Buck Road/Warren Road Resurfacing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Riverside County Transportation Department is initiating the Buck/Warren Road Resurfacing Project, identified by Work Order ZD10063C and Task Code Z1530. The project involves resurfacing approximately 6,300 feet of a two-lane, 26-foot wide Mountain Arterial roadway located in the Communities of Rancho California and French Valley. The work area extends from the intersection of Buck Road and Rancho California Road in the south to the intersection of Warren Road and Borel Road in the north. The scope of work includes grinding existing asphalt concrete in place, moisture conditioning and recompacting material, and paving with hot mix asphalt. Additional improvements consist of reconstructing asphalt concrete dikes, partial resurfacing of abutting streets, constructing new driveways, placing safety edges and shoulder backing, adjusting utility valve cans, re-striping the roadway with new pavement markers and reflectors, and replacing existing signage. All improvements will remain within the existing roadway footprint without raising the profile or requiring additional right-of-way or temporary construction easements. Environmental compliance is a critical component of this project, which has been granted a Notice of Exemption under Section 15301(c) of the California Environmental Quality Act as it pertains to the maintenance of existing facilities. All activities must adhere to the Best Management Practices of the WRMSHCP. Furthermore, if vegetation removal occurs during the migratory bird breeding season between February 1 and September 1, preconstruction nesting surveys must be conducted in accordance with the Migratory Bird Treaty Act of 1918 and specific California Fish and Game Codes. Project oversight is managed by Environmental Project Manager Jan Bulinski and Senior Transportation Planner Don Copeland.

General Info

Riverside County will resurface 6,300 feet of Buck/Warren Road using hot mix asphalt.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Buck/Warren Road Resurfacing Notice of Exemption Sept 2023

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jan BulinskiEnvironmental Project Manager

Full Description

Show more
The County of Riverside Transportation Department is proposing to resurface approximately 6,300 feet of Buck Rd/Warren Rd. The project starts on the southern end at the intersection of Buck Rd. and Rancho California Rd., as the road bends to the north it changes to Warren Rd. The project ends on the north end at the intersection of Warren Rd. and Borel Rd. Buck Rd./Warren Rd. is a two-lane, 26 foot wide road, classified as a Mountain Arterial in the County of Riverside’s General Plan. The proposed work will consist of grinding in place the existing Asphalt Concrete (AC) pavement, perform moisture conditioning and recompacting of existing material, and pave with Hot Mix Asphalt. The proposed project will also include: • Reconstruction of AC dike • Partial pavement resurfacing of abutting streets • Construction of AC driveways • Placement of safety edge and shoulder backing • Utility valve can adjustments • Re-striping of roadway, including pavement markers/reflectors • Salvage/removal of existing signs and installation of new signs The project improvements will be within the existing footprint of the roadway and will not raise the roadway profile. No additional right-of-way or Temporary Construction Easements will be required to construct the proposed improvements.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS