This Solicitation opportunity from Texas was posted on October 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the removal and replacement of a large hydrogate slide gate and actuator, specifically a model HG561 measuring 108 inches wide by 84 inches high. The scope of work includes the careful placement of stop logs stored on-site, dewatering, and demucking of three weir structures prior to the gate replacement. After completing the installation, the contractor will also be responsible for removing the stop logs. The project is located in Texas and is overseen by the City of Sugar Land, with a contract value estimated between $500,000 and $1,000,000. The solicitation was posted on October 16, 2024, with a response deadline of October 31, 2024. The primary point of contact is Jason Poscovsky, who can be reached via email or phone for further details. The project aims to ensure proper functioning of the weir structures through this comprehensive gate replacement effort.
HighAI Summary for 2025-ITB-001 Brooks Lake Gate No. 2 Replacement: Invitation to Bid (ITB) issued by the City of Sugar Land for the Brooks Lake Gate No. 2 Replacement project (CIP Project No. 2025-ITB-001). The solicitation seeks bids for all labor, materials, and equipment required for the project located at Brooks Lake at Ditch H. Bids are due by 11:00 am on October 31, 2024. The document outlines submission requirements, including the need for a Bid Submittal Form, Pricing Form, Bid Bond, and other certifications.
PDF
PDF, High priority: read this firstitb
HighAI Summary for 2025-ITB-001 Brooks Lake Weir Gate No. 2 Replacement: Invitation to Bid (ITB) issued by the City of Sugar Land in September 2024 for the Brooks Lake Gate No. 2 Replacement project. The document outlines the scope of work for furnishing all labor, materials, and equipment required for the project. It includes detailed instructions for bidders, submission requirements (due October 31, 2024), and a comprehensive table of contents covering contract documents, technical specifications, and bonding requirements.
PDF
PDF, High priority: read this firstitb
HighAI Summary for 2025-ITB-001 New Sunshine Substation Site Preparation: Invitation to Bid (ITB) issued by the City of Gallup, NM, for the Civil Grading & Drainage Phase of the New Sunshine Substation site preparation. Released August 9, 2024, with a response deadline of August 28, 2024. The procurement seeks a qualified contractor to perform site preparation to enhance electrical distribution reliability, with evaluation based on proposed completion date and price.
PDF
PDF, High priority: read this first2 pages · affidavit-of-wages-paid
HighAI Summary for Affidavit of Wages Paid for Construction Project: This document is an Affidavit of Wages Paid to be completed after construction is complete. It requires detailed information from the general contractor, subcontractors, and any tiered subcontractors, including company names, addresses, contact information, project title, physical address, estimated completion date, and state wage decision number. The affidavit certifies that all workers were paid no less than the prevailing wage rates as determined by the Department of Workforce Solutions, Labor Relations Division. It includes instructions for completing the form and emphasizes the legal obligation to comply with prevailing wage laws, with penalties for violations including debarment and back wage payments. The form must be sent to the contracting agency.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Gallup - New Sunshine Substation Civil Set: Civil engineering drawing set for the New Sunshine Substation project for the City of Gallup Electric Utilities Department. The document includes a list of civil plans (SS-C01 through SS-C12) covering site layout, grading, drainage, and staking. This version was issued for bid on 06/07/24.
PDF
PDF, High priority: read this first4 pages · notice-of-termination-form
HighAI Summary for EPA Form 3510-13 Notice of Termination for Stormwater Discharges: EPA Form 3510-13 is the Notice of Termination (NOT) form for stormwater discharges associated with construction activity under an NPDES General Permit. This form is used to notify that the operator is no longer authorized to discharge under the permit due to completion of earth-disturbing activities, transfer of site control, or obtaining coverage under another permit. The document includes instructions for completing the form, sections for permit information, operator information, project/site information, and certification. It requires approval from the EPA Regional Office to use the paper form and must be signed by an authorized representative. The form is approved under OMB No. 2040-0004 and replaces the previous version dated 12/08.
PDF
PDF, High priority: read this firstpermit
HighAI Summary for Gallup Municipal Right-of-Way/Public Easement Work Permit: This document is the City of Gallup Municipal Right-of-Way/Public Easement Work Permit. It outlines the requirements and responsibilities for contractors or homeowners performing work in the city's right-of-way or public easements. The permit includes conditions such as traffic control, compaction testing, backfill requirements, repaving, and repair of concrete structures. It mandates insurance coverage and specifies that the permit does not replace city building permits. The document also references municipal codes related to excavation fees, penalties, and pavement cut procedures. The permit must be displayed at the worksite and expires 90 days from the issue date.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NCIP 2409 - Brooks Lake Weir Gate No. 2 Replacement Construction Plans: Construction plans and drawings for the City of Sugar Land, Texas, project NCIP 2409 regarding the Brooks Lake Weir Gate No. 2 Replacement, dated August 2024. The document includes an index of drawings covering site plans, gate cross sections, and detailed electrical layouts.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Statement of Intent to Pay Prevailing Wages: This document is a Statement of Intent to Pay Prevailing Wages, to be completed before construction starts and submitted within 3 days of contract award. It requires detailed information from the general contractor, subcontractors, and tiered subcontractors, including company details, project title, contract amounts, and signatures. The form certifies that all workers will be paid no less than the prevailing wage rates as determined by the Department of Workforce Solutions, Labor Relations Division, referencing specific state wage decision numbers and legal requirements. Instructions for completing the form for various contractor tiers are included, emphasizing compliance with prevailing wage laws and potential penalties for violations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Submittal 1812-003: Permanent Slide Gates and Actuators: Technical submittal dated 4/2/2018 for the Brook Lake Diversion/Amil Gate Replacement project for the City of Sugar Land. The document includes material and coating specifications for stainless steel weir gates, actuator data sheets (AUMA), and technical drawings for approval.
PDF
PDF, Low priorityother
LowAI Summary for EPA Form 3510-9: NPDES Notice of Intent (NOI) for Storm Water Discharges: This is a United States Environmental Protection Agency (EPA) form used by operators to request authorization for storm water discharges associated with construction activity under a National Pollutant Discharge Elimination System (NPDES) General Permit. The document includes sections for permit numbers, operator and project site information, Storm Water Pollution Prevention Plan (SWPPP) details, discharge information, and endangered species eligibility.
PDF
PDF, Low prioritybond
LowAI Summary for Gallup Payment Bond Template: A blank template for a Payment Bond for construction work in the State of New Mexico. The document outlines the legal obligations of the Principal and Surety to ensure payment to subcontractors and material suppliers.
PDF
PDF, Low priorityother
LowAI Summary for Gallup Performance Bond Template: A blank performance bond template for a construction contract in the State of New Mexico, outlining the obligations of the Principal and Surety to guarantee the faithful performance of contract duties and the quality of workmanship for one year following completion.
PDF
PDF, Low priorityother
LowAI Summary for NMDOT Indemnification and Hold Harmless Agreement: A legal template for an Indemnification and Hold Harmless Agreement from the New Mexico Department of Transportation (NMDOT). The document requires an entity to defend and indemnify NMDOT against liability for personal injury or property damage resulting from specific activities on state highways, and mandates liability insurance of $1,000,000 per occurrence naming NMDOT as an additional insured.
PDF
PDF, Low prioritypermit
LowAI Summary for NMDOT Traffic Control/Roadway Work Permit: A standard application form from the New Mexico Department of Transportation (NMDOT) used by contractors to request a Traffic Control/Roadway Work Permit. The document collects project details, work zone locations, duration, and purpose of work, and outlines requirements for MUTCD compliance, indemnification, and insurance.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Aug 28, 2024 to Oct 31, 2024. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Remove and replace 108” W x 84” H Hydrogate slide gate and actuator, model HG561. Work includes placement of stop logs stored on-site, dewatering and demucking of the weir structure prior to the gate replacement and removal of stop logs after work is completed. There are three weir structures and all three will need to be dewatered and demucked.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award