Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Broadway-Manchester Active Transportation Equity Project

Closed
20260827036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

28 minutes ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 7 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Broadway-Manchester Active Transportation Equity Project (Work Order M0015817, Federal ID ATPL-5006(895)) is a construction initiative for the City of Los Angeles, Department of Public Works, Bureau of Engineering. The project focuses on improving active transportation infrastructure along a corridor in South Los Angeles, specifically spanning Manchester Avenue from South Vermont Avenue to South Broadway, and South Broadway from Manchester Avenue to Imperial Highway. With an estimated project cost of 60,770,820.00 dollars, the scope includes the installation of roadway and traffic infrastructure, such as various lighting poles, foundations, and traffic signal equipment. The contractor is responsible for all project management, labor, materials, and the procurement of necessary permits, including Worksite Traffic Control and Proposition 218 permits. The contract is subject to strict regulatory and technical standards, including the City of Los Angeles Brown Book, Caltrans Standard Specifications, and the California Manual of Uniform Traffic Control Devices. Because the project utilizes federal infrastructure funding, it must comply with Buy America provisions and nondiscrimination requirements under 49 CFR Part 21. Key technical requirements include managing aerially deposited lead and contaminated soil, as detailed in geotechnical and environmental reports, and coordinating utility relocations with agencies like the Golden State Water Company. Bidders must hold a valid State of California Contractor License Classification of A and provide a bid security of at least 10 percent of the aggregate bid sum. Final payment is processed within 60 days of Final Field Acceptance.

General Info

LA Department of Public Works solicitation for active transportation construction in Los Angeles.

Documents

15

2B Plans - Part 2

PDF, High priority: read this firstspecifications
High

2C Plans - Part 3 (utility and curve tables)

PDF, High priority: read this firstspecifications
High

2D Plans Part 4 - Utility Construction Items and Notes

PDF, High priority: read this firstspecifications
High

2E Plans Part 5 - Construction Notes

PDF, High priority: read this firstsow
High

2F Plans Part 6 - Landscape and Irrigation Notes

PDF, High priority: read this firstspecifications
High

Broadway-Manchester Active Transportation Equity Project Bid Proposal

PDF, High priority: read this first228 pages · bid-proposal
High

BROADWAY-MANCHESTER Active Transportation Equity Project Technical Specifications

PDF, High priority: read this first24 pages · specifications
High

Broadway-Manchester Active Transportation Equity Project - Technical Specifications (Traffic)

PDF, High priority: read this first9 pages · sow
High

City of Los Angeles Special Specifications for Street Lighting Systems (Nov 2021)

PDF, High priority: read this first42 pages · sow
High

Geotechnical Design Report - Broadway-Manchester ATP Equity Project

PDF, High priority: read this first116 pages · sow
High

Aerially Deposited Lead Memorandum - Broadway-Manchester ATP Equity Project

PDF, Low priority22 pages · other
Low

Broadway-Manchester ATP Project APN Table

PDF, Low prioritysite-plan
Low

EN8481 Limited Phase II Environmental Site Investigation

PDF, Low priority136 pages · other
Low

M0015817 Broadway-Manchester Active Transportation Equity Project - General Conditions

PDF, Low priority247 pages · contract-document
Low

Utility B Letter – Broadway-Manchester ATP (2nd Notice)

PDF, Low priority83 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles, Department of Public Works, Bureau of Engineering
Contacts11 people available
OfficeN/A

Full Description

Show more
Bid #ATPL-5006(895), M0015817: $18

More opportunities from California → City of Los Angeles, Department of Public Works, Bureau of Engineering

Same awarding agency

NAICS: 237310
SLED
Avalon Boulevard Improvements Martin Luther King Jr Boulevard To 56th Street (Vision Zero Program)
Solicitation # ECS0132D
Solicitation ECS0132D is a project for the City of Los Angeles, Department of Public Works, Bureau of Engineering, focused on the Avalon Boulevard Improvements from Martin Luther King Jr Boulevard to 56th Street as part of the Vision Zero Program. The scope of work involves the diversion and relocation of various utilities, including water, electrical, gas, and communications, as well as the removal and restoration of pavements, sidewalks, curbs, and gutters. All work must adhere to the Standard Specifications for Public Works Construction (Green Book) and its Additions and Amendments (Brown Book), with specific environmental requirements for concrete to meet Global Warming Potential reduction standards. The contract will be awarded to the apparent low bidder, with specific bid price preferences available for certified Local Business Enterprises, City Business Enterprises, Local Small Businesses, and Local Transitional Employers. Bidders must submit their proposals and BIP Outreach documentation via the Regional Alliance Marketplace for Procurement (RAMP) by the November 4, 2026, deadline. Key requirements for award include the submission of a bid bond, a performance bond for 100 percent of the contract price, and a payment bond. The project also mandates compliance with prevailing wage rates and established participation goals for MBE, WBE, SBE, EBE, and DVBE firms. Performance begins upon the issuance of a Notice to Proceed and concludes with the City's Statement of Completion.
Highway, Street, and Bridge Construction

POSTED

20 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS