This Solicitation opportunity from Minnesota was posted on February 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Building 1-4 Roof Replacement MCF Rush City
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract for the Building 1-4 Roof Replacement at MCF Rush City involves a single prime construction agreement focused on general construction services. The scope includes removing the existing roofing system down to the insulation surface and installing a new fully adhered EPDM roof system. Additionally, the project encompasses replacing the concrete apron around the building, modifying side drainage, and installing new drain tiles to improve water management. The work also involves removing and reinstalling the existing lightning protection system and making minor modifications to rooftop mechanical equipment and roof drainage systems to ensure proper functionality and integration with the new roofing. The project is managed by the Minnesota Department of Administration and is open for responses until April 4, 2025. The contract value is estimated to range between $500,000 and $1,500,000. The solicitation was posted on February 27, 2025, and interested contractors can find additional details and submit their responses through the provided online link. The primary point of contact for the project is Craig Fernholz, an Acquisition Management Specialist, reachable via email or phone for further inquiries.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The work will be done under one prime contract that includes: General Construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Remove the existing roof system to the surface of the existing insulation. Install new fully adhered EPDM roof system. 2. Replace a concrete apron around the building, modify side drainage and install new drain tile. 3. Remove and reinstall existing lightning protection system. 4. Minor modification to roof top mechanical equipment and roof drainage.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
