Brookton Chase Court and Brookton Downs Subdivision Asphalt Repaving Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the complete asphalt repaving of Brookton Chase Court and the Brookton Downs Subdivision in the City of Dacula, Georgia. The work requires furnishing all labor, materials, earthwork, construction operations, supervision, and coordination of trades and inspections necessary to complete the project according to the specified scope. For Brookton Chase Court, the contractor will perform Full Depth Reclamation by milling 3.5 inches of existing asphalt and subgrade material, then mixing in Type I Portland Cement at a specified rate before installing a 2-inch binder course and a 1.5-inch surface course. The pavement crown will be re-established to ensure proper drainage into existing curbs and storm inlets. The Brookton Downs Subdivision includes Brookton Drive, Brookton Lane, and Brookton Woods Way, where heavier previous repaving has caused asphalt buildup above the gutter line. Here, the contractor will perform variable depth milling to restore the pavement flush with the gutter line and re-establish the crown. Following milling, a tack coat will be applied and then 1 inch of binder course asphalt will be placed, topped by another tack coat and a 1.5-inch surface course over all the streets. Asphalt core reports provide thickness details to guide the milling depth. Interested bidders must register with the City of Dacula and contact Kevin Whigham, P.E., the City Engineer, to receive the complete bid documents and addenda before the submission deadline.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The scope of work for Brookton Chase Court includes performing Full Depth Reclamation (FDR) which requires milling 3-1/2¿ of existing asphalt and subgrade material; then mixing Type I Portland Cement at a spread rate of 65 lbs/sy. Contractor will then install 2¿ of 19mm asphalt binder course; apply tack coat and then top with 1-1/2¿ of Type 2 - ¿F¿ Mix (9.5mm) surface course asphalt pavement. Contractor shall re-establish crown in center of road when installing pavement to promote positive drainage to existing curb & gutter and storm drainage inlets. Existing asphalt cores based on SGC report reveal asphalt thicknesses of 1-1/2¿¿ to 2-1/2¿.
Brookton Downs Subdivision consists of Brookton Drive, Brookton Lane, and Brookton Woods Way. Brookton Drive and Brookton Lane have been repaved multiple times over the years, so asphalt is built up above the gutter line. Existing asphalt cores based on SGC report reveal asphalt thicknesses of 3-3/4¿ to 5¿. Contractor will utilize variable depth milling to re-establish crown in center of road and to achieve proposed pavement that is flush with gutter line. A tack coat will then be applied prior to installing 1" of 'D' mix asphalt binder course pavement. An additional tack coat will then be applied prior to installing 1-1/2¿ of Type 2 - 'F' mix (9.5 mm) Surface Course Pavement over the entire streets.
Contact: Kevin D. Whigham, P.E., City of Dacula, City Engineer (kevin.whigham@daculaga.gov) to be logged in as a bidder and receive full bid documents. Must be logged in with City to receive all addenda.