Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Brookton Chase Court and Brookton Downs Subdivision Asphalt Repaving Project

Closed
PE-66760-NONST-2026-000000009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) to serve as subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The extensive scope of work encompasses civil and site work, including tunneling, boring, and shoring; utility installation involving various piping materials and cathodic protection; asphalt and concrete paving; and specialized electrical and telecommunications systems. The bid deadline is September 15, 2026, with invitations to bid issued through the BuildingConnected system. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, and operating engineers, and must demonstrate an ability to maintain labor harmony. Eligible bidders must possess a valid California Contractor license and provide acceptable insurance, with some subcontractors potentially requiring bonding for 100 percent of their contract value, for which Kiewit will reimburse premiums. This project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal.
Kiewit Infrastructure West Co.

POSTED

about 18 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This contract involves the complete asphalt repaving of Brookton Chase Court and the Brookton Downs Subdivision in the City of Dacula, Georgia. The work requires furnishing all labor, materials, earthwork, construction operations, supervision, and coordination of trades and inspections necessary to complete the project according to the specified scope. For Brookton Chase Court, the contractor will perform Full Depth Reclamation by milling 3.5 inches of existing asphalt and subgrade material, then mixing in Type I Portland Cement at a specified rate before installing a 2-inch binder course and a 1.5-inch surface course. The pavement crown will be re-established to ensure proper drainage into existing curbs and storm inlets. The Brookton Downs Subdivision includes Brookton Drive, Brookton Lane, and Brookton Woods Way, where heavier previous repaving has caused asphalt buildup above the gutter line. Here, the contractor will perform variable depth milling to restore the pavement flush with the gutter line and re-establish the crown. Following milling, a tack coat will be applied and then 1 inch of binder course asphalt will be placed, topped by another tack coat and a 1.5-inch surface course over all the streets. Asphalt core reports provide thickness details to guide the milling depth. Interested bidders must register with the City of Dacula and contact Kevin Whigham, P.E., the City Engineer, to receive the complete bid documents and addenda before the submission deadline.

General Info

Asphalt repaving of Brookton Chase Court and Brookton Downs, including milling, reclamation, and resurfacing.

Agency

Georgia → City of DaculaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

Brookton Chase Court and Brookton Downs Subdivision Asphalt Repaving Project Manual

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Dacula
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Dacula
View Agency Profile
Office AddressN/A

Full Description

Show more
The Work to be completed for this Project consists of furnishing all labor, materials, earthwork, construction operations, details, supervision, and coordination of all trades, utility suppliers, governmental inspections, and approvals to complete the construction, installation, and coordination for the City of Dacula ¿Brookton Chase Court and Brookton Downs Subdivision Asphalt Repaving Project¿ as follows:
The scope of work for Brookton Chase Court includes performing Full Depth Reclamation (FDR) which requires milling 3-1/2¿ of existing asphalt and subgrade material; then mixing Type I Portland Cement at a spread rate of 65 lbs/sy. Contractor will then install 2¿ of 19mm asphalt binder course; apply tack coat and then top with 1-1/2¿ of Type 2 - ¿F¿ Mix (9.5mm) surface course asphalt pavement. Contractor shall re-establish crown in center of road when installing pavement to promote positive drainage to existing curb & gutter and storm drainage inlets. Existing asphalt cores based on SGC report reveal asphalt thicknesses of 1-1/2¿¿ to 2-1/2¿.
Brookton Downs Subdivision consists of Brookton Drive, Brookton Lane, and Brookton Woods Way. Brookton Drive and Brookton Lane have been repaved multiple times over the years, so asphalt is built up above the gutter line. Existing asphalt cores based on SGC report reveal asphalt thicknesses of 3-3/4¿ to 5¿. Contractor will utilize variable depth milling to re-establish crown in center of road and to achieve proposed pavement that is flush with gutter line. A tack coat will then be applied prior to installing 1" of 'D' mix asphalt binder course pavement. An additional tack coat will then be applied prior to installing 1-1/2¿ of Type 2 - 'F' mix (9.5 mm) Surface Course Pavement over the entire streets.
Contact: Kevin D. Whigham, P.E., City of Dacula, City Engineer (kevin.whigham@daculaga.gov) to be logged in as a bidder and receive full bid documents. Must be logged in with City to receive all addenda.