Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Buildings 1383 and 1384 Inside Plant (ISP) Replacement and Building 123 Fiber Optic Work

Closed
FA488725R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
City of Piqua

POSTED

about 19 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

about 23 hours ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
Refurbishment Of Existing On Load Tap Changer At Adobe Creek Substation - AC21
Solicitation # RFQ199445
The City of Palo Alto Utilities Department is soliciting quotes under RFQ199445 for the refurbishment of an existing on-load tap changer (OLTC) at the Adobe Creek Electric Substation (AC-21). The project specifically requires the replacement of the TLH-21 LTC on an Allis Chalmers 15MVA transformer with a certified re-manufactured component. The scope of work includes draining and processing transformer oil, filling the LTC tank with 760 gallons of new oil, re-sealing the barrier board and pass-through studs, and replacing valves and gaskets on six radiators along with the 60KV SMD fuse holder. Comprehensive preliminary and post-work testing, including Power Factor, TTR, and DGA/oil quality testing, is mandatory. The City has standardized its requirements for the Allis Chalmers TLH-21 and will not accept alternate materials or equivalent products. Eligible bidders must hold a valid California Class A license and be registered with the DIR. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. As a public works project, it is subject to California prevailing wage laws and requires the contractor to provide performance and payment surety bonds totaling at least 100 percent of the contract value. Additionally, contractors must meet strict insurance requirements, including general liability and worker's compensation, and comply with the City's Environmental Purchasing Policy. Bids must be submitted electronically via the OpenGov portal by November 3, 2026.
Utilities

POSTED

1 day ago

DEADLINE

in 14 days

General Info

Contract Value

$880,704

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Luke Air Force Base, AZ, 85309, USA

Set-Aside

WOSB

Award Issued Date

Documents

28

2015 Arizona Uniform Standard Details for Public Works Construction

PDF, High priority: read this first151 pages · specifications
High

2025 MAG Specifications for Public Works Construction

PDF, High priority: read this first498 pages · specifications
High

AETC First 400 Feet Standard Guidance - Luke AFB Supplement

PDF, High priority: read this first88 pages · specifications
High

As-Built Bldg 1383 - Electrical Renovation Power Plan

PDF, High priority: read this first44 pages · specifications
High

As-Built Drawings - Luke AFB Buildings 318, 334, and 343

PDF, High priority: read this firstspecifications
High

B123 Communications Facility Drawings - AS-BUILD

PDF, High priority: read this first2 pages · specifications
High

B1383 Asbestos Recertification - Wiring Upgrade

PDF, High priority: read this first41 pages · specifications
High

B1383 Comm Cabinet Rack Elevation - Room 123

PDF, High priority: read this firstspecifications
High

B1384 Asbestos Recertification - Wiring Upgrade

PDF, High priority: read this first45 pages · specifications
High

B1384 Comm Cabinet Rack Elevation

PDF, High priority: read this firstspecifications
High

CDRL A008 Telecommunications System Installation Plan - Luke AFB

PDF, High priority: read this first8 pages · specifications
High

FA488725R0008 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

FA488725R0008 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

FA488725R0008 Amendment 0003

PDF, High priority: read this first2 pages · amendment
High

FA488725R0008 - Building 1383/1384 ISP Replacement and Fiber Optic Work

PDF, High priority: read this first30 pages · rfp
High

FA488725R0008 RFI Log - B1383/B1384 ISP and B123 Fiber Optic

XLSX, High priority: read this first3 pages · q-and-a
High

Luke AFB BLDG 528 As-Built Record Drawings

PDF, High priority: read this firstspecifications
High

Section L - Instructions, Conditions, and Notices to Offerors

PDF, High priority: read this first7 pages · rfp
High

Section M - Evaluation Factors For Award

PDF, High priority: read this first7 pages · specifications
High

SOW - Fiber Optic Cable (FOC) Luke AFB B123 to B528/B530

PDF, High priority: read this first37 pages · sow
High

SOW - Inside Plant Wiring Upgrade, Building 1384 (Luke AFB)

PDF, High priority: read this first25 pages · sow
High

SOW - Luke AFB B1383 ISP Upgrade

PDF, High priority: read this first25 pages · sow
High

Wage Determination AZ20250039 - Maricopa County, AZ

PDF, High priority: read this first7 pages · wage-determination
High

AF Eagle Eyes Program - Anti-Terrorism Pamphlet

PDF, Low priorityother
Low

FA488725R0008 - Past Performance Questionnaire (Form PPQ-0)

DOCX, Low priority4 pages · past-performance
Low

Luke AFB Building 528 Limited Asbestos Survey (ProTeX Job #15314)

PDF, Low priority16 pages · specifications
Low

Luke AFB Building 530 Limited Asbestos Survey

PDF, Low priority16 pages · specifications
Low

Attachment+9+-+LUKE+MASTER+SPECS.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jul 21, 2025 to Jul 31, 2025. The notice description changed.

Notice updated

Response deadline changed from Jul 31, 2025 to Aug 7, 2025. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA

Full Description

Show more
******************* Amendment 0003 Issued 28 July 2025 ********************** The purpose of Amendment 0003 is to add the following attachment: Attachment 24 - B123 Rack Elevations See the attached Amendment 0003 for full details. *********************************************************************************** ******************* Amendment 0002 Issued 25 July 2025 ****************** The purpose of Amendment 0002 is to extend the proposal due date from 31 July 2025 to 7 Aug 2025 and add the following attachments: Attachment 1 - SOW Luke AFB B1383 ISP Upgrade - 25July2025 Attachment 2 - SOW Luke AFB B1384 ISP Upgrade - 25July2025 Attachment 10 - WD AZ20250039 dated 25 July 2025 Attachment 12 - RFI Log - B1383 and B1384 ISP Replacement and B123 Fiber Optic - Gov Response Attachment 16 - B123 Communications Facility Drawings AS-BUILD 9-29-2022 Attachment 17 - B1383 Comm Cabinet Rack Elevation Attachment 18 - B1384 Comm Cabinet Rack Elevation Attachment 19 - Luke AFB BLDG 528 - As-Built Attachment 20 - As-Built bldg 1383 Attachment 21 - As-Built 1384 Attachment 22 - 2015 MAG Detail Drawings Attachment 23 - 2025 MAG Specifications for Public Works Construction See the attached Amendment 0002 for full details. *********************************************************************************** ******************** Amendment 0001 Issued on 17 July 2025 ************** The purpose of Amendment 0001 is to extend the proposal due date from 21 July 2025 to 31 July 2025 due to the final review of the RFI's. See the attached Amendment 0001 for full details. ******************************************************************** The Department of the Air Force, 56 Contracting Squadron, is solicitating a request for proposal for Buildings 1383 and 1384 Inside Plant (ISP) Replacement and Building 123 Fiber Optic Work at Luke Air Force Base, Arizona. Please reference the documents attached to this RFP which provide all details of the required work to be performed. A site visit is scheduled for Thursday 26 June 2025 at 0800am MST (Arizona does not participate in daylight savings time). Any personnel needing base passes should meet at the South Gate Visitors Center at 0700 with a REAL-ID compliant ID or 2 forms of unexpired acceptable alternative identification. RFIs are due to the Points of Contact by 1100am MST on 3 July 2025 using Attachment 12 - RFI Log, attached to this solicitation notice. Any RFIs submitted after this deadline may not be considered for response. Proposals are due electronically to the Points of Contact for this solicitation no later than 21 July 2025 by 1200pm MST. This procurement is an SBA CERTIFIED WOMEN OWNED SMALL BUSINESS (WOSB) SET ASIDE AND IS LIMITED TO SBA CERTIFIED WOSB. Contractors are required to be certified prior to contract award. All prospective contractors must be actively registered in the System for Award Management (SAM), in order to be eligible for an award. IAW FAR 36.204 the magnitude of construction is between $500,000.00 and $1,000,000.00. Notice to Offeror(s): Funds are presently available for this effort. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
Fiber Optic Cable Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS