Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Building 66017 Repair Restrooms at KAFB

Awarded
W912PP26QA026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract was awarded as an 8(a) Sole Source Set-Aside to the Department of Defense for the repair of restrooms in Building 66017 at KAFB in New Mexico. The scope of work requires the contractor to provide all necessary labor, materials, and equipment to complete a full renovation. Initial phases involve the demolition and disposal of existing ceiling grids, plumbing fixtures, walls, flooring, and an exterior door and frame, while preserving specific items like the drinking fountain and fire extinguisher for reuse. The construction phase includes installing new moisture-resistant gypsum ceilings and walls, LED lighting, exhaust fans, and HVAC diffusers. The contractor is responsible for installing new water closets, wall-mounted lavatories, and ADA-compliant showers and grab bars. Additional requirements include the installation of fiberglass reinforced paneling, wood doors with privacy locks, a weatherproof exterior infill wall, and government-furnished vinyl flooring. The project concludes with the installation of signage, mirrors, and various restroom accessories to meet KAFB and ADA standards.

General Info

8(a) sole source contract for restroom renovation and ADA compliance at KAFB, New Mexico.

Contract Value

$161,342.4

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

0, NM, 87117, USA

Set-Aside

8A

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
Contacts1 person available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
Contacts
Glenda D. Kohlieber

Full Description

Show more

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.


The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 66017 Repair Restrooms. 


Demolition


  1. Contractor must remove and dispose of existing ceiling grid, ceiling tiles, gyp ceilings, light fixtures, and mechanical diffusers and grills within scope of work boundary. (Approx. 150 Sq. Ft.)
  2. Contractor must remove and dispose of existing restroom plumbing fixtures within SOW boundary.
  3. Contractor must remove and dispose of existing restroom walls within SOW boundary.
  4. Contractor must remove and dispose of existing exterior door and frame. Prep opening for wall infill.
  5. Contractor must remove and dispose of existing exterior metal steps.
  6. Contractor must remove and dispose of existing interior vestibule door and frame.
  7. Contractor must remove and dispose of existing flooring and resilient wall base in existing restrooms and vestibule.
  8. All receptacles located within demolished walls must be removed and conduit and wiring must be removed back to nearest J-box.
  9. Contractor must remove and set aside existing drinking fountain for reuse in new work. All utility lines not reutilized in new work must be capped under floor or in nearest wall not being removed.
  10. Contractor must remove and dispose of existing fire alarm pull station – wiring back to nearest J-box.
  11. Contractor must remove existing fire extinguisher and bracket and set aside for reuse in new work.


  1. Construction
    1. Contractor must construct new ceiling with metal studs and moisture resistant gypsum wall board in each restroom. Ceiling to be taped, textured, and

painted (P-1).


    1. Contractor must provide and install new exhaust fan (EF-1) in each restroom

as indicated on drawings. Contractor must configure existing exhaust system to new fan locations. Exhaust fans must be connected to restroom light switch.


    1. Contractor must provide and install new LED light fixtures (LF-1) utilizing existing circuitry. Contractor must provide and install light switches with stainless steel cover plates for each restroom.
    2. Contractor must provide and install mechanical diffusers as indicated on plans, connect back to existing HVAC system.
    3. Contractor must provide and construct new restroom partition walls as indicated on plans – wall construction to be moisture resistant gypsum wall board on metal studs. Studs to be metal 3-5/8” or 6” if required to facilitate plumbing. Contractor must tape, texture, and paint walls (P-2).
    4. Contractor must provide and install Fiberglass Reinforced Paneling wall covering up to 60” AFF around interior of restroom walls.
    5. Contractor must provide and install new water closets (WC-1, WC-2) in each restroom, each water closet must be tied into existing utilities (supply water, sanitary drain) as required for proper functioning.
    6. Contractor must provide and wall mounted lavatories (LV-1) and faucet (FC-1) in each restroom, each lavatory must be tied into existing utilities (supply hot and cold water, sanitary drain) as required for proper functioning.
    7. Contractor must provide and install grab bars as indicated on drawings. Installation must meet requirements of ANSI 117.1 and the Americans with Disabilities Act (ADA), current version.
    8. Contractor must provide and install shower surround, shower curtain rod, shower head with detachable wand. Shower pan and head must be connected to existing utilities (hot and cold supply water, sanitary drain) as required for proper functioning. Shower must meet requirements of ASNI 117.1 & ADA.
    9. Contractor must provide and install mirrors (M-1) at each lavatory.
    10. Contractor must install government provided restroom accessories, including toilet paper dispensers, soap dispensers, paper towel dispensers, and sanitary napkin waste cans.
    11. Contractor must provide and install new wood doors, hardware, and frames where indicated on drawings. Doors hardware must include privacy lock with occupancy indicator.
    12. Contractor must provide and install exterior infill wall at location of previous door. Wall must be weatherproof, insulated and finished flush to match on both interior and exterior faces.
    13. Contractor must provide and install opaque privacy film at existing window.
    14. Contractor must install drinking fountain with bottle filler set aside during demolition at location indicated on drawing. Drinking fountain must be tied into existing utilities (supply water, sanitary drain) as required for proper functioning. Relocate existing light switch as required.
    15. Contractor must reinstall existing fire extinguisher and bracket.
    16. Contractor must provide and install coat hooks in each restroom.
    17. Contractor must provide and install signage on restrooms complying with KAFB and ADA standards.
    18. Contractor must provide and install floor drain (FD-1).
    19. Contractor must install government furnished vinyl flooring (FL-1) and resilient wall base (WB-1) in SOW area.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope encompasses total facility construction, including site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, and the installation of a concrete slab. Key technical requirements include the installation of underground utilities, a dry pipe fire suppression system compliant with UFC 3-600-01 and NFPA 13, and specialized dehumidifying equipment. The facility must also be solar-ready and adhere to ADA access standards and Buy America Act requirements for fire alarm components. This is a Firm Fixed Price task order issued against a MATOC IDIQ contract, with an estimated magnitude between 1 million and 5 million dollars. The government will award the contract based on a balanced evaluation of technical capability and price, specifically reviewing the proposed project schedule and key personnel qualifications. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed, with total completion required within 365 calendar days. Bidders must provide a bid guarantee and are subject to prevailing wage rates per General Decision Number WA20260111 for Pierce County. All offers are due by 12:00pm PST on October 18, 2026.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses, and all work must adhere to Davis Bacon Wage Rates. The project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
Construction Manager at Risk Services Maintenance Capital Program Group 1
Solicitation # RFP2027.5
Lexington County School District One is soliciting competitive sealed proposals for a Construction Manager at Risk (CM-R) to provide preconstruction and construction services for two existing-facility improvements, identified as Projects 1-01 through 1-02. With a preliminary construction planning budget of 5,400,000 dollars, the selected firm will be responsible for delivering code-compliant work while ensuring schools and support facilities remain occupied and operational. The project scope encompasses the development of master program schedules, open-book cost models, and the coordination of hazardous-material surveys and utility shutdowns, culminating in final acceptance and a corrective-work period of at least one year. The contract will be based on AIA A133-2019 and AIA A201-2017 standard forms, governed by South Carolina law and the District Procurement Code, with no federal or grant funds applied. Award will be granted to a single responsible offeror based on a 100-point evaluation consisting of 88 non-cost points and 12 cost points. Key evaluation criteria include staff qualifications, similar CM-R experience in occupied facilities, program management approach, and financial bonding capacity. Proposals must be submitted via the Beacon Bid portal by November 2, 2026, and must include a technical proposal, a redacted public copy, and a separate sealed cost proposal. Performance and payment bonds equal to 100 percent of the applicable Guaranteed Maximum Price are required prior to the start of construction.
Lexington County School District One

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS