Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on March 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Building 46 Repair Room 517

Closed
SP470326Q0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, and the contractor must maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors are required to use the Textura electronic invoicing system, provide a 100 percent performance and labor bond if requested, and adhere to arcflash compliance for electrical work. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Richmond, VA, USA

Set-Aside

SBA

Documents

6

Addendum to RFP Offer Requirements

PDF, High priority: read this first2 pages · amendment
High

Amendment 0001 to Solicitation SP4703-26-Q-0019 dated 03-02-2026

PDF, High priority: read this first1 page · amendment
High

Amendment 0002 to Solicitation SP4703-26-Q-0019

PDF, High priority: read this firstamendment
High

Solicitation SP4703-26-Q-0019 for Room 517 Office Conversion

PDF, High priority: read this first35 pages · rfp
High

Statement of Work for Building 46 Room 517 Repairs

PDF, High priority: read this first47 pages · sow
High

Wage Determination VA20240206 Heavy Construction Virginia

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 21, 2026 to Mar 28, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Dcso Richmond Division #1
Contacts2 people available
OfficeRICHMOND, VA, 23237, USA
Office AddressRICHMOND, VA, 23237, USA

Full Description

Show more

Defense Logistics Agency (DLA)Building 46 Repair Room 517


This is a combined synopsis/solicitation for construction prepared in accordance with FAR Part 12 supplemented by FAR Part 36. The solicitation number SP4703-26-Q-00019 is issued as a request for proposal (RFP).  The resulting contract will be a firm-fixed price award with an expected Period of Performance of 90 days from the issuance of the Notice to Proceed. This acquisition is set-aside for 100% small businesses.  The North American Industry Classification System (NAICS) Code is 236220 (Commercial and Institutional Building Construction).  The small business size standard is $45M.  Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA).  Partial proposals will not be accepted.  


For an offer to be considered for award, the contractor must own, possess, or otherwise control a bona fide place of business from which mobilization occurs within 120 miles of DSCR. A bona fide place of business refers to a location where the offeror regularly maintains an office with at least one full-time employee. The offeror must include the address of this location in its bid.


This requirement is to change room 517 from a supply room to a one-person office. Building 46 has a room that is not being utilized as designed. The customer would like this room to be reconfigured to be a single office.


SPECIFIC REQUIREMENTS: Hang heavy duty plastic with center zipper to cover the opening to room 517. Remove all shelving and brackets. Delivery to building 59 and load onto racks where directed. Prepare all walls and ceilings to level 4 IAW GA 214. The contractor must use a dustless sanding vacuum system when preparing the walls to minimize dust. No dust can migrate out of the breakroom. Use of an additional HEPA filter vacuum system in addition to the dustless sanding is required. Submit a separate dust plan for approval. Prime and paint a minimum of 2 coats of satin sheen paint (IAW MPI), off white, provide samples for the exact choice. Add ¾” 3’x3’ plywood on the wall the door is located for a TV to be mounted. TV, mount etc. not in contract. Paint the plywood. Add an electrical outlet on the wall the door is in 6’AFF for the TV. Run new 12-gauge wire from electrical room 514. Add a single gang data box with 1” conduit next to the TV outlet. Run the conduct to the cable tray just outside the office. Provide pull string. On the wall to the right of the door as you enter, add a single gang box with ¾” conduit, centered in the wall. Run the conduct to the cable tray just outside the office. Provide pull string. Add a single gang electrical outlet next to the new data box. The new wire run from room 514 can also be used for this outlet.


Reference Statement of Work (SOW) for additional work scope and details.


Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice.  Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS. 
                                                      
The contractor must be registered in the System for Award Management (SAM) prior to award.  If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote. 


Site visit is required prior to submission of quote. 


Site visit date and time: March 17, 2026, at 10:00AM EST


Site visit request/facility access: contact Michael O'Conner at Michael.OConnor@dla.mil or (804)306-5273


The contractor must be registered in the System for Award Management (SAM) prior to award. SAM is the official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. If not already registered in SAM, go to www.sam.gov to register prior to submitting your proposal.


All questions must be submitted by March 16, 2026.  Acceptable method of quote or inquiries submission is email to justin.1.jones@dla.mil.


Access to Defense Supply Center Richmond is dictated by the language at the following location:


https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/


The points of contact (POC) for this requirement is Justin Jones (justin.1.jones@dla.mil).


Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details.


See Attachment 2 – Wage Determination.


See Attachment 3 - Addendum to RFP - Offer Requirements


A new system will be implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR.  The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s.  


The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System).  To begin the process, visitors and contractors will complete registration through the pre-enrollment website: https://dbids-global-enroll.dmdc.mil.  


Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code.  The codes will be electronically sent to the visiting person’s sponsor.  Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information.  Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass.  At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process. 


LIMITATIONS ON SUBCONTRACTING (FEB 2023) (DEVIATION 2021-O0008)  (a)  This clause does not apply to the unrestricted portion of a partial set-aside.  (b)  Definition.  Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—   (1)  Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and    (2)  Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.   (c)  Applicability.  This clause applies only to—    (1)  Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);    (2)  Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);    (3)  Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;    (4)  Orders expected to exceed the simplified acquisition threshold and that are—   (i)  Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or   (ii)  Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);   (5)  Orders, regardless of dollar value, that are—    (i)  Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or    (ii)  Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and   (6)  Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d)  Independent contractors. An independent contractor shall be considered a subcontractor.  (e)  Limitations on subcontracting.  By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—   (1)  Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that  are not similarly situated entities.  Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded.  When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.  The following services may be excluded from the 50 percent limitation:     (i)  Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service.  Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.     (ii)  Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.   (2)  Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.  Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded.  When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;   (3)  General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.  Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or   (4)  Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.  Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.  (f)  The Contractor shall comply with the limitations on subcontracting as follows:   (1)  For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause–  [Contracting Officer check as appropriate.]  __ By the end of the base term of the contract and then by the end of each subsequent option period; or  __ By the end of the performance period for each order issued under the contract.   (2)  For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.  (g)  A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.  (1)  In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.  Work performed by the small business protégé in the joint venture must be more than administrative functions.  (2)  In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.  Work performed by the 8(a) participants in the joint venture must be more than administrative functions. (End of clause)


**********************ADDITIONAL INFORMATION*******************************


A site visit will be held 03/11/2026 @1000.  See p.45 of SOW for map for location of DSCR CDC/Building 46


In order to attend the site visit interested parties MUST follow the instructions below. This is to allow time for screening by base security.  Plan on arriving at DSCR an hour prior to the site visit time, as the processing time through the visitor center fluctuates.  Follow the link below to register through DBIDS, and a QR code should be provided for each visitor.  The QR codes MUST be emailed to the Project Manager, Mike O'Connor, Michael.OConnor@dla.mil. (Work Cell: 804-306-5273).  The QR code MUST be emailed to the project manager no less than three working days prior to the site visit. The project manager will also serve as the sponsor for site visit attendees.  


A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s.  The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the pre-enrollment website: 


https://dbids-global-enroll.dmdc.mil.


Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have
an individualized barcode and alpha numeric code. The codes need to be sent to the visiting person’s
sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the
barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access,
Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to
obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process
and completes the credentialing process.”


******************************************************AMENDMENT 0001************************************************************************


The purpose of this amendment is to do the following:


  1. Change site visit from March 11th at 10:00am to March 17th at 10:00am

All other terms and conditions remain the same.



******************************************************AMENDMENT 0002************************************************************************


The purpose of this amendment is to do the following:


1. Change quote submissions due date from March 20th  to March 27th


All other terms and conditions remain the same. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS