting sealed responses for the LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes under solicitation number ITB2025-172CE. The project focuses on enhancing pedestrian and cyclist safety through the construction of 5-foot bicycle lanes on both the north and south sides of Gardens Parkway between Alternate A1A and Prosperity Farms Road, as well as a new 8-foot wide sidewalk on the south side between Fairchild Gardens Avenue and Prosperity Farms Road. The contract will be awarded to the responsive and responsible bidder who offers the lowest total aggregate price. Bidders must be certified general contractors in the State of Florida and must be prequalified by the Florida Department of Transportation for contracts exceeding $250,000. The project has a maximum performance duration of 410 calendar days, and bids exceeding this timeframe will be rejected. Contractors must adhere to strict technical specifications, including FDOT Standard Plans for traffic control, OSHA safety standards, and ADA requirements for installation patterns. Key legal and labor requirements include compliance with the Davis-Bacon and Related Act, the Build America Act (BABA) for sourcing steel and iron, and the maintenance of a drug-free workplace. The contract requires a minimum one-year warranty from the date of acceptance and mandates that all offers be accompanied by a bid bond, certified check, cashier's check, or surety bond. Submissions must include a detailed work schedule, evidence of experiential qualifications from the past five years, and a list of available staff and equipment.
City Engineer

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Los Angeles County Metropolitan Transportation Authority

Same awarding agency

NAICS: 541330
SLED
Los Angeles Aerial Rapid Transit Project
Solicitation # 2020100007
The Los Angeles Aerial Rapid Transit Project, managed by the Los Angeles County Metropolitan Transportation Authority, involves the development of a 1.2-mile aerial gondola system connecting Los Angeles Union Station to the Dodger Stadium property. The route travels along Alameda Street, Spring Street, and Bishops Road, featuring an intermediate station at the Los Angeles State Historic Park. The system will include aerial cables, passenger stations, a non-passenger junction, support towers, and gondola cabins, with a maximum capacity of 5,000 people per hour per direction and an estimated travel time of seven minutes. The project aims to provide a zero-emission, high-capacity transit solution to reduce vehicular congestion and greenhouse gas emissions while providing pedestrian and landscape improvements at the Los Angeles State Historic Park. The project has undergone extensive environmental review under the California Environmental Quality Act, culminating in a Notice of Determination on December 8, 2025. This process included a Supplemental Environmental Impact Report to address court-ordered requirements regarding temporary construction noise mitigation and the feasibility of building retrofits. Key compliance mandates include adherence to the Americans with Disabilities Act for all cabins and stations, the implementation of an archaeological testing and data recovery plan for the Los Angeles State Historic Park, and strict hazardous materials abatement standards at the 1201 North Broadway site. Additionally, the project commits to a 35 percent utilization goal for minority, women, disadvantaged, and small business enterprises and requires that all construction workers be paid prevailing wages.
Engineering Services

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS