Building 37000 Plant 1 Repair Restrooms

Awarded
W912PP26QA029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, awarded as an 8(a) Sole Source Set-Aside by the Department of Defense, covers the repair and renovation of restrooms in Building 37000 Plant 1. The scope of work includes the demolition and disposal of existing flooring, fixtures, partition walls, and a kitchenette, with specific requirements to salvage certain doors and preserve existing wall tiles and ceiling grids. The contractor is responsible for providing all labor, materials, and equipment to install new plumbing fixtures, including water closets, lavatories, urinals, and a mop sink. Additional construction tasks involve installing new epoxy flooring, metal stud partition walls, ADA grab bars, mirrors, and signage. The project also requires electrical and mechanical updates, including the installation of GFCI receptacles, reconfiguration of lighting and HVAC systems, and the installation of new exhaust fans tied into the existing building system.

General Info

DoD 8(a) sole source contract for restroom renovation and updates in Building 37000.

Contract Value

$188,955.16

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

0, NM, 87117, USA

Set-Aside

8A

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
Contacts1 person available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
Contacts
Glenda D. Kohlieber

Full Description

Show more

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.


The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 37000 Plant 1 Repair Restrooms.  


  1. Contractor must remove and dispose of existing flooring. (Abatement TBD) Clean, degrease, and prep slab to received new epoxy flooring.
  2. Contractor must remove and dispose of existing fixtures. Preserve existing wall tiles and ceiling grid/lighting.
  3. Contractor must demolish existing partition wall. Salvage all three (3) existing doors in room P2.
  4. Contractor must remove and dispose of existing kitchenette. Existing plumbing lines must be capped.

  1. Construction
    1. Contractor must provide and install four (4) new water closets (WC-1) and associated plumbing. 
    2. Contractor must provide and install four (4) new lavatories (SINK-1) and faucets (FC-1) and associated plumbing. 
    3. Contractor must provide and install two (2) new urinals and associated plumbing. Provide and install new urinal screen (US-1) at each urinal. 
    4. Contractor must provide and install two (2) new toilet partitions (TPART). One to be installed to meet requirements of ANSI 117.1
    5. Contractor must provide and install new partition walls utilizing 3-5/8” metal studs and gypsum wall board. Fill with acoustic batt insulation. Where required to facilitate plumbing utilities or fixture hangers, 6” metal studs may be used.
    6. Contractor must provide and install new doors and re-install salvaged doors. New doors to match characteristics of existing door.
    7. Contractor must provide and install new epoxy flooring (EP-1). Slab must be prepared to receive finish per manufacturer instructions.
    8. Contractor must install government provided trash cans, toilet paper, soap and paper towel dispensers.
    9. Contractor must provide and apply paint (PT-1) on indicated walls.
    10. Contractor must provide and install new GFCI receptacles.
    11. Contractor must provide and install new mop sink (SINK-2), mop sink faucet (FC-2) and associated plumbing. Provide and install mop hooks.
    1. Contractor must provide and install new mirrors.
    2. Contractor must provide and install new ADA grab bars.
    3. Contractor must provide and install new restroom signage for each restroom per KAFB standards.
    4. Existing ceiling to remain.  Contractor must reconfigure lighting and HVAC to accommodate new space layout.  Provide and install new lighting switches as required.  Rebalance HVAC.
    5. Contractor must provide and install new grid mounted light fixture.
    6. Contractor must provide and install new exhaust fans, tie into existing building exhaust system.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope encompasses total facility construction, including site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, and the installation of a concrete slab. Key technical requirements include the installation of underground utilities, a dry pipe fire suppression system compliant with UFC 3-600-01 and NFPA 13, and specialized dehumidifying equipment. The facility must also be solar-ready and adhere to ADA access standards and Buy America Act requirements for fire alarm components. This is a Firm Fixed Price task order issued against a MATOC IDIQ contract, with an estimated magnitude between 1 million and 5 million dollars. The government will award the contract based on a balanced evaluation of technical capability and price, specifically reviewing the proposed project schedule and key personnel qualifications. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed, with total completion required within 365 calendar days. Bidders must provide a bid guarantee and are subject to prevailing wage rates per General Decision Number WA20260111 for Pierce County. All offers are due by 12:00pm PST on October 18, 2026.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses, and all work must adhere to Davis Bacon Wage Rates. The project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
Construction Manager at Risk Services Maintenance Capital Program Group 1
Solicitation # RFP2027.5
Lexington County School District One is soliciting competitive sealed proposals for a Construction Manager at Risk (CM-R) to provide preconstruction and construction services for two existing-facility improvements, identified as Projects 1-01 through 1-02. With a preliminary construction planning budget of 5,400,000 dollars, the selected firm will be responsible for delivering code-compliant work while ensuring schools and support facilities remain occupied and operational. The project scope encompasses the development of master program schedules, open-book cost models, and the coordination of hazardous-material surveys and utility shutdowns, culminating in final acceptance and a corrective-work period of at least one year. The contract will be based on AIA A133-2019 and AIA A201-2017 standard forms, governed by South Carolina law and the District Procurement Code, with no federal or grant funds applied. Award will be granted to a single responsible offeror based on a 100-point evaluation consisting of 88 non-cost points and 12 cost points. Key evaluation criteria include staff qualifications, similar CM-R experience in occupied facilities, program management approach, and financial bonding capacity. Proposals must be submitted via the Beacon Bid portal by November 2, 2026, and must include a technical proposal, a redacted public copy, and a separate sealed cost proposal. Performance and payment bonds equal to 100 percent of the applicable Guaranteed Maximum Price are required prior to the start of construction.
Lexington County School District One

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS