Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from South Carolina was posted on April 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bryson Middle School - Architectural Design Services

Closed
125-110State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 5 hours ago

DEADLINE

in 26 days
NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals for on-call structural engineering services to support the review, analysis, inspection, and design of municipal infrastructure on an as-needed basis. The scope of work includes preparing structural calculations for traffic control signals and light-pole loading, designing foundations and retaining walls, and performing inspections of mast arms and span poles. All work must be supervised by a Professional Engineer licensed in the State of Connecticut. The contract is expected to begin in November 2026 and run through December 31, 2027, with options for three additional one-year extensions. Annual price adjustments will be based on the U.S. Bureau of Labor Statistics Consumer Price Index. Proposals are due by November 5, 2026, and will be evaluated using a points-based system focusing on demonstrated experience (30%), hourly pricing (30%), the quality and thoroughness of the proposal (20%), and the qualifications of key personnel (20%). The Town reserves the right to shortlist firms for interviews and negotiate final terms. Required submission documents include a current IRS Form W-9, FEIN/EIN, SAM number, and a Living Wage Certification. Under the Manchester Living Wage Ordinance, covered employers with contracts valued at $25,000 or more per fiscal year must pay eligible employees either $18.25 per hour with health benefits or $26.70 per hour without. Additionally, contractors must maintain insurance from an A.M. Best rated A-/VIII company, naming the Town as an additional insured.
Engineering

POSTED

about 5 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

Greenville County Schools is soliciting qualifications for full-service architectural and engineering design services to replace Bryson Middle School. The project involves the design and construction of a new campus on approximately 75 acres located at 905 Fairview Road in southern Greenville County. The facility will be approximately 160,000 square feet, designed to accommodate 1,000 students with a future capacity for 1,200. Key requirements include a prototype-based design adapted to the site, a 1,650 square foot dance studio suite, and a full suite of athletic facilities including a track with an interior soccer field, baseball, softball, and tennis courts. The design must adhere to the district's written design guide, applicable codes, and sustainability best practices while reflecting the heritage of the school and the surrounding community. The project will utilize the Construction Manager at Risk delivery method, with the CM@R firm engaged during or after the schematic design phase. The anticipated timeline includes a contract award in June 2025, with construction targeted to begin in April 2026 and reach substantial completion by June 2028 for an August 2028 opening. Qualifications must be submitted via the Procurement Portal by 4:00 pm on April 30, 2025. Selected firms must meet professional licensing requirements and maintain professional liability insurance limits based on the project budget, with minimums of 2 million dollars for projects under 10 million dollars and 5 million dollars for projects exceeding that amount. Evaluation will be based on a trade-off process emphasizing firm experience in K-12 design, technical capability, and the qualifications of the project team.

General Info

Architectural and engineering services to design and build a new Bryson Middle School.

Place of Performance

SC, USA

Set-Aside

NONE

Documents

4

BMS Preliminary Project Schedule

PDF, High priority: read this firstspecifications
High

Bryson MS Replacement - Prototype Design

PDF, High priority: read this firstspecifications
High

GCSD Supplemental Conditions to AIA B133-2019

PDF, High priority: read this firstspecifications
High

905 Fairview Road - Future BMS Map

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Greenville County Schools
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The School District of Greenville County (District) invites interested firms to submit QUALIFICATIONS to provide Bryson Middle School - Architectural Design Services for Greenville County Schools in accordance with the specifications and terms and conditions of this solicitation. Qualifications are due no later than 4:00 pm on Wednesday, April 30, 2025, through the Procurement Portal. Greenville County Schools is soliciting full service architectural and engineering design services for a new middle school campus to replace the existing Bryson Middle School. The site is located in southern Greenville County at 905 Fairview Road. This new site includes approximately 75 Acres.The intent is to award an Architectural firm a contract in June of 2025. Construction is targeted to start in April of 2026 and be substantially complete by June of 2028 so that the school facility can open for students in August of 2028.Construction of the new building will be accomplished via the Construction Manager at Risk delivery method with a CM@R firm engaged during or after schematic level drawings.A prototype design and the corresponding program has been provided for information purposes. The design process will include a site adaptation effort and confirmation of the Program with the Director of Planning and Demographics. The design will include approximately 160,000 SF (+/-) to provide adequate learning spaces for approximately 1,000 6th grade through 8th grade students and a core capable of supporting as many as 1,200 in future. Additional to the prototype design, Bryson Middle School will also include a dance studio suite (1,650 SF +/-). The design for this space will be coordinated with the Director of Performing Arts. The site will include circulation, parking and a full complement of middle school athletic facilities -- track (with soccer field interior), baseball, softball and tennis. The design aesthetic will be adapted to live in harmony with the surrounding community, and should in some manner communicate the heritage of Bryson Middle School.GCS maintains a written design guide for its facilities and expects that the facility will be designed in accordance with all applicable codes and the guide while taking into consideration the unique educational nature of the facility and best practices for sustainability.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS