Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on June 7, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BULKHEAD REPLACEMENT PHASE II AT U.S. COAST GUARD BASE MIAMI BEACH, FLORIDA

Awarded
HSCG82-16-B-PMV128Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract involves the replacement of the bulkhead at the U.S. Coast Guard Base in Miami Beach, Florida, requiring the contractor to provide all necessary labor, materials, equipment, and supervision. The scope of work includes site concrete demolition and disposal, new site construction, underwater surveys, debris removal including live coral transportation, excavation behind existing pile caps, removal and installation of cleats, design and installation of soil anchors, load testing, concrete pile caps, pavement re-striping, curb painting, and light pole replacement. The project has a performance period of 220 calendar days with an estimated value between $1 million and $5 million, aligned with NAICS code 237990 and set aside entirely for small business concerns. Bid, payment, and performance bonds are mandatory, and the bid opening was scheduled for May 3, 2016. The solicitation was issued by the U.S. Coast Guard under the Department of Homeland Security, with the acquisition currently set as a total small business set-aside, though consideration for HUBZone or Service-Disabled Veteran-Owned Small Business designations was also mentioned. Interested firms with appropriate certification were encouraged to express intent to bid by February 18, 2016, providing evidence of relevant experience and bonding capability. The contract emphasizes adherence to FAR guidelines governing set-asides, with all solicitation documents and amendments available online at no cost. Key contacts include Contracting Officers Odalys McGee and Ada M. Hoggard for further inquiries.

General Info

Replace Miami Coast Guard bulkhead with labor, materials, equipment; small business set-aside, 220 days.

Contract Value

$3,163,184

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

U.S. COAST GURAD BASE MIAMI BEACH 100 MACARTHUR CAUSEWAY, MIAMI BEACH, FL, 33139, USA

Set-Aside

NONE

Award Issued Date

Documents

6

HSCG82-16-B-PMV128 Amendment 0001

PDF, High priority: read this firstamendment
High

HSCG82-16-B-PMV128 - Construction, Alteration, or Repair

PDF, High priority: read this first58 pages · ifb
High

M2140-D Replace Bulkhead (Zone 4) - USCG Base Miami Beach

PDF, High priority: read this firstspecifications
High

Project No. 5147648 - Replace Bulkhead Base Miami Beach (Zone 4) Specifications

PDF, High priority: read this first184 pages · specifications
High

HSCG82-16-B-PMV128 Abstract of Offers - Buildhead Replacement Phase II

PDF, Low priorityabstract-of-offers
Low

Appendicies.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

The response deadline was removed. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

Response deadline added: May 3, 2016. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The response deadline was removed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Ceu MIAMI(00082)
Contacts2 people available
OfficeMIAMI, FL, 33177, USA
Office AddressMIAMI, FL, 33177, USA
Contacts
Odalys McGeeContracting Officer
Ada M HoggardContracting Officer

Full Description

Show more
ABSTRACT OF OFFERS IS ATTACHED. ******************************************************************* AMENDMENT NO. 0001 IS ATTACHED ALONG WITH APPENDICES A-I. BID OPENING DATE REMAINS MAY 3, 2016 AT 2:00PM ******************************************************************* SOLICITATION NOTICE: THE INVITATION FOR BID PACKAGE IS ATTACHED. ******************************************************************* SYNOPSIS: SET ASIDED DETERMINATION THIS SOLICITATION IS BEING SET ASIDE AS TOTAL SMALL BUSINESS CONCERN. ********************************************************************* Correction to Souces Sought Notice: A typo is being corrected in the body of this notice, idenified in Bold below. ******************************************************************** SOURCES SOUGHT NOTICE HSCG82-16-B-PMV128-BULKHEAD REPLACEMENT PHASE II AT U.S. COAST GUARD BASE MIAMI BEACH, FL THIS IS A SOURCES SOUGHT NOTICE TO IDENTIFY INTERESTED CONTRACTORS TO DETERMINE THE SET-ASIDE: This project is to furnish all labor, materials, equipment and supervision necessary to replace the bulkhead at U.S. Coast Guard Base Miami Beach, FL. The work includes but not limited to the following: site concrete demolition and disposal, new site work, underwater survey, removal and dispose of debris removal, transportation and transfer of live coral, underwater survey and debris removal, minor excavation of fill behind existing pile cap, removal and installation, of existing cleats, design bulkhead termination and tie-in to existing wall, design and installation of new soil anchors, load tests, concrete fill, concrete pile caps, re-striping new pavement and painting of curbs, and replacement of light poles. All work shall be performed in accordance with the scope of work. The performance period will be 220 calendar days. The estimated value of this procurement is between $1,000,000 and $5,000,000. The applicable North American Industry Class System (NAICS) 2007 code is 237990. The small business size standard is a three-year average annual gross receipt of $33.5 million. Bid, payment, and performance bonds are required. All responsible sources eligible under the set-aside may submit a bid which shall be considered by this agency. The following are Tentative dates for this project: Solicitation issued: March 2016 Bid Opening: April 2016 Contract Performance Completion: May 2017 The solicitation and plans in its entirety and any amendments will be available at no charge online at http://www.fbo.gov under the above solicitation number. The U.S. Coast Guard is considering whether or not to set aside this acquisition for HUBZone concerns, Service-Disabled Veteran-Owned Small Business concerns (SDVOSB) or Small Business concerns. At the present time, this acquisition is expected to be issued as a Small Business set-aside. However, in accordance with FAR 19.1303 and FAR 19.1403, if your firm is HUBZone certified or a Service-Disabled Veteran-Owned Small Business (SDVOSB) and intends to submit an offer on this acquisition, please respond by e-mail to contact@example.gov or fax to +1 (555) 000-0000 with "Sources Sought for Solicitation Number HSCG82-16-B-PMV128" in the subject line. Please reference the above solicitation number in all correspondence pertaining to this project. Your response should include the following: (a) a positive statement of your intent to submit a bid for this solicitation as a prime contractor; (b) a statement identifying your certified small business designation; (c) evidence of experience in work similar in type and scope to include contract numbers, project titles, dollar amounts, points of contact and telephone numbers; and (d) provide evidence of bonding capability to the maximum magnitude of the project, to include both single and aggregate totals. Contractors are reminded that should this acquisition become a HUBZone or SDVOSB set aside, FAR 52.219-3, Notice of Total HUBZone Set-Aside or 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside, will apply. Response is required by February 18, 2016. All of the above must be submitted in sufficient detail for a decision to be made on a HUBZone or Service-Disabled Veteran-Owned Small Business set aside.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS