Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Bus Stop Signage Installation and Demolition

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Bus Stop Signage Installation and Demolition involves performing field removal and installation of bus stop assets for prime contractors on Birmingham-Jefferson County Transit Authority projects. The scope of work includes the removal and disposal of existing signs and poles at 600 locations, followed by the installation of new poles and three-panel assemblies. The contractor is responsible for coordinating traffic control and verifying utility clearance to ensure safe and accurate placement. All work must be performed in strict adherence to ADA requirements and MUTCD standards. Additionally, the project mandates compliance with Davis-Bacon Heavy Construction wages. The final deliverable consists of verified installed assemblies across the designated sites.

General Info

Subcontract for removing and installing bus stop signage at 600 Birmingham-Jefferson County locations.

Documents

This scope was carved out of 2026-03-REBID.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BUS STOP SIGNAGE REPLACEMENT PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAlabama → Procurement Department of Birmingham-Jefferson County Transit Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs field removal and installation of bus stop assets for prime contractors on Birmingham-Jefferson County Transit Authority (BJCTA) projects. Removes and disposes of existing signs and poles at 600 locations and installs new poles and three-panel assemblies. Coordinates traffic control and field verification of utility clearance. Adheres to ADA requirements, MUTCD standards, and Davis-Bacon Heavy Construction wages. Delivers verified installed assemblies.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is soliciting proposals from licensed general contractors for a Master Services Contract to provide on-call maintenance and minor construction services in California. The scope of work includes millwright and welding activities, fire sprinkler system maintenance, general construction such as framing, drywall, and concrete, and the maintenance of conveyors, hoppers, and heavy equipment. Services will be issued via time-and-materials Task Orders, and contractors must be capable of performing both routine and emergency work on short notice. The Authority intends to award multiple contracts based on an evaluation of price, payment terms, proposed work plans, personnel experience, and the ability to perform specific technical tasks. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 p.m. This is a prevailing wage contract subject to the California Labor Code and SB-854, requiring contractors to be registered with the Department of Industrial Relations. Key requirements include the provision of performance and payment bonds for any Task Order exceeding 25,000 dollars and full compliance with OSHA safety standards. Invoices are submitted monthly to the Accounts Payable Department with a standard 30-day payment term, though the Authority offers expedited payment options in exchange for a percentage-based invoice discount.
Inland Empire Utilities Agency

POSTED

8 minutes ago

DEADLINE

in 16 days
View Details

More opportunities from Alabama → Procurement Department of Birmingham-Jefferson County Transit Authority

Same awarding agency

NAICS: 339950
New
SLED
BUS STOP SIGNAGE REPLACEMENT PROJECT
Solicitation # 2026-03-REBID
The Birmingham-Jefferson County Transit Authority (BJCTA) is seeking a Prime Contractor for the Bus Stop Signage Replacement Project to provide a turnkey, systemwide replacement of bus stop sign assemblies and poles across its fixed route service area. This initiative supports the 70 30 Route Redesign Plan and modernization efforts, requiring the fabrication and installation of approximately 600 three-panel sign assemblies. Each assembly consists of a MAX Identification Flag, a Route and Stop Information Panel, and a Stop Identification and Digital Information Panel. The contractor is responsible for the entire process, including design submittals, the provision of a full-size prototype for scan testing, removal and disposal of existing signage, and final surface restoration such as concrete repair and backfilling. Proposals must be submitted via the PlanetBids Vendor Portal by November 12, 2026, at 2:00 PM CST, and must not exceed 75 pages. Evaluation is based on material specifications, such as the use of 0.09 inch aluminum and UV-resistant coatings, compliance with ADA and MUTCD standards, and the quality of the rollout methodology. Key requirements include Buy America compliance, adherence to the Davis-Bacon Act, and the provision of a 5 percent bid bond, as well as performance and payment bonds. Successful bidders must be authorized to conduct business in Alabama and provide a minimum warranty of two years for workmanship and five years for the finish. Final acceptance is determined on a per-location basis upon the correct installation of all three panels and the supporting pole.
Sign Manufacturing

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS