Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Brooklyn Creek Interceptor Improvements Phase 2 RFPQ

Closed
26023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Brooklyn Creek Interceptor Improvements Phase 2 project involves the replacement and upsizing of an existing sewer interceptor with approximately 3,600 linear feet of 18-inch and 24-inch sanitary sewer lines. The work includes seven sections of trenchless construction, each ranging from 20 to 260 linear feet in length, with a casing diameter of 30 inches. Various trenchless methods will be employed to complete these sections, minimizing disruption during installation. This project is managed by the Public Utilities agency of Georgia, with work primarily occurring within the state. The solicitation, identified as number 26023, was posted on January 9, 2026, with responses due by February 5, 2026. The request is for pre-qualification, seeking qualified contractors to demonstrate their capabilities for this infrastructure upgrade. Key contacts for the solicitation include Matt Adamson, Assistant Director of Engineering, and Toro Holt, Senior Buyer, both reachable via provided contact information. The project and associated documents can be accessed online through the designated procurement portal for Athens-Clarke County government.

General Info

Replace and upsize 3,600 feet sewer interceptor with trenchless methods, Georgia utility project.

Documents

3

RFPQ 26019 Brooklyn Creek Interceptor Improvements Phase 2

PDF, High priority: read this first16 pages · rfpq
High

RFPQ #XXXXX Brooklyn Creek Interceptor Improvements Phase 2

DOCX, High priority: read this first1 page · sources-sought
High

RFPQ #XXXXX Brooklyn Creek Interceptor Improvements Phase 2 Pre-Qualification

DOCX, High priority: read this first15 pages · rfpq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Public Utilities
Contacts2 people available
OfficeAthens, GA, 30601, USA
Organization / AgencyGeorgia → Public Utilities
Office AddressAthens, GA, 30601, USA
Contacts
Matt AdamsonAssistant Director Engineering

Interested Companies (18)

Southeastern Surveying and MappingOrlando, FL
Garney CompaniesNORTH KANSAS CITY, MO
North Georgia PipelineDahlonega, GA

See All 18 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Request for Pre-Qualification for the construction of the Brooklyn Creek Interceptor Improvements Phase 2 project. This project consists of replacing and upsizing an existing sewer interceptor with approximately 3,600 linear feet of 18-inch and 24-inch sanitary sewer line, including approximately seven (7) sections of trenchless construction, ranging in length from 20 to 260 linear feet each with casing diameter of 30 inches, utilizing a variety of trenchless methods.

More opportunities from Georgia → Public Utilities

Same awarding agency

NAICS: 238320
SLED
BID #27017 J.G. Beacham Miscellaneous Coatings
Solicitation # 27017
Solicitation 27017 is a construction contract issued by the Public Utilities Department of the Unified Government of Athens-Clarke County, Georgia, for the repair and rehabilitation of miscellaneous surfaces at the J.G. Beacham Water Treatment Plant. The scope of work involves painting and applying coatings to various assets, including exposed steel with and without lead abatement, immersion accessories, basin standpipes, electrical boxes, and interior walls, to protect equipment from weather and environmental damage. The project requires the contractor to provide all necessary labor, tools, and equipment, adhering to strict quality standards such as ASTM and SSPC-VIS1-89. Key deliverables include Paint System Data Sheets, daily inspection reports, and manufacturer certificates of compliance and proper installation. Bids are due by November 18, 2026, at 11:00 a.m., and must be submitted in a sealed container including a signed original, a copy, and two USB flash drives with all documents in a single PDF. Evaluation is based on construction experience, financial capability, performance history, and the maintenance of a permanent place of business. Award requirements include a 5 percent bid bond, with 100 percent performance and payment bonds required upon award. Contract administration involves monthly progress payments reviewed by an engineer, with a 10 percent retainage applied until 50 percent of the total contract price is reached. All coating materials must be delivered in original, unopened containers with clear labeling and manufacturing dates.
Painting and Wall Covering Contractors

POSTED

13 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS