C-2652 L-300A MP 489.390 Recoat Full Span Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

N/A

Place of Performance

San Jose, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Nathaniel GoetzWater Resource Control Engineer

Full Description

Show more
The Permittee will conduct maintenance and repair work for corrosion project 2652 (C-2652) at Mile Point (MP) 489.390 of Gas Pipeline 300A (L-300A), a section of gas line that was designed as an intentional span, in the City of San Jose, Santa Clara County (37.281830, -121.795831). The Project is necessary to minimize potential corrosion from atmospheric exposure along the pipe body and at both air-to-soil transitions where the pipeline span enters and exits the ground. The pipeline spans a perennial spring-fed drainage area with two perennial stream channels below the pipe that are unnamed tributaries to Coyote Creek. The larger perennial watercourse (PW-01) flows from east to west below the pipe. The smaller perennial watercourse (PW-02) begins where an existing polyvinyl chloride (PVC) pipe emerges upstream from the hillside and flows downstream under the pipe before joining PW-01 on the west side of the pipeline. The maintenance activities include clearing vegetation from the workspace surrounding the pipeline span, stripping topsoil (the uppermost 6 to 8 inches) from all areas to be excavated, excavating the air-to-soil transition areas, installing scaffolding below and adjacent to the pipe span, scraping existing pipe wrap at the air-to-soil transitions and sandblasting existing paint off of the pipe, inspecting the bare metal pipe for any anomalies and making any necessary repairs, and recoating and/or repainting the pipe. The pipeline is very close to the ground at this span, limiting access for the necessary maintenance and repair activities