Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

BUT-US127-0.61 PID 120879 (Pleasant Ave)

Active
49701State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fairfield in Ohio is soliciting bids for project BUT-US127-0.61 PID 120879, located on Pleasant Avenue between Hunter Road and Wessel Drive. The scope of work centers on the installation of 7000 feet of separated shared use asphalt path and the resurfacing of Pleasant Avenue between Wessel and Resor, which includes adjusting travel lanes with new pavement markings. The project encompasses a wide range of civil engineering tasks, including earthwork, the installation of storm sewers, 2300 feet of 12 inch water main, retaining walls, signalized crosswalks, concrete work, signage, tree planting, and traffic maintenance. The engineer's estimate for the base bid is 4,907,000 dollars. While previous plans included an alternate for an additional 1.5 inches of intermediate pavement, the city has determined this is no longer required, and corresponding quantities are excluded from the bid form. Interested parties must submit responses by November 17, 2026, under solicitation number 49701.

General Info

Fairfield Ohio bids for Pleasant Avenue path installation and resurfacing by November 17, 2026.

Place of Performance

OH, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 16, 2026 to Nov 17, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Fairfield
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Fairfield
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project Description: The installation of 7000 feet of separated shared use asphalt path. Project includes resurfacing of Pleasant Avenue between Wessel and Resor including new pavement markings to adjust the travel lanes. Project will include installation of storm sewers, curb, 2300 feet of 12" water main, earthwork, retaining walls, signalized crosswalks, etc.
Engineer's Estimate for Base Bid ($4,907,000): Detailed Location Information: Pleasant Avenue between Hunter Road and Wessel Drive Summary of other pertinent details: Work includes earthwork, asphalt work, concrete work, pavement markings, signage, walls, storm sewer, paving, tree planting, seeding and mulching, and maintenance of traffic.
Alternate shown on the plans is for an additional 1.5 inches of intermediated pavement, as per plan. It is no longer the City's intent to explore that alternate and quantities are not included on the bid form for additional pavement depth.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work encompasses site preparation, pipeline and utility installation, and surface improvements. Key activities include land surveying, site clearing, subsurface investigation, shoring, tunneling, boring, jacking, and micro tunneling. Additionally, the project requires the installation of steel casing, cathodic protection, valves, asphalt paving, landscaping, and the provision of traffic signs, signals, and lighting. Material requirements include ready mix supply, precast concrete, and manhole materials, alongside environmental support such as storm water pollution prevention. This solicitation is open to qualified subcontractors and suppliers, with a strong emphasis on Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise certified firms. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for responses is November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

19 minutes ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
26/27-01-PARKS Hendricks Bridge Day Use Area Parking Lot Upgrade
Solicitation # 26/27-01-PARKS
Solicitation 26/27-01-PARKS is an invitation for bids from Lane County Public Works for the Hendricks Bridge Day Use Area Parking Lot Upgrade located in Springfield, Oregon. The project involves a comprehensive scope of work including site preparation, general excavation, the construction of stormwater facilities and drainage structures, and the installation of curbs, sidewalks, and asphalt concrete pavement. Additional requirements include the installation of permanent signage, pavement markings, and site furnishings such as bicycle racks and pay station kiosks. The estimated cost for the project ranges between $500,000 and $750,000, and the contract will be awarded to the lowest responsive and responsible bidder. The project is governed by the 2024 Oregon Standard Specifications for Construction and the 2024 Lane County General Conditions for Construction. Key deadlines include a bid closing date of October 27, 2026, at 10:00 A.M. local time. Performance is divided into two phases, with the majority of work due by April 30, 2027, and all remaining work, including a one-year plant establishment period for water quality facilities, to be completed by April 30, 2028. Bidders must be registered with the Oregon Construction Contractors Board or licensed by the State Landscape Contractors Board and must comply with Oregon prevailing wage laws and non-discrimination certifications. Required security includes bid, performance, and payment bonds, along with comprehensive insurance coverage.
Lane County, OR - Engineering & Construction Services (ECS) Division

POSTED

about 3 hours ago

DEADLINE

in about 23 hours
View Details

More opportunities from Ohio → City of Fairfield

Same awarding agency

NAICS: 237110
New
SLED
2026 Storm Sewer Rehabilitation via PVC Lining
Solicitation # 49474
The City of Fairfield, Ohio, is soliciting bids for the 2026 Storm Sewer Rehabilitation via PVC Lining project, a unit price contract with an engineer's estimate of 175,000 dollars. The scope of work involves the light cleaning and PVC lining of corrugated metal storm sewers across various locations, including Brushback Court, Calumet Way, Claiborne Court, Turtle Creek Drive, Whitney Lane, Gilmore Drive, Varsity Court, Desales Court, Homeward Way, and Resor Road. The project is scheduled for completion within 180 calendar days after the Notice to Proceed, with work commencing within 30 days of that notice. All rehabilitation must strictly adhere to ASTM and NASSCo standards, as well as the City of Fairfield's 2020 Design, Construction, and Materials Specification Handbook. Bids must be submitted electronically via Bid Express by October 26, 2026, at 3:00 P.M. local time. Proposals will be awarded to the lowest and best responsible bidder based on price, technical qualifications, and financial ability. Required submission documents include a 10 percent bid bond, a non-collusion affidavit, an affidavit of non-delinquency of personal property taxes, and evidence of experience with similar projects. The contractor is responsible for all labor, materials, equipment, and necessary permits. Payment will be rendered within 30 days of receiving a proper invoice, with general overhead and profit capped at 15 percent of the actual work cost. Compliance with prevailing wage laws and non-discrimination regulations is mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in about 1 hour
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS