Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on March 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Browning Street Improvements

Closed
25.ST.004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Browning Street Enhancements project in Woodland Park, Colorado, involves significant roadway improvements along Browning Avenue from Highway 24 to the hill's summit, including paving, milling, overlay, curb and gutter installation, and ADA-compliant pedestrian facilities. The scope encompasses laying approximately 1,100 square yards of asphalt at a 4-inch thickness, milling and overlaying about 6,300 square yards at 1.5 inches deep, installing 700 linear feet of curb and gutter, and constructing nine pedestrian facilities that meet ADA standards. The project aims to improve transportation infrastructure and pedestrian accessibility within the city. The contract solicitation was posted on March 31, 2025, with a response deadline of April 18, 2025. It is managed by the City of Woodland Park under the NAICS code 237310, indicating a focus on highway, street, and bridge construction. The project budget ranges from 1 million to 5 million dollars, reflecting its scale and importance. Interested parties can contact Sam Kozurek via email for further details and access the bid through the provided online link.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → City of Woodland Park
Contacts1 person available
OfficeN/A

Full Description

Show more
25.ST.004 - Browning Street Enhancements. Located in Teller County, Colorado, specifically in the City of Woodland Park. The project's scope includes Browning Avenue, extending from Highway 24 in the east to the western dead end at the hill's summit. Key requirements for the project involve the installation of around 1,100 square yards of asphalt at a thickness of 4 inches, a mill and overlay covering approximately 6,300 square yards at a depth of 1.5 inches, 700 linear feet of curb and gutter, and 9 pedestrian facilities that meet ADA standards.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS