Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Metro C Line (Green) Extension to Torrance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles County Metropolitan Transportation Authority is advancing the Metro C Line (Green) Extension to Torrance, a 4.5-mile light rail project extending from the existing Redondo Beach (Marine) Station to the Torrance Transit Center, entirely within Metro-owned right-of-way, I-405, and Hawthorne Boulevard. The project involves two primary alignment options evaluated in the Final Environmental Impact Report: a below-grade trench option and an elevated structure parallel to I-405 and within the median of Hawthorne Boulevard. Two new stations—South Bay Galleria and Torrance Transit Center—will be constructed, integrating with the existing Metro K, C, and E Lines and enhancing regional connectivity, including access to LAX. The project was formally approved and the Final Environmental Impact Report certified on January 22, 2026, under the California Environmental Quality Act, with compliance governed by Public Resources Code Sections 21000–21174 and specific findings under Sections 21083 and 21108. Environmental approvals include a No Effect Determination from the California Department of Fish and Wildlife and a Notice of Determination filed with Los Angeles County. The lead agency for oversight and acceptance is LACMTA, with Project Manager Georgia Sheridan serving as the primary point of contact. The procurement documentation does not include standard federal acquisition regulatory clauses, pricing details, contract type specifications, or award evaluation criteria. No contract value is stated beyond an environmental filing fee of $4,252.50, and there are no CLINs, SLINs, or cost breakdowns provided under Section B. Section M evaluation factors, Section H special requirements, Section D packaging and marking, Section F delivery schedules and FOB terms, and Section K offeror certifications are either absent or not applicable, indicating this is primarily an environmental approval and planning phase document rather than a full competitive solicitation for construction services. No contracting officer, COR, COTR, or PCO is explicitly designated, and no system such as WAWF or IPP is referenced for invoicing. While the project’s location, alignment alternatives, stations, and environmental documentation are well-defined, the contractual framework for future construction work—including performance timelines, payment mechanisms, or contractor selection criteria—remains undefined in the available materials. The project is positioned as a state-level infrastructure initiative governed by CEQA, with federal acquisition regulations not fully incorporated into the current documentation package.

General Info

Metro C Line extension to Torrance approved, adding two stations via trench or elevated structure within existing right-of-way.

Agency

California → Los Angeles County Metropolitan Transportation Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for C Line Extension to Torrance

PDFnotice-of-determination

C Line Final EIR (Compiled)

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Metropolitan Transportation Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Metropolitan Transportation Authority
Office AddressN/A
Contacts
Georgia SheridanProject Manager

Full Description

Show more
LACMTA proposes to implement a light rail transit project that would extend the C Line (Green) from the existing Redondo Beach (Marine) Station to the Torrance Transit Center. The Final EIR evaluates the Proposed Project, which would be an elevated/street-level alignment within the Metro-owned ROW. Two options are considered between the Redondo Beach (Marine) Station and 190th Street: 1) Trench Option, with the alignment located within the Metro ROW in a below grade trench, and 2) Hawthorne Option, with the alignment located on an elevated structure parallel to I-405 and within the median of Hawthorne Boulevard.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details