Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Burnsville Rip Rap

Closed
W9123725QA054Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 327991
New
International
Request for Quotations - 2026 Columbarium Supply and Installation
Solicitation # 235033
The City of Fernie is seeking quotations for the supply, delivery, and installation of a new 56-niche columbarium at St. Margaret’s Cemetery in Fernie, British Columbia. The required unit, model KMI R56 or an approved equivalent, must be configured four niches high by seven niches wide on each side, featuring grey granite for the sides, top, and base, and black granite for the trim and niche doors. The scope of work includes the installation of a 16 by 11 foot concrete foundation slab, assembly of the unit, backfilling, grading, and full site restoration. Proponents must provide a proposed delivery and installation schedule for 2026 and ensure all work complies with the City of Fernie Noise Bylaw 1635. Quotations must include total costs for supply, delivery, foundation, installation, and site restoration, as well as separate pricing for optional items such as niche drapes, rods, and durable protective packaging for niche doors. Evaluation will be based on technical compliance, cost, manufacturer warranty details, and the bidder's experience and capability. The successful bidder must maintain commercial general liability insurance of at least 5 million dollars and vehicle third party liability of 2 million dollars. Responses are due by November 17, 2026, at 2:00 PM MST, and can be submitted via email to Brett Logan or as hard copies. The final agreement will be executed as a Purchase Order.
City of Fernie

POSTED

4 days ago

DEADLINE

in 28 days
NAICS: 327991
SLED
Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
Solicitation # RFB 27-010
The City of Clermont, Florida, through its Public Services - Public Works department, is soliciting bids for the construction, furnishing, delivery, and installation of two double-sided, 48-niche gray granite columbaria and two polished gray granite benches at Oak Hill Cemetery. The project has a budget of $80,000 and requires all new materials that match existing installations in the area. The successful contractor must provide all necessary labor, equipment, and services, ensuring that the columbaria bases measure 7ft-4in x 3ft-4in x 8in and the benches adhere to specific dimensional requirements for the seat, uprights, and base. Bids must be submitted electronically via the OpenGov Portal by November 5, 2026, at 2:00 pm, with the award granted to the lowest responsive and responsible bidder. The period of performance allows for substantial completion within 180 calendar days of the Notice to Proceed, followed by final completion within 30 days. Contractors must comply with OSHA standards, Florida E-Verify requirements, and Davis-Bacon Act prevailing wage rates for Lake County. Payment terms are Net-30 days, and the contractor is required to provide a minimum one-year warranty on all work. While some documents mention bonds, the specific solicitation terms state that bid, performance, and payment bonds are not required, though proof of insurance via an ACORD certificate is mandatory.
Public Services - Public Works

POSTED

13 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract requires the contractor to supply all labor, equipment, and materials necessary to deliver specified quantities of stone to the U.S. Army Corps of Engineers Burnsville Lake Project within 30 days of award. Deliveries are to be coordinated with the government point of contact at least five business days prior to shipment to ensure proper scheduling and equipment availability. Deliveries to Falls Mill are limited to a maximum of four truckloads per day, with specific delivery windows in the morning and early afternoon, while deliveries to Bulltown Campground are scheduled between 8:00 AM and 2:30 PM without a daily quantity limit. The stone must meet strict quality standards, including compliance with West Virginia Department of Transportation specifications, and must be clean, rectangular, and have a sodium sulfate soundness loss of no more than 30 percent. A certification letter confirming compliance with these specifications is required before delivery. The project involves delivering approximately 500 tons of 12-24 inch Rip Rap, 50 tons of 3-inch crusher run, 250 tons of 6-12 inch Rip Rap, and 400 tons of 57 clean gravel to designated locations. The contract is set aside for small businesses under the SBA Total Small Business Set-Aside program, with a solicitation posted on August 14, 2025, and a response deadline of August 21, 2025. The contracting office is the U.S. Army Corps of Engineers Huntington District, located in Huntington, West Virginia, with Travis Adkins serving as the primary contact for inquiries.

General Info

Contractor to deliver specified stone types to two USACE locations within 30 days, small business set-aside.

Contract Value

$53,660

NAICS

327991 - Cut Stone and Stone Product Manufacturing

Place of Performance

1183 Bulltown Campground Rd.Napier, WV 26631, WV, 26631

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts1 person available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more
Contractor shall provide all labor, equipment, and materials required to deliver Stone within 30 days post award, to U.S. Army Corps of Engineers Burnsville Lake Project. Contractor shall notify the government point of contact 5 business days prior to delivery to allow time for the project to get equipment rented to place the stone. The stone being delivered to Falls Mill will need to be delivered on a schedule to reduce the stone having to be rehandled. A maximum of four truck loads can be delivered per day. Two trucks can be delivered between 0800 ? 1000 Eastern Time and the other two trucks can be delivered between 1130 ? 1330 Eastern Time. Delivery to Bulltown Campground shall be scheduled between hours 0800-1430 Eastern Time but does not have a quantity limit per day. All Rip-Rap stone must be clean and meet West Virginia Department of Transportation requirements of the 2000 Standard Specifications, and the 2009 Supplement Standard Specifications under Section 704.2 ? ?Stone For Riprap?. Stone for riprap shall consist of field stone or rough unhewn quarry stone as nearly rectangular in section as is practicable. The material shall have a maximum weighted loss of 30 percent when subjected to five cycles of sodium sulfate soundness test. A letter must be provided prior to delivery stating the Rip Rap meets the specifications. Stone Quantity and Type: 1. 500 Tons of 12?24-inch Rip Rap delivered to Falls Mill2. 50 Tons of 3-inch crusher Run delivered to Falls Mill3. 250 Tons of 6?12-inch Rip Rap delivered to Bulltown Campground 4. 400 Tons of 57 clean gravel delivered to Bulltown Campground

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 237990
New
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS