Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Buckman Road Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Buckman Road Bridge Replacement Project involves the demolition of a structurally deficient single-lane timber bridge over North Fork Duck Creek in Farmington, California, and its replacement with a new 43.5-foot-long, 25.5-foot-wide single-span cast-in-place reinforced concrete bridge featuring a 10-foot travel lane and two 6-foot shoulders. Construction activities include vegetation clearing, pile driving, grading, paving, and the installation of rock slope protection, with a temporary low-water crossing composed of corrugated metal pipes and aggregate fill being installed 20 feet west of the existing structure to maintain site access during construction. The project is governed by the California Fish and Game Code Section 1602 through Streambed Alteration Agreement EPIMS Notification SJN-59468-R2, executed by the California Department of Fish and Wildlife on January 26, 2026, and is subject to a Mitigated Negative Declaration under CEQA to ensure no significant environmental impact. San Joaquin County serves as the Lead Agency while CDFW acts as the Responsible Agency, overseeing compliance with environmental regulations and mitigation conditions. Although the project is publicly forecasted with a posted date of January 27, 2026, no formal contract value, pricing, award basis, or detailed performance timeline has been disclosed. Contract administration details such as payment instructions, invoicing systems, accounting codes, and designated COR or PCO roles are not provided, and no standard FAR clauses, special contract requirements, or solicitation instructions are included in the documentation. The point of performance is clearly defined at Buckman Road, Farmington, CA, with contacts for environmental oversight including Hailey Donaldson and Brian Newburg, yet no offeror representations, size certifications, or UEI/CAGE information are available, indicating the current material functions as a project notification rather than a formal procurement contract.

General Info

Replace aging timber bridge with concrete bridge, install temporary crossing, comply with environmental regulations.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Buckman Road Bridge Replacement SJN-59468-R2

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Hailey DonaldsonEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SJN-59468-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Najee Zarif . The project consists of the demolition and replacement of the existing structurally deficient, single-lane, timber bridge over North Fork Duck Creek with a single-span, cast-in-place reinforced concrete bridge with a 10-foot-wide travel lane and two 6-foot shoulders. The new bridge will be 43.5 feet long, and 25.5 feet wide. A temporary low-water crossing will be installed approximately 20 feet west of the existing bridge, consisting of corrugated metal pipes and aggregate fill to maintain access to the project site. Construction activities will include vegetation clearing, pile driving, grading, paving, and installation of rock slope protection.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details